| 1 | 1 | Item No.1 :- Excavation for fundation / pipe trenches in Soft strata such as earth, soil of all types, sand, gravel and soft murum, hard murum and bolders including removing the excavated materials up to a distance of 50 M and lift upto 1.5 M, stacking and spreading as directed, dewatering, showring and struting, preapering the bead for the foundation etc. complete. | BI01010001010000000000000515BI0100001132 | 612 | Cum. |
|---|
| 2 | 2 | Item No 2 :- Excavation for fundation / pipe trenches in soft Hard Strata such as Soft Rock/ Hard rock and old foundation and lime masonary foundation asphalt road by chiseling including removing a excavated materials up to a distance of 50 M with lift up to a 1.5 M stacking as directed dewatering, showring structing, preapering the bead for the foundation and excluding back filling etc. complete. | BI01010001010000000000000515BI0100001134 | 306 | Cum. |
|---|
| 3 | 3 | Item No.3 :- Providing at site of works HDPE / DI pipes as mentioned below as per relevant IS specification including all taxes, freight charges, octroi, loading, unloading, transportation upto the site of work, paying third party (Aproved by MJP) inspection charges, guarding pipes till haydraulic test is given and line is commisioned etc. complete. A) 90mm HDPE Pipes (6Kg/cm) | BI01010001010000000000000515BI0100001135 | 1000 | Rm. |
|---|
| 4 | 4 | B) 75mm HDPE Pipes (6Kg/cm) | | 700 | Rm. |
|---|
| 5 | 5 | Item No.4 :- Providing at site of work PVC / G.I. Specials sutiabale for as mentioned above pipes as per relevant IS specifications including all taxes, freight charges, octroi, loading, unloading, transportation upto the site of work guarding till haydraulic test is given and line is commisioned etc. complete. | BI01010001010000000000000515BI0100001137 | 1 | Lump. |
|---|
| 6 | 6 | Item No.5 :- Lowering, laying and jointing PVC / G.I. /HDPE pipes as mentioned below as per relevant IS specifications including cost of jointing materials (as per relevant specifications) labour, giving satesfactory hydraulic test etc. complete. A) 90mm HDPE Pipes (6Kg/cm) | BI01010001010000000000000515BI0100001142 | 1000 | Rm. |
|---|
| 7 | 7 | B) 75mm HDPE Pipes (6Kg/cm) | | 700 | Rm. |
|---|
| 8 | 8 | Item No.6 :- Providing and fixing as per relevant IS specifications CI / D/F sluce valves, sutaible tipes of pressure relief valves etc. of following Dai. Including all taxes ( central and local ) Transportation upto site of work, unloading, stacking etc. complete. A) Materials - 80mm Sluice Valve | | 2 | No. |
|---|
| 9 | 9 | B) Labour - 80mm Sluice Valve | | 2 | No. |
|---|
| 10 | 10 | Item No.7 :- Providing and constructing of chamber of clear inside size 0.60 x 0.45 M in B.B. masonry 2 nd sort in C.M. 1:6, 225 mm thick wall with 12 mm thick cement plaster 1:3 from inside and cm 1:2 poiting from outside, M:100 beading 15 mm thick including excavation in soft/ hard strata etc. fixing CI MH frame and cover in coping etc, curing, PCC, cost of frame and cover etc. complete. | | 2 | No. |
|---|
| 11 | 11 | Item No.8 :- Reffilling the excavated trenches with aproved excavated materials from foundation 15 cm to 20 cm layers including all leads and lift etc. complete. | BI01010001010000000000000515BI0100001148 | 907.2 | Cum. |
|---|