| 1 | 0 | NOTE:- (Applicable for all parts/items/):- The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1 | Design, prepare structural drawing, fabrication, supply, transportation and erection of prefabricated shelters, double storied building as per drawing No CWE/DIN/PREFAB/01/2019 dated 26 Nov 2019 including footings, floorings, sanitary blocks and fittings, water tanks, paintings, anchor bolt, base plate, all structural steel items, roofing and wall cladding with 50 mm thick polyurethane sandwich panel made of galvalume sheet, gutters, flashings, rainwater pipes. The design and drawing shall be vetted from any IITs/NITs/Government Engineering College. | BI01010001010000000000000515BI0100001113 | 1 | Lump-sum |
|---|
| 3 | 2 | Lump sum price worked out by the tenderer for Excavation and Earth works as listed in Schedule ‘A’ Part-II | BI01010001010000000000000515BI0100001114 | 1 | Lump-sum |
|---|
| 4 | 3 | Lump sum price worked out by the tenderer for Internal Electrification as listed in Schedule ‘A’ Part-III | BI01010001010000000000000515BI0100001115 | 1 | Lump-sum |
|---|
| 5 | 4 | Lump sum price worked out by the tenderer for Internal Water Supply as listed in Schedule ‘A’ Part-IV | BI01010001010000000000000515BI0100001116 | 1 | Lump-sum |
|---|
| 6 | 5 | Lump sum price worked out by the tenderer for Road, Path and Culvert as listed in Schedule ‘A’ Part-V | BI01010001010000000000000515BI0100001117 | 1 | Lump-sum |
|---|
| 7 | 6 | Lump sum price worked out by the tenderer for Sewage Disposal as listed in Schedule ‘A’ Part-VI | BI01010001010000000000000515BI0100001118 | 1 | Lump-sum |
|---|
| 8 | 7 | Lump sum price worked out by the tenderer for External Water Supply as listed in Schedule ‘A’ Part-VII | BI01010001010000000000000515BI0100001119 | 1 | Lump-sum |
|---|
| 9 | 8 | Lump sum price worked out by the tenderer for External Electrification as listed in Sch 'A' Part VIII | BI01010001010000000000000515BI0100001120 | 1 | Lump-sum |
|---|