| 1 | 1 | Excavation of earth in ordinary soil (loam, clay or sand) for pipe line trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour, T&P etc complete as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001130 | 1049 | Cum |
|---|
| 2 | 2 | Supply of following sizes PVC/HDPE Pipe (Successfully tested from M/S Crown Agents India Pvt. Ltd. New Delhi / CIPET Lucknow) for distribution system conforming to latest/ relevant I.S. Specifications with all jointing materials and specials conforming to latest /relevant I.S. specifications including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing of pipe lines and cutting of pipes for making up the length but excluding the cost of trenches) all complete as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001133 | | |
|---|
| 3 | 2.1 | 63 MM DIA PVC PIPE 6kg/cm2 | BI01010001010000000000000515BI0100001171 | 1500 | Rmt |
|---|
| 4 | 3 | Supply and carting up to site of work of the following dia C.I. butterfly /sluice valves, scour valves class I, working pressure 10 Kg/cm2 confirming to IS: 780/1969 or its latest amendments, F.O.R. destination, and lowering them into the already prepared trenches, fixing in position and jointing them with pipelines and testing etc. complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001138 | | |
|---|
| 5 | 3.1 | SLUICE VALVE- 50 MM DIA | BI01010001010000000000000515BI0100001167 | 3 | Nos |
|---|
| 6 | 4 | Construction of following type chambers as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete for proper completion of work as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001145 | | |
|---|
| 7 | 4.1 | Sluice valve chamber (surface box Type) | BI01010001010000000000000515BI0100001147 | 3 | Nos |
|---|
| 8 | 5 | Dismantling of Following type of surfaces including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto a distance of 50m as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001152 | | |
|---|
| 9 | 5.1 | Bituminous surface | BI01010001010000000000000515BI0100001156 | 15 | Sqm |
|---|
| 10 | 5.2 | C.C. surface | BI01010001010000000000000515BI0100001153 | 510 | Sqm |
|---|
| 11 | 5.3 | B.O.E. surface | BI01010001010000000000000515BI0100001195 | 120 | Sqm |
|---|
| 12 | 5.4 | Interlocking Roads | BI01010001010000000000000515BI0100001196 | 475 | Sqm |
|---|
| 13 | 6 | Reinstatement of the following type of road surface with old and new materials including supply of all materials, labour, T&P etc. required for proper completion of the work as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001160 | | |
|---|
| 14 | 6.1 | Bituminous surface | BI01010001010000000000000515BI0100001199 | 15 | Sqm |
|---|
| 15 | 6.2 | C.C.. surface | BI01010001010000000000000515BI0100001197 | 510 | Sqm |
|---|
| 16 | 6.3 | B.O.E. surface | BI01010001010000000000000515BI0100001180 | 120 | Sqm |
|---|
| 17 | 6.4 | Interlocking Roads (including 1:6:12 base concrete 75mm thick) | BI01010001010000000000000515BI0100001198 | 475 | Sqm |
|---|
| 18 | 7 | Provision for following types of Culvert crossing / trench less road crossing as per departmental type design and drawing including shifting of telephone cables etc. along the alignment of pipe line including supply of D.I. / MS /GI casing pipes and specials, and their laying and jointing testing etc. complete as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001157 | | |
|---|
| 19 | 7.1 | Road crossing | BI01010001010000000000000515BI0100001158 | 12 | mtr |
|---|
| 20 | 7.2 | Culvert crossing | | 10 | mtr |
|---|
| 21 | 8 | Inter-connection in proposed new pipeline with existing pipe including excavation of trenches, supply of all materials, specials, labour T&P bailing out of water etc complete. | | 5 | Job |
|---|
| 22 | 9 | House Connection work\nMaking house connection with 20 MM (O.D.) HPDE pipe (PE-80) (average length will be 10m) in existing PVC/HDPE/AC/DI distribution line including cost of Brass ferrule, saddle, wheel valve and 15 mm dia medium class G.I. Pipe ( 1.35 meter ) including all G.I. specials as nipple, socket, elbow etc. with heavy duty C.I.Bib Cock with brass spindle including fixing on wall with bracket/fixing with concrete block 20cmX20cmX40cm in M-20 grade incuding all Labour, T&P etc. complete as per departmental type drawing and design ( drawing D-12 attached ). | BI01010001010000000000000515BI0100001191 | | |
|---|
| 23 | 9.1 | In 63mm to 140mm dia pipe line | BI01010001010000000000000515BI0100001192 | 400 | Nos |
|---|
| 24 | 9.2 | In 160mm to 300 mm dia pipe line | BI01010001010000000000000515BI0100001193 | 127 | Nos |
|---|