National Aluminium Company Limited-NALCO has published Annual Major Mechanical Maