}

Annual Periiodical Maintenance For The Year 2020-21 On Bhuntar Garsa Road Km 0-0 To 14-200 Providing And Laying Busg , Bituminous Concrete In Km 4/0 To 7/0 , 8/0 To 9/0 And 12/14/0 And Construction Of Pcc Hill Side Drain In 500 Metre Length And Edge Lin, Garsa-Himachal Pradesh

Public Works Department-PWD has published Annual Periiodical Maintenance For The Year 2020-21 On Bhuntar Garsa Road Km 0-0 To 14-200 Providing And Laying Busg , Bituminous Concrete In Km 4/0 To 7/0 , 8/0 To 9/0 And 12/14/0 And Construction Of Pcc Hill Side Drain In 500 Metre Length And Edge Lin. Submission Date for this Tender is 24-04-2020. Road Work Tenders in Garsa Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

24152230
Annual Periiodical Maintenance For The Year 2020-21 On Bhuntar Garsa Road Km 0-0 To 14-200 Providing And Laying Busg , Bituminous Concrete In Km 4/0 To 7/0 , 8/0 To 9/0 And 12/14/0 And Construction Of Pcc Hill Side Drain In 500 Metre Length And Edge Lin
National Competitive Bid
Indian
Himachal Pradesh
Garsa
24-04-2020

Tender Details

Annual Periiodical Maintenance For The Year 2020-21 On Bhuntar Garsa Road Km 0-0 To 14-200 Providing And Laying Busg , Bituminous Concrete In Km 4/0 To 7/0 , 8/0 To 9/0 And 12/14/0 And Construction Of Pcc Hill Side Drain In 500 Metre Length And Edge Line

Key Value

Document Fees
INR 2000 /-
EMD
INR 109700.0 /-
Tender Value
INR 77.17 Lakhs /-

BOQ Items

Name of Work:- Annual Periodic Maintenance for the year 2020-21 on Bhuntar Garsa road kM 0/00 to 14/200. (SH:- Providing and laying BUSG, Bituminous Concrete in Km. 4/00 to 7/00 ,8/00 to 9/00 and 12/00 to 14/00 , & C/O P.C.C. Hill side drain at various RDs (length = 500 Mtr.) and Edge Line.)
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Providing, laying and rolling of built-up spray grout layer over prepared base consisting of a two layer composite construction of crushed coarse aggregates using motor grader for aggregates. Key stone chips spreader may be used with application of bituminous binder ( VG-10) after each layer and with key aggregates placed on top of the second layer to serve as a base, conforming to the line, grades and cross-section specified, the compacted layer thickness being 75 mm ( Seventy five Millimetre ) as per Technical Specification Clause 505 with bitumen VG-10 includind hauling carriage of all labour and equipments and material to various locations through all modes of transports by Manul mean with in all leads and lifts of material complete as per entire satisfaction & direction of Engineer-in-Charge. 1312.71 Per Square metre
2 2 Providing and Laying tack coat with Bitumen emulsion ( RS-I) using emulsion distributor at the rate 0.25 to 0.30kg(Zero point two five to zero point three zero Kelograme ) per Square metre on the prepared dry and hungry bituminous surface cleaned with hydroulic broom as per techanical specification clause 503. including hauling carriage of all labour and equipments and material to various locations through all modes of transports by mechanical means with in all leads and lifts of material complete as per entire satisfaction & direction of Engineer-in-Charge. 26254.1 Per Square metre
3 3 Providing and laying bituminous concrete 30 mm(Thirty milimetre) thick with 100-120 TPH batch type hot mix plant producing an average output of 75( seventy five) tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG-10 )@ 5.4 to 5.6 ( five point four to five point six) percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects including hauling carriage of all labour and equipments and material to various locations through all modes of transports by mechanical mean with in all leads and lifts of material complete as per entire satisfaction & direction of Engineer-in-Charge. 787.62 Per Cubic metre
4 4 Providing and laying of hot applied thermoplastic compund 2.5 mm (two point five milimetre)thick including reflectorising glass beads @ 250 (two hundred fifty)gms per sqm area, thickness of 2.5 mm (two point five milimetre) is exclusive of surfce applied glass beads as per IRC:35. The finished surfce to be level, uniform and free from streaks and holes. including haulage/carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in-charge. 300 Per Square metre
5 5 Construction of hill side drain with P.C.C.M-10 in accordance with the requirement of specification true to line and grade . Dimension and other particular as per drawing and technical specification clause 1606.1 including hauling carriage of all labour and equipments and material to various locations through all modes of transports by mechanical mean with in all leads and lifts of material complete as per entire satisfaction & direction of Engineer-in-Charge. . 500 Per Running metre
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail