| 1 | 1 | Dismantling brick work, tile massonary or tile lining and tile terracing in cement. HSr item No. 8.5 (b) | | 1225.84 | Cum |
|---|
| 2 | 2 | Dressing bed & preparation of subgrade for lining. HSR item No. 19.1 | | 9529.12 | Sqm |
|---|
| 3 | 3 | Supply of 100 micron thick polythene sheet to be laid under bed lining as per approved drawing & design section (As per CAD Authority) | | 897.64 | Kg |
|---|
| 4 | 4 | Laying of 100 micron polythene under bed lining as per drawing, design and PWD specification (N.S. item) (As per CADA) complete in all respect. | | 9529.12 | Sqm |
|---|
| 5 | 5 | Laying of 7.62 cm thick 1st class brick work in 1:5 cement sand mortar in bed over 100 micron polythene as per approved design, drawing & PWD specification i/c supply & carriage of material. Complete in all respect. HSR item No. 11.3 | | 9529.12 | Sqm |
|---|
| 6 | 6 | Laying 1st class brick work in 1:5 cement sand mortar in foundation and plinth as per approved design, drawing & PWD Specification i/c supply & carriage of material complete in all respect. HSR item No. 11.3 | | 1068.1 | Cum |
|---|
| 7 | 7 | Kassi work dully dressed involves an average horizontal throw upto 2mm & average vertical lift 0.50meter i/c breaking of clods. HSR item nol 6.2(a), 6.3(i) | | 154.97 | %Cum |
|---|
| 8 | 8 | Kassi work undressed involving an average horizontal throw upto 2 meter and an average vertical lift upto 0.50meter i/c breaking of clods. HSR item nol 6.2(a) | | 719.36 | %Cum |
|---|
| 9 | 9 | E/work excavation in filling in ordinary soil exclusive of compensation of earth work duly dressed with combined lead upto 15 mtr i/c breaking of clods as per approved design, drawing & PWD specification. | | 2023.86 | %Cum |
|---|
| 10 | 10 | E/work (exclusive of compensation for earth) in excavation in ordinary soil and filling in 15 cm layers, in foundation & plinth i/c ramming, watering & consolidation under flors with earth brought from a distance not exceeding 30 mtrs (under bed) as per approved design drawing & PWD specification. | | 291.65 | %Cum |
|---|
| 11 | 11 | Cement Concrete 1:4:8 with brick ballast 40mm nominal size in foundation and plinth as per approved design, drawing & PWD specification i/c supply & carriage of material. Complete in all respect. HSR item No. 10.36 | | 30.4 | Cum |
|---|
| 12 | 12 | Laying 1st class brick work in 1:3 cement sand mortar in foundation and plinth as per approved design, drawing & PWD Specification i/c supply & carriage of material complete in all respect. HSR item No. 11.5 | | 30.87 | Cum |
|---|
| 13 | 13 | Extra for brick work in arches including cost of shuttering upto 1.5 m span. HSR item No. 11.44(a) | | 30.87 | Cum |
|---|
| 14 | 14 | 10 mm thick cement plaster in 1:4 ratio cement sand mortar as per approved design, drawing & PWD specification i/c supply & carriage of materials, water supply of arrangement & curing complete in all respect. | | 2256.97 | Sqm |
|---|
| 15 | 15 | Supply of RCC pannel of requisite sizes 39\"X39\" at site of work as per approved drawing design & PWD specifications (As per CADA) | | 189 | Nos |
|---|
| 16 | 16 | Fixing of RCC pannel of requisite sizes 39\"X39\" at site of work as per approved drawing design & PWD specifications (As Per CADA) | | 189 | Nos |
|---|
| 17 | 17 | Supply of RCC lid of requisite sizes 33\" dia as per approved drawing design & PWD Specification (as per CADA) | | 106 | Nos |
|---|
| 18 | 18 | Credit of dismentalled materialof brick work in cement sand mortar | | 1225.84 | Cum |
|---|