Rfp For Three Years Repair Rate Contract For Evac Vaccuum Toilet System And Sewage Treatment Plants For In Ships And Yard Crafts At Nsry Karwar Repair/ Routines Of Evac Vaccuum Toilet System And Sewage Treatment Plants For In Ships And Yard Crafts, Naval Ship Repair Yard Karwar-Karnataka

Indian Navy-IN has published Rfp For Three Years Repair Rate Contract For Evac Vaccuum Toilet System And Sewage Treatment Plants For In Ships And Yard Crafts At Nsry Karwar Repair/ Routines Of Evac Vaccuum Toilet System And Sewage Treatment Plants For In Ships And Yard Crafts. Submission Date for this Tender is 11-05-2020. Tanks and Cylinders Tenders in Naval Ship Repair Yard Karwar Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

24167449
Corrigendum : Rfp For Three Years Repair Rate Contract For Evac Vaccuum Toilet System And Sewage Treatment Plants For In Ships And Yard Crafts At Nsry Karwar Repair/ Routines Of Evac Vaccuum Toilet System And Sewage Treatment Plants For In Ships And Yard Crafts
National Competitive Bid
Indian
Karnataka
Naval Ship Repair Yard Karwar
11-05-2020

Tender Details

Rfp For Three Years Repair Rate Contract For Evac Vaccuum Toilet System And Sewage Treatment Plants For In Ships And Yard Crafts At Nsry Karwar Repair / Routines Of Evac Vaccuum Toilet System And Sewage Treatment Plants For In Ships And Yard Crafts , Part 1 - Vacuum Toilet System Evac Vacuum Toilet System - Ejector Type - ( Ins Aditya , Ins Subhadra And Ins Suvarna ) , Vacuum Pump , Completed Overhauling Of Pump , Completed Overhauling Of Motor , Defect Rectification Of Vacuum Pump , Rewinding Of Motor , Replacement Of Pump , Ejector , Chemical Cleaning And Overhauling Of Ejector , Removal , Chemical Cleaning And Fitting Back Of Nozzle , Cleaning / Renewal Of Non Return Flap , Collection Tank , Chemical Cleaning Of Evac Collection Tank ( I ) Opening Of Manhole Door And Checking The H2s Level In The Tank . ( Ii ) Ventilation Of The Tank ( Iii ) Removal Of Sewage Water From The Tank ( Iv ) Flusing Of Tank With Sea / Fresh Water ( V ) Check For Any Damage To The Tank / Connecting Nozzles ( Vi ) Minor Cold Repair Of The Tank If Any , Cleaning And Checking Of Level Switch , Replacement Of Level Switch , Cleaning Of Manifold Piping And Instrument Valves , Cleaning And Calibration / Setting Of Vacuum Switch , System Valves , Overhauling Of Gate Valve - Size Dn 65 , Renewal Of Valve Spindle / Stem - Size Dn 65 , Renewal Of Valve Seat ( Rubber Moulded Resilient Valve Seat ) - Size Dn 65 , Overhauling Of Gate Valve - Size Dn 100 , Renewal Of Valve Spindle / Stem - Size Dn 100 , Renewal Of Valve Seat ( Rubber Moulded Resilient Valve Seat ) - Size Dn 100 , Overhauling Of Motorised Valve - Size Dn 65 , Replacement Of Valve , Control Panel , Overhauling Of Complete Control Panel , Defect Rectification Of Control Panel , Checking Of Interface With Stp , Evac Vacuum Toilet System - Onlineflex Type - ( Ins Makar ) , Vacuum Pump , Complete Overhauling Of Pump ( Onlineflex Pump ) , Complete Overhauling Of Motor , Defect Recrification Of Vacuum Pump , Rewindong Of Motor , Replacement Of Pump , System Valves , Overhauling Of Ball Valve , Overhauling Of Non Return Valve , Renewal Of Valve , Cleaning Of Vacuum Manifold Piping And Instrument Valves , Cleaning Of Catcher Unit , Control Panel , Defect Rectification Of Control Panel ( Excluding Plc ) , Replacement And Programming Of Plc , Overhauling Of Complete Control Panel , Evac Vacuum Toilet System , Vacuum Interface Valves And Vacuum Piping ( Ins Aditya , Ins Makar , Ins Suvarna & Ins Subhadra ) , Vacuum Toilet , Complete Overhauling Of Vacuum Toilet , Defect Rectification Of Vacuum Toilet , Repair / Renewal Of Toilet Foundation ( Fabrication Work ) , Replacement Of