Public Works Department-PWD has published 1 ) repair maintenance of E And M Services Of Vrs Social Welfare Bldg At Sewa Kutir , Kingsway Camp . 2 ) repair maintenance of E And M Services At Juvenile Jail , Majnu Ka Till , Delhi 3 ) repair maintenance of E And M Services At Da Flats , Tima. Submission Date for this Tender is 27-04-2020. Spare Part Tenders in Timarpur Delhi. Bidders can get complete Tender details and download the document.
Name of Work: 1) RMO E&M Services of vrs social welfare bldg at Sewa Kutir, Kingsway Camp.2) RMO E & M services at Juvenile Jail, Majnu Ka Tilla.3) RMO E & M services at DA flats, Timarpur, Delhi. (SH:- Servicing, Overhauling & AMC of Split/Windows ACs & Water Cooler) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Comprehensive running maintenance of Window type A.C unit / Split type A.C unit / Cassettes type A.C units of 1.5 T.R / 2.0 T.R Capacity.water cooler/ ductable AC coloum etc. for Twelve months( 8 months summer+ 4 months winter) after completion of servicing overhauling repairing etc bimonthly as required at site i/c Servicing of WTAC /STAC/Cassette type A.C units including cleaning, washing with High Pressure water spray electric machine, coil cleaning with chemical, blower oiling, greasing including replacement of blower, motor, compressor, PCB, Plug top, 3 core copper conductor cable,Starting/running capacitor of suitable size, relay suitable for 1.5, 2 TR unit, condensor fan, filter PVC, Fan Blades, Thermostat, remote and all types of defective parts for proper functioning of equipments, condenser coil, cooling coil, charging of refrigerant gas to make the already installed W.T. /Split/Cassette type A.C units fully functional with genuine spares and reinstallation of the same etc. \nComplete as required. The AC units/Water Cooler will be handed over to the agency on as it is where it is bases for servicing and comprehensive maintenance. The firm is advised to visit the site, before quoting the rates. All the above units were functional last year, nothing extra shall be paid for above items for making the units fully functional, testing and commissioning complete as reqd.\n(Note:- The contractor is required to complete the servicing & repairing of all Air Conditioning equipments/water coolers within a period of one month and submitt the record to the department. The comprehensive maintenance shall be treated as started only after acceptance by the department that all equipment have been serviced by contractor.) The contractor will handover all the unit in fully functinal condition on completion of the work. Dismentaled material will be taken back by the contractor for which necessary rebate shall be confidence while quoting the rates.(total nos= 208, inventory attached)\na) Summer (8 months) | 8 | Months | |
2 | 1.01 | b) Winter (4 months) | 4 | Months |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail