Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 05-May-202 | Corrigendum 1 | Other | 25-05-2020 |
2 | 14-May-202 | Corrigendum_2 | Date | 10-06-2020 |
3 | 22-May-202 | Corrigendum_4 | Other | 10-06-2020 |
4 | 28-May-202 | Corrigendum_6 | Date | 22-06-2020 |
5 | 01-Jun-202 | Corrigendum_7 | BOQ | 22-06-2020 |
6 | 02-Jun-202 | Corrigendum_8 | Other | 22-06-2020 |
7 | 03-Jun-202 | Corrigendum_9 | Other | 22-06-2020 |
8 | 04-Jun-202 | Corrigendum_10 | Date | 08-07-2020 |
9 | 17-Jun-202 | Corrigendum_11 | Date | 20-07-2020 |
10 | 03-Jul-202 | Corrigendum_12 | Date | 05-08-2020 |
11 | 22-Jul-202 | Corrigendum_13 | Date | 19-08-2020 |
12 | 07-Aug-202 | Corrigendum_14 | Date | 10-09-2020 |
Name of Work: Supply, Installation, Commissioning & Annual Maintenance & Operation Contract of On Line Monitoring of Rolling Stock (OMRS) consisting of Acoustic Bearing Detector (ABD) and Wheel Impact Load Detector (WILD) on Dedicated Freight Corridor (DFC) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Design, Development, Manufacture and supply of wayside data collection equipment ABD (Acoustic Bearing Detector) and Wheel Impact Load Detector (WILD) for \nOnline monitoring of rolling stock system (OMRS) with requisite cabling as per specifications | |||
2 | 1.01 | ABD (Acoustic bearing detector) - landed cost DDP | item1 | 11 | Nos |
3 | 1.02 | ABD (Acoustic bearing detector) - foundation | item2 | 11 | Nos |
4 | 1.03 | WILD (Wheel Impact Load Detector) - landed cost DDP | item3 | 11 | Nos |
5 | 1.04 | WILD (Wheel Impact Load Detector) - foundation | item4 | 11 | Nos |
6 | 2 | Equipment Hut with necessary instrumentation and software for acoustic signature analysis of bearing detection and wheel impact detection (preferably acoustic based) and integration with other data stream including vehicle identification, network data connectivity software & infrastructure from site to control room and provisions for online UPS & back up for 16 hours. Media converters or routers for fibre cable connection. Lightning and surge earthing to be provided. Structure to house the equipments with outside paved floor all around and security xpm barrier | item5 | 8 | Nos |
7 | 3 | Provision including cabling for connecting to the Power supply and data network from point given by DFC | |||
8 | 3.01 | Cost of power cable for 1 kilometres, 230 V and single phase with duct | item6 | 8 | Nos |
9 | 3.02 | Optical connection: Cost of 6 core corrugated armoured optical fibre cable (OFC) with duct for 1 kilometre, along with Small form factor (SFP) device ( to convert electrical signal to optical signal or vice-versa )/equipments for connection to DFC OFC. | item7 | 8 | Nos |
10 | 4 | Audio-visual Alarm node with 500 VA UPS and LAN patch-up equipment For connecting to DFCCIL network at the workshops and Headquarter with facility for real time alarms. | |||
11 | 4.01 | Hardware | item8 | 11 | Nos |
12 | 4.02 | Software | item9 | 11 | Nos |
13 | 5 | Central Control with necessary software, database, network data connectivity infrastructure to OFC and Internet, provision for network security and monitoring, large display system, lighting, air-conditioning, Signage and furnishing, lightning and surge protection (Building space will be provided by DFCCL) , Back-up time of 16 hours. Approx. total area 4500 sq. feet | |||
14 | 5.01 | Hardware | item10 | 2 | Nos |
15 | 5.02 | Software | item11 | 1 | Nos |
16 | 5.03 | Connectivity centre at DFC HQ | item12 | 1 | Nos |
17 | 6 | Comprehensive annual maintenance & operation contract (AMOC) including spares for a period of 5 years including warranty period of 3 years. Operation of OMRS including connectivity and calibration kit during 3 years warranty and 2 years AMC period (Total 5 Years) including site security, operation at control centre (3 shifts + LR) (For Complete 11 Set of OMRS Equipments.) | |||
18 | 6.01 | 1st year AMOC cost , (PV Factor = .7513) | item13 | 1 | Nos |
19 | 6.02 | 2nd year AMOC cost, (PV factor = .6830) | item14 | 1 | Nos |
20 | 6.03 | 3rd year AMOC cost, (PV factor = .6209) | item15 | 1 | Nos |
21 | 6.04 | 4th year AMOC cost, (PV factor = .5645) | item16 | 1 | Nos |
22 | 6.05 | 5th year AMOC cost, (PV factor = .5132) | item17 | 1 | Nos |
23 | 7 | Comprehensive annual maintenance & operation contract (AMOC) including spares for a period of 10 years after 5 years. Operation of OMRS including connectivity and calibration kit during 10 Year AMC period (Total 10 Years) including site security, operation at control centre (3 shifts + LR) (For Complete 11 Set of OMRS Equipments.) | |||
24 | 7.01 | 6th year AMOC cost, (PV factor = .4665) | item18 | 1 | Nos |
25 | 7.02 | 7th year AMOC cost, (PV factor = .4241) | item19 | 1 | Nos |
26 | 7.03 | 8th year AMOC cost, (PV factor = .3855) | item20 | 1 | Nos |
27 | 7.04 | 9th year AMOC cost, (PV factor = .3505) | item21 | 1 | Nos |
28 | 7.05 | 10th year AMOC cost, (PV factor = .3186) | item22 | 1 | Nos |
29 | 7.06 | 11th year AMOC cost, (PV factor = .2897) | item23 | 1 | Nos |
30 | 7.07 | 12th year AMOC cost, (PV factor = .2633) | item24 | 1 | Nos |
31 | 7.08 | 13th year AMOC cost, (PV factor = .2394) | item25 | 1 | Nos |
32 | 7.09 | 14th year AMOC cost, (PV factor = .2176) | item26 | 1 | Nos |
33 | 7.1 | 15th year AMOC cost, (PV factor = .1978) | item27 | 1 | Nos |
34 | 7.11 | NB: AMOC cost will be calculated after multiplying quoted rates with PV factor i.e. after discounting annual cost @ 10% per annum | |||
35 | 8 | Training | |||
36 | 8.01 | Training of DFCCIL staff at site for operation, maintenance and interpretation of measured data. | item28 | 1 | Nos |
37 | 8.02 | Training at manufacturer premises for 5 key personnel for 6 mandays each | item29 | 1 | Nos |
38 | 9 | Cost of Validation, trial and commissioning prove out for initial 1st set of equipments | item30 | 1 | Nos |
39 | 10 | Supply, installation and commissioning of PVIS ( Photographic vehicle identification system) at each site (upto DDP locations) | item31 | 11 | Nos |
40 | 11 | Agency commission, if any | item32 | 1 | Nos |