Vacuum Toilet , Vacuum Interface Valve , Complete Overhauling Of Vacuum Interface Valve , Defect Rectification Of Vacuum Interface Valve , Repair / Renewal Of Vacuum Interface Valve Foundation , Renewal Of Vacuum Interface Valve , Vacuum Interface Valve ( Scupper Type ) , Complete Overhauling Of Vacuum Interface Valve , Defect Rectification Of Vacuum Interface Valve , Vacuum Piping , Repair Of Vacuum Connection ( Deck Piece ) , Renewal Of Deck Piece ( Fabrication Work ) , Chemical Cleaning Of Vacuum Piping By Removal Of Piping , Mechanical And Chemical Cleaning Of Piping , Pressure / Vacuum Testing Of Piping And Fittment ( Per Mtr ) , Renewal Of Vacuum Piping ( Ms Schedule 40 ) Excluding Piping Material ( Per Mtr ) , Identification Of Vacuum Leakage In System , Vacuum Generator Trials , Testing And Trials Of The Vacuum Generator In Manual And Auto Mode , Part 2 - Sewage Treatment Plant Sewage Treatment Plant - Orca Ii A 165 With Chlorine Generator ( Ins Makar ) , Treatment Tank , Chemical Cleaning Of Tank ( I ) Opening Of Tank Cover And Checking The H2s Level In The Tank . ( Ii ) Ventilation Of The Tank ( Iii ) Removal Of Sewage Water From The Tank . ( Iv ) Flushing Of Tank With Sea / Fresh Water ( V ) Check For Any Damage To The Tank / Connecting Nozzles ( Vi ) Minor Cold Repair Of The Tank If Any , Internal Coating Of Tank , Cleaning And Checking Of Lever Switch , Replacement Of Level Switch , Cleaning And Checking Of Internal Components Like Spray Nozzles , Screen , Cleaning Of Sacrificial Anode , Renewal Of Sacrificial Anode , Sedimentation Tanks , Chemical Cleaning Of Tank ( I ) Opening Of Tank Cover And Checking The H2s Level In The Tank . ( Ii ) Ventilation Of The Tank ( Iii ) Removal Of Sewage Water From The Tank . ( Iv ) Flushing Of Tank With Sea / Fresh Water ( V ) Check For Any Damage To The Tank / Connecting Nozzles ( Vi ) Minor Cold Repair Of The Tank If Any , Internal Coating Of Tank , Cleaning And Checking Of Float Valve , Replacement Of Float Valve , System Valves , Cleaning / Renewal Of Ball Valves / Flow Control Valve , Overhauling Of Solenoid Valve , Cleaning And Overhauling Of Stp Discharge Valve , Replacement Of Stp Discharge Valve , Sea Water Pump , Sludge Pump , Flow Pump And Discharge Pump , Complete Overhauling Of Pump , Complete Overhauling Of Motor , Defect Rectification Of Pump , Replacement Of Pump , Rewinding Of Motor , Dosing Pump , Complete Overhauling Of Pump , Defect Rectification Of Pump , Replacement Of Pump , Sewage Treatment Plant - Orca Ii A 165 With Chlorine Generator ( Ins Makar ) , Stp Control Panel , Check And Clean The Electrical Components And Switches , Repair Of Control Panel , Replacement Of Plc , Overhauling Of Complete Control Panel , Chlorine Generator , Overhauling / Defect Rectification Of Chlorine Generator , Chlorine Generator Control Panel , Repair Of Control Panel , Overhauling Of Complete Control Panel , Stp System Piping , Chemical Cleaning Of Stp Piping ( Internal Piping Within Stp ) , Stp Trials , Testing And Trials Of The Stp In Manual And Auto Mode , Evac Sewage Treatment Plant - Type- Orca Iii ( Ins Aditya And Ins Suvarna ) , Sedimentation Tank , Chemical Cleaning Of Tank ( I ) Opening Of Tank Cover And Checking The H2s Level In The Tank . ( Ii ) Ventilation Of The Tank ( Iii ) Removal Of Sewage Water From The Tank . ( Iv ) Flushing Of Tank With Sea / Fresh Water ( V ) Check For Any Damage To The Tank / Connecting Nozzles ( Vi ) Minor Cold Repair Of The Tank If Any , Internal Coating Of Tank , Cleaning And Checking Of Minim Skimmer , Cleaning And Checking Of Lamella Plates , Oxidising Tank , Chemical Cleaning Of Tank ( I ) Opening Of Tank Cover And Checking The H2s Level In The Tank . ( Ii ) Ventilation Of The Tank ( Iii ) Removal Of Sewage Water From The Tank . ( Iv ) Flushing Of Tank With Sea / Fresh Water ( V ) Check For Any Damage To The Tank / Connecting Nozzles ( Vi ) Minor Cold Repair Of The Tank If Any , Internal Coating Of Tank , Cleaning And Checking Of Level Switch , Replacement Of Level Switch , Evac Sewage Treatment Plant - Type- Orca Iii ( Ins Aditya And Ins Suvarna ) , System Valves , Cleaning Of Ball Valves , Replacement Of Pvc Ball Valve , Defect Rectification Of Electro-Pneumatic Valve , Overhauling Of Electro-Pneumatic Valve , Replacement Of Electro-Pneumatic Valve , Defect Rectification Of Solenoid Valve , Overhauling Of Solenoid Valve , Replacement Of Solenoid Valve , Cleaning Of Ss Ball Valves , Replacement Of Ss Ball Valves , System Components , Cleaning Of Brushaway Filter , Renewal Of Brushaway Filter , Overhauling Of Brushaway Filter , Cleaning Of Static Mixer , Renewal Of Static Mixer , Checking Of Sacrificial Anode , Renewal Of Sacrificial Anode , Cleaning Of Non Return Valve , Replacement Of Non Return Valve , Cleaning / Renewal Of Hypochlorite Chemical Tank , Sea Water Pump , Recirculation / Discharge Pump , Macerator Pump And Sludge Pump , Complete Overhauling Of Pump , Complete Overhauling Of Motor , Defect Rectification Of Pump , Replacement Of Pump , Rewinding Of Motor , Hypochlorite Dosing Pump And Floculant Dosing Pump , Complete Overhauling Of Pump , Defect Rectification Of Pump , Replacement Of Pump , Stp Control Panel , C

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 04-May-2020 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 11-05-2020

Key Value

Document Fees
Refer document
EMD
INR 1200000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: THREE YEARS RRC FOR EVAC VACUUM TOILET SYSTEM AND SEWAGE TREATMENT PLANTS ONBOARD IN SHIPS AND YARD CRAFTS AT NSRY (KARWAR)
Sl. No. Item Description Item Code / Make Quantity Units
1 1 PART 1 - Vacuum Toilet System Evac Vacuum Toilet System - Ejector Type - (INS Aditya, INS Subhadra and INS Suvarna)
2 1.1 Vacuum Pump
3 1.11 Completed Overhauling of Pump 9 Nos
4 1.12 Completed Overhauling of Motor 9 Nos
5 1.13 Defect rectification of vacuum pump 9 Nos
6 1.14 Rewinding of Motor 9 Nos
7 1.15 Replacement of Pump 9 Nos
8 1.2 Ejector
9 1.21 Chemical cleaning and overhauling of Ejector 9 Nos
10 1.22 Removal, chemical cleaning and fitting back of nozzle 9 Nos
11 1.23 Cleaning /renewal of non return flap 9 Nos
12 1.3 Collection Tank
13 1.31 Chemical cleaning of Evac collection tank\n(i) Opening of Manhole door and checking the H2S level in the tank.\n(ii) Ventilation of the tank\n(iii) Removal of Sewage Water from the tank\n(iv) Flusing of tank with Sea / fresh water\n(v) Check for any damage to the tank / connecting nozzles\n(vi) Minor cold repair of the tank if any 9 Nos
14 1.32 Cleaning and checking of Level switch 9 Nos
15 1.33 Replacement of level switch 9 Nos
16 1.34 Cleaning of manifold piping and instrument valves 9 Nos
17 1.35 Cleaning and calibration / setting of Vacuum switch 9 Nos
18 1.4 System Valves
19 1.41 Overhauling of Gate Valve - Size DN 65 9 Nos
20 1.42 Renewal of valve spindle / stem - Size DN 65 9 Nos
21 1.43 Renewal of valve seat (Rubber moulded resilient valve seat) - Size DN 65 9 Nos
22 1.44 Overhauling of Gate Valve - Size DN 100 9 Nos
23 1.45 Renewal of valve spindle / stem - Size DN 100 9 Nos
24 1.46 Renewal of valve seat (Rubber moulded resilient valve seat) - Size DN 100 9 Nos
25 1.47 Overhauling of Motorised Valve - Size DN 65 9 Nos
26 1.48 Replacement of valve 9 Nos
27 1.5 Control Panel
28 1.51 Overhauling of complete control panel 9 Nos
29 1.52 Defect rectification of control panel 9 Nos
30 1.53 Checking of interface with STP 9 Nos
31 2 Evac Vacuum Toilet System - Onlineflex Type - (INS Makar)
32 2.1 Vacuum Pump
33 2.11 Complete Overhauling of Pump (Onlineflex Pump) 3 Nos
34 2.12 Complete Overhauling of Motor 3 Nos
35 2.13 Defect recrification of vacuum pump 3 Nos
36 2.14 Rewindong of Motor 3 Nos
37 2.15 Replacement of pump 3 Nos
38 2.2 System Valves
39 2.21 Overhauling of Ball Valve 3 Nos
40 2.23 Overhauling of Non Return Valve 3 Nos
41 2.24 Renewal of valve 3 Nos
42 2.25 Cleaning of vacuum manifold piping and instrument valves 3 Nos
43 2.26 Cleaning of catcher unit 3 Nos
44 2.3 Control Panel
45 2.31 Defect rectification of control panel (Excluding PLC) 3 Nos
46 2.32 Replacement and Programming of PLC 3 Nos
47 2.33 Overhauling of complete control panel 3 Nos
48 3 Evac Vacuum Toilet System, Vacuum Interface Valves and Vacuum Piping (INS Aditya, INS Makar, INS Suvarna & INS Subhadra)
49 3.1 Vacuum Toilet
50 3.11 Complete overhauling of Vacuum toilet 12 Nos
51 3.12 Defect rectification of vacuum toilet 12 Nos
52 3.13 Repair / Renewal of toilet foundation (Fabrication work) 12 Nos
53 3.14 Replacement of Vacuum toilet 12 Nos
54 3.2 Vacuum Interface Valve
55 3.21 Complete overhauling of Vacuum Interface Valve 12 Nos
56 3.22 Defect rectification of Vacuum Interface Valve 12 Nos
57 3.23 Repair / Renewal of Vacuum Interface Valve foundation 12 Nos
58 3.24 Renewal of Vacuum Interface Valve 12 Nos
59 3.3 Vacuum Interface Valve (Scupper Type)
60 3.31 Complete overhauling of Vacuum Interface Valve 12 Nos
61 3.32 Defect rectification of Vacuum Interface Valve 12 Nos
62 3.4 Vacuum Piping
63 3.41 Repair of vacuum connection (Deck piece) 12 Nos
64 3.42 Renewal of deck piece (Fabrication work) 12 Nos
65 3.43 Chemical cleaning of vacuum piping by removal of piping, mechanical and chemical cleaning of piping, Pressure / vacuum testing of piping and fittment (Per Mtr) 12 Nos
66 3.44 Renewal of vacuum piping (MS schedule 40) excluding piping material (Per Mtr) 12 Nos
67 3.45 Identification of vacuum leakage in system 12 Nos
68 3.5 Vacuum Generator Trials
69 3.51 Testing and trials of the Vacuum Generator in Manual and Auto mode 12 Nos
70 4 PART 2 - Sewage Treatment Plant\nSewage Treatment Plant - ORCA II A 165 with Chlorine Generator (INS Makar)
71 4.1 Treatment Tank
72 4.11 Chemical cleaning of tank\n(i) Opening of tank cover and checking the H2S level in the tank.\n(ii) Ventilation of the tank\n(iii) Removal of Sewage Water from the tank.\n(iv) Flushing of tank with Sea / fresh water\n(v) Check for any damage to the tank / connecting nozzles\n(vi) Minor cold repair of the tank if any 3 Nos
73 4.12 Internal coating of tank 3 Nos
74 4.13 Cleaning and checking of Lever switch 3 Nos
75 4.14 Replacement of level switch 3 Nos
76 4.15 Cleaning and checking of internal components like spray nozzles, screen 3 Nos
77 4.16 Cleaning of Sacrificial Anode 3 Nos
78 4.17 Renewal of Sacrificial Anode 3 Nos
79 4.2 Sedimentation Tanks
80 4.21 Chemical cleaning of tank\n(i) Opening of tank cover and checking the H2S level in the tank.\n(ii) Ventilation of the tank\n(iii) Removal of Sewage Water from the tank.\n(iv) Flushing of tank with Sea / fresh water\n(v) Check for any damage to the tank / connecting nozzles\n(vi) Minor cold repair of the tank if any 3 Nos
81 4.22 Internal coating of tank 3 Nos
82 4.23 Cleaning and checking of float valve 3 Nos
83 4.24 Replacement of Float valve 3 Nos
84 4.3 System Valves
85 4.31 Cleaning / Renewal of ball valves / Flow control valve 3 Nos
86 4.32 Overhauling of Solenoid valve 3 Nos
87 4.33 Cleaning and Overhauling of STP discharge valve 3 Nos
88 4.34 Replacement of STP discharge valve 3 Nos
89 4.4 Sea Water pump, Sludge pump, Flow pump and Discharge pump
90 4.41 Complete Overhauling of Pump 3 Nos
91 4.42 Complete Overhauling of Motor 3 Nos
92 4.43 Defect rectification of pump 3 Nos
93 4.44 Replacement of pump 3 Nos
94 4.45 Rewinding of Motor 3 Nos
95 4.5 Dosing pump
96 4.51 Complete Overhauling of Pump 3 Nos
97 4.52 Defect rectification of pump 3 Nos
98 4.53 Replacement of pump 3 Nos
99 5 Sewage Treatment Plant - ORCA II A 165 with Chlorine Generator (INS Makar)
100 5.1 STP Control Panel
101 5.11 Check and clean the electrical components and switches 3 Nos
102 5.12 Repair of control panel 3 Nos
103 5.13 Replacement of PLC 3 Nos
104 5.14 Overhauling of complete control panel 3 Nos
105 5.2 Chlorine Generator
106 5.21 Overhauling / Defect rectification of Chlorine generator 3 Nos
107 5.3 Chlorine Generator Control Panel
108 5.31 Repair of control panel 3 Nos
109 5.32 Overhauling of complete control panel 3 Nos
110 5.4 STP system piping
111 5.41 Chemical cleaning of STP piping (Internal piping within STP) 3 Nos
112 5.5 STP Trials
113 5.51 Testing and trials of the STP in Manual and Auto mode 3 Nos
114 6 Evac Sewage Treatment Plant - Type- ORCA III (INS Aditya and INS Suvarna)
115 6.1 Sedimentation Tank
116 6.11 Chemical cleaning of tank\n(i) Opening of tank cover and checking the H2S level in the tank.\n(ii) Ventilation of the tank\n(iii) Removal of Sewage Water from the tank.\n(iv) Flushing of tank with Sea / fresh water\n(v) Check for any damage to the tank / connecting nozzles\n(vi) Minor cold repair of the tank if any 3 Nos
117 6.12 Internal coating of tank 3 Nos
118 6.13 Cleaning and checking of Minim skimmer 3 Nos
119 6.14 Cleaning and checking of lamella plates 3 MM2
120 6.2 Oxidising Tank
121 6.21 Chemical cleaning of tank\n(i) Opening of tank cover and checking the H2S level in the tank.\n(ii) Ventilation of the tank\n(iii) Removal of Sewage Water from the tank.\n(iv) Flushing of tank with Sea / fresh water\n(v) Check for any damage to the tank / connecting nozzles\n(vi) Minor cold repair of the tank if any 3 Nos
122 6.22 Internal coating of tank 3 Nos
123 6.23 Cleaning and checking of level switch 3 Nos
124 6.24 Replacement of level switch 3 Nos
125 7 Evac Sewage Treatment Plant - Type- ORCA III (INS Aditya and INS Suvarna)
126 7.1 System Valves
127 7.11 Cleaning of ball valves 6 Nos
128 7.12 Replacement of PVC ball valve 6 Nos
129 7.13 Defect rectification of electro-pneumatic valve 6 Nos
130 7.14 Overhauling of electro-pneumatic valve 6 Nos
131 7.15 Replacement of electro-pneumatic valve 7 Nos
132 7.16 Defect rectification of solenoid valve 6 Nos
133 7.17 Overhauling of solenoid valve 6 Nos
134 7.18 Replacement of solenoid valve 6 Nos
135 7.19 Cleaning of SS ball valves 6 Nos
136 7.2 Replacement of SS ball valves 6 Nos
137 7.3 System Components
138 7.31 Cleaning of brushaway filter 6 Nos
139 7.32 Renewal of brushaway filter 6 Nos
140 7.33 Overhauling of brushaway filter 6 Nos
141 7.34 Cleaning of static mixer 6 Nos
142 7.35 Renewal of static mixer 6 Nos
143 7.36 Checking of sacrificial anode 6 Nos
144 7.37 Renewal of sacrificial anode 6 Nos
145 7.38 Cleaning of non return valve 6 Nos
146 7.39 Replacement of non return valve 6 Nos
147 7.4 Cleaning / Renewal of hypochlorite chemical tank 6 Nos
148 7.5 Sea water pump, Recirculation / Discharge Pump, Macerator Pump and Sludge pump
149 7.51 Complete Overhauling of Pump 6 Nos
150 7.52 Complete Overhauling of Motor 6 Nos
151 7.53 Defect rectification of pump 6 Nos
152 7.54 Replacement of pump 6 Nos
153 7.55 Rewinding of Motor 6 Nos
154 7.6 Hypochlorite dosing pump and Floculant dosing pump
155 7.61 Complete Overhauling of Pump 6 Nos
156 7.62 Defect rectification of pump 6 Nos
157 7.63 Replacement of pump 6 Nos
158 7.7 STP Control Panel
159 7.71 Check and clean the electrical components and switches 6 Nos
160 7.72 Repair of control panel 6 Nos
161 7.73 Replacement of PLC 6 Nos
162 7.74 Replacement and Programming of PLC 6 Nos
163 7.75 Overhauling ofcomplete control panel 6 Nos
164 7.8 STP Trials
165 7.81 Testing and trials of the STP in Manual and Auto mode 6 Nos
166 7.9 STP Tests
167 7.91 Effluent Test as per MARPOL 6 Nos
168 8 PART 3 - Sewage Treatment Plant (Yard Craft)\nEvac Sewage Treatment Plant - Type- N40CE (Tug Dhiraj, Himmat and Sahas)
169 8.1 Sewage Tank
170 8.11 Chemical cleaning of tank\n(i) Opening of tank cover and checking the H2S level in the tank.\n(ii) Ventilation of the tank\n(iii) Removal of Sewage Water from the tank.\n(iv) Flushing of tank with Sea / fresh water\n(v) Check for any damage to the tank / connecting nozzles\n(vi) Minor cold repair of the tank if any 9 Nos
171 8.12 Internal coating of tank 9 Nos
172 8.13 Cleaning and checking of Level Switch 9 Nos
173 8.14 Replacement of Level Switch 9 Nos
174 8.2 Effluent Tank
175 8.21 Chemical cleaning of tank\n(i) Opening of tank cover and checking the H2S level in the tank.\n(ii) Ventilation of the tank\n(iii) Removal of Sewage Water from the tank.\n(iv) Flushing of tank with Sea / fresh water\n(v) Check for any damage to the tank / connecting nozzles\n(vi) Minor cold repair of the tank if any 9 Nos
176 8.22 Internal coating of tank 9 Nos
177 8.23 Cleaning and checking of Level Switch 9 Nos
178 8.24 Replacement of Level Switch 9 Nos
179 8.3 System Valves
180 8.31 Cleaning and overhauling of Solenoid valve 9 Nos
181 8.32 Replacement of Solenoid valve 9 Nos
182 8.33 Cleaning and overhauling of motorised Solenoid valve 9 Nos
183 8.34 Replacement of motorised Solenoid valve 9 Nos
184 8.35 Cleaning and overhauling of system ball valve 9 Nos
185 8.36 Replacement of system valve 9 Nos
186 8.4 STP system piping
187 8.41 Chemical cleaning of STP piping (Internal piping within STP) 9 Nos
188 8.5 Electrolysis cell
189 8.51 Opening, Overhauling / Defect rectification of Chlorine generator 9 Nos
190 8.52 Replacement of complete electrolysis cell 9 Nos
191 8.6 Main pump and Discharge pump
192 8.61 Complete Overhauling of Pump 9 Nos
193 8.62 Complete Overhauling of Motor 9 Nos
194 8.63 Defect rectification of pump 9 Nos
195 8.64 Replacement of pump 9 Nos
196 8.65 Rewinding of Motor 9 Nos
197 9 Evac Sewage Treatment Plant - Type- N40CE (Tug Dhiraj, Himmat, Sahas)
198 9.1 STP Control Panel
199 9.11 Check and clean the electrical components and switches 9 Nos
200 9.12 Repair of control panel 9 Nos
201 9.13 Overhauling of complete control panel 9 Nos
202 10 Evac Sewage Treatment Plant - Type- STP 20 (Sullage Barge VI)
203 10.1 Airation Chamber I
204 10.11 Chemical cleaning of tank\n(i) Opening of tank cover and checking the H2S level in the tank.\n(ii) Ventilation of the tank\n(iii) Removal of Sewage Water from the tank.\n(iv) Flushing of tank with Sea / fresh water\n(v) Check for any damage to the tank / connecting nozzles\n(vi) Minor cold repair of the tank if any 9 Nos
205 10.12 Internal coating of Chamber 9 Nos
206 10.2 Airation Chamber II
207 10.21 Chemical cleaning of tank\n(i) Opening of tank cover and checking the H2S level in the tank.\n(ii) Ventilation of the tank\n(iii) Removal of Sewage Water from the tank.\n(iv) Flushing of tank with Sea / fresh water\n(v) Check for any damage to the tank / connecting nozzles\n(vi) Minor cold repair of the tank if any 9 Nos
208 10.22 Internal coating of Chamber 9 Nos
209 10.3 Settling Chamber
210 10.31 Chemical cleaning of tank\n(i) Opening of tank cover and checking the H2S level in the tank.\n(ii) Ventilation of the tank\n(iii) Removal of Sewage Water from the tank.\n(iv) Flushing of tank with Sea / fresh water\n(v) Check for any damage to the tank / connecting nozzles\n(vi) Minor cold repair of the tank if any 9 Nos
211 10.32 Internal coating of Chamber 9 Nos
212 10.4 Disinfection Chamber
213 10.41 Chemical cleaning of tank\n(i) Opening of tank cover and checking the H2S level in the tank.\n(ii) Ventilation of the tank\n(iii) Removal of Sewage Water from the tank.\n(iv) Flushing of tank with Sea / fresh water\n(v) Check for any damage to the tank / connecting nozzles\n(vi) Minor cold repair of the tank if any 9 Nos
214 10.42 Internal coating of Chamber 9 Nos
215 10.43 Cleaning and checking of Level Switch 9 Nos
216 10.44 Replacement of Level Switch 9 Nos
217 11 Evac Sewage Treatment Plant - Type- STP 20 (Sullage Barge VI)
218 11.1 System Valves
219 11.11 Overhauling of Gate Valve - Size DN 65 9 Nos
220 11.12 Renewal of valve spindle / stem - Size DN 65 9 Nos
221 11.13 Renewal of valve seat (Rubber moulded resilient valve seat) - Size DN 65 9 Nos
222 11.14 Overhauling of Gate Valve - Size DN 50 9 Nos
223 11.15 Renewal of valve spindle / stem - Size DN 50 9 Nos
224 11.16 Renewal of valve seat (Rubber moulded resilient valve seat) - Size DN 50 9 Nos
225 11.17 Replacement of valve 9 Nos
226 11.18 Cleaning of non returned valve 9 Nos
227 11.19 Replacement of non returned valve 9 Nos
228 11.2 STP system piping
229 11.21 Chemical cleaning of STP piping (Internal piping within STP) 9 Nos
230 11.3 Discharge pump
231 11.31 Complete Overhauling of Pump 9 Nos
232 11.32 Complete Overhauling of Motor 9 Nos
233 11.33 Defect rectification of pump 9 Nos
234 11.34 Replacement of pump 9 Nos
235 11.35 Rewinding of Motor 9 Nos
236 11.4 Air Blower
237 11.41 Complete Overhauling of Pump 9 Nos
238 11.42 Complete Overhauling of Motor 9 Nos
239 11.43 Defect rectification of pump 9 Nos
240 11.44 Replacement of pump 9 Nos
241 11.45 Rewinding of Motor 9 Nos
242 11.5 Dosing pump
243 11.51 Complete Overhauling of Pump 9 Nos
244 11.52 Defect rectification of pump 9 Nos
245 11.53 Replacement of pump 9 Nos
246 11.6 STP Control Panel
247 11.61 Check and clean the electrical components and switches 9 Nos
248 11.62 Repair of control panel 9 Nos
249 11.63 Overhauling of complete control panel 9 Nos
250 11.7 STP Trials
251 11.71 Testing and trials of the STP in Manual and Auto mode 9 Nos
252 11.8 STP Tests
253 11.81 Effluent Test as per MARPOL 9 Nos
254 12 SPARES FOR EVAC VACUUM TOILET SYSTEM AND SEWAGE TREATMENT PLANTS\nINS Aditya - Vacuum Toilet System
255 12.1 Vacuum Toilets
256 12.11 Hose 3 Nos
257 12.2 Evac SE 044A Pumps and Ejector
258 12.21 Rubber Gasket 3 Nos
259 13 INS Aditya - Sewage Treatment Plant - ORCA III 100
260 13.1 ORCA III STP 100 - 6549028
261 13.11 Cathodic Protection Sacrificial Anode 3 Nos
262 13.12 Air Pressure Regulator 3 Nos
263 13.13 Actuator 3/2,1/8 220 AC 3 Nos
264 13.14 Plug 3 Nos
265 13.15 Nipple 3 Nos
266 13.2 6552393-Macerator Pump, OMCRP 100/4
267 13.21 Countersunk Screw M8 x 30 D IN 7991 -A2 3 Nos
268 13.22 Rotor Disc Retaining Washer 3 Nos
269 13.23 Cyclone 3 Nos
270 13.24 O-ring 185x3 70 NBR 3 Nos
271 13.25 Locking Ring 30 D IN 471 3 Nos
272 13.3 6549080-Sludge Pump, ORSSP 5-2
273 13.31 Kit, Gaskets Complete 3 Nos
274 13.32 Kit, Motor Bearing Complete 3 Nos
275 13.33 Kit, Plug Complete 3 Nos
276 13.34 Kit, Repair Complete 3 Nos
277 13.4 6549083-Recicul/Disch Pump & Seawater Pump
278 13.41 Kit, Plug Complete 3 Nos
279 14 INS Aditya - Sewage Treatment Plant - ORCA III 15
280 14.41 ORCA III STP 100 - 6549024
281 14.42 Cathodic Protection Sacrificial Anode 3 Nos
282 14.43 Air Pressure Regulator 3 Nos
283 14.44 Actuator 3/2,1/8 220 AC 3 Nos
284 14.45 Plug 3 Nos
285 14.46 Nipple 3 Nos
286 14.5 Macerator Pump-6552392, OMCRP 100/6
287 14.51 Countersunk Screw M8 x 30 D IN 7991 -A2 3 Nos
288 14.52 Rotor Disc Retaining Washer 3 Nos
289 14.53 Cyclone 3 Nos
290 14.54 O-ring 185x3 70 NBR 3 Nos
291 14.55 Multiple Knife 3 Nos
292 14.56 Locking Ring 30 D IN 471 3 Nos
293 14.6 6549083-Reciculation/Discharge Pump, Sludge & Seawater Pump
294 14.61 Kit, Gaskets Complete 3 Nos
295 14.62 Kit, Motor Bearing Complete 3 Nos
296 14.63 Kit, Plug Complete 3 Nos
297 14.64 Kit, Repair Complete 3 Nos
298 14.7 INS Makar - Vacuum Toilet System
299 14.71 Pneumatic Push Button 3 Nos
300 14.72 Recommended Spare Part Kit 3 Nos
301 14.73 LOGO 12/24 RC 3 Nos
302 14.74 LOGO DM8 12/24 R 3 Nos
303 15 INS Makar - Sewage Treatment Plant - ORCA II A 165
304 15.1 Transfer Pump
305 15.11 Key 3 Nos
306 15.12 Coupling 3 Nos
307 15.13 Screw, Set 3 Nos
308 15.14 Ring, Snap 3 Nos
309 15.15 Bearing 3 Nos
310 15.16 Ring Slinger 3 Nos
311 15.17 Seal, Mechanical 3 Nos
312 15.18 Gasket, Adapter plate 3 Nos
313 15.19 Rotor 3 Nos
314 15.2 Pin Rotor 3 Nos
315 15.21 Stator 3 Nos
316 15.22 Gasket Reducer 3 Nos
317 15.23 Screw 3 Nos
318 15.24 Tip Cutter 3 Nos
319 15.25 Clamp, Cutter 3 Nos
320 15.26 Screw 3 Nos
321 15.27 Motor, 1HP, 2850RPM, 380V, 3PH, 50HZ 3 Nos
322 15.3 INS Subhadra - Vacuum Toilet System
323 15.31 Screw 3 Nos
324 15.32 O-Ring 3 Nos
325 15.33 Reducer 1 1/4" -50mm With Vacuum Nipple 3 Nos
326 15.4 EVAC Vacuum Toilet 910, Floor Model, Trevi
327 15.41 Membrane 3 Nos
328 15.42 Closing Mechanism 3 Nos
329 15.43 Screw 3 Nos
330 15.5 EVAC Vacuum Toilet 910, Floor Model, Trevi
331 15.51 Membrane 3 Nos
332 15.52 Closing Mechanism 3 Nos
333 16 INS Suvarna - Sewage Treatment Plant - ORCA III 50
334 16.1 ORCA III STP 100 - 6549028
335 16.11 Cathodic Protection Sacrificial Anode 3 Nos
336 16.12 Air Pressure Regulator 3 Nos
337 16.13 Actuator 3/2,1/8 220 AC 3 Nos
338 16.14 Plug 3 Nos
339 16.15 Nipple 3 Nos
340 16.2 6552393-Macerator Pump
341 16.21 Countersunk Screw 3 Nos
342 16.22 Rotor Disc Retaining Washer 3 Nos
343 16.23 Cyclone 3 Nos
344 16.24 O-Ring 3 Nos
345 16.25 Locking Ring 3 Nos
346 16.3 6549083-Sludge Pump Rec/Disc Pump, & Sea water Pump
347 16.31 Kit, Gaskets Complete 3 Nos
348 16.32 Kit, Motor Bearing Complete 3 Nos
349 16.33 Kit, Plug Complete 3 Nos
350 16.34 Kit, Repair Complete 3 Nos
351 16.4 Sullage Barge VI - Biological STP 20
352 16.41 Impeller 3 Nos
353 16.42 Spare Part Kit for Blower 3 Nos
354 16.43 Motor Protection Circuit Breaker 3 Nos
355 16.44 Motor Protection Circuit Breaker 3 Nos
356 16.45 Aux Relay 3 Nos
357 16.46 Aux Relay Base 3 Nos
358 16.47 Contactor 3 Nos
359 17 Tug Himmat, Sahas And Dhiraj
360 17.1 Sewage Treatment Plant - N 25 CE
361 17.11 Ball Valve 8A Screw 9 Nos
362 17.12 Ball Valve 20A Screw 9 Nos
363 17.13 Thermo Sensor Hyundai 9 Nos
364 17.14 Main Pump Bearing 9 Nos
365 17.15 Main Pump Meachanical Seal 9 Nos
366 17.16 Main Pump Impeller 9 Nos
367 17.17 Discharge Pump Bearing 9 Nos
368 17.18 Discharge Pump Mechanical Seal 9 Nos
369 17.19 Discharge Pump Impeller 9 Nos
370 17.2 O-Ring P35 9 Nos
371 17.21 Rubber Gasket 12.7 T 9 Nos
372 17.22 Solenoid Valve 15 A 9 Nos
373 17.23 Solenoid Valve 15 A 9 Nos
374 17.24 Level Sensor A Type 9 Nos
375 17.25 Pressure Gauge 0-1 Kg 9 Nos
376 17.26 Pressure Gauge 1-6 Kg 9 Nos
377 17.27 Diode 1600V, 120A 9 Nos
378 17.28 Fuse 80 A 9 Nos
379 17.29 Circuit Breake BKM 1P 4A 9 Nos
380 17.3 Contactor GMC-9 9 Nos
381 17.31 Contactor GTH-22 (1.3A) 9 Nos
382 17.32 Contactor GMC-18 9 Nos
383 17.33 Contactor GTH-22 (5A) 9 Nos
384 17.34 Relay 4 L with Base 9 Nos
385 17.35 C/H Switch 3 Type 9 Nos
386 17.36 Push Lamp, Dia 25 mm 9 Nos
387 17.37 Pilot Lamp, Dia 25 mm 9 Nos
388 17.38 Pilot Lamp, Dia 25 mm 9 Nos
389 17.39 Buzzer, Dia 25 mm 9 Nos
390 17.4 Ammeter DAM 100A DC 9 Nos
391 17.41 Voltmeter VM 50 V DC 9 Nos
392 17.42 Aux. contact AU4 (4A) 9 Nos
393 17.43 Emergency Button 9 Nos
394 17.44 Check Valve 20A-10K (Flange Type) 9 Nos
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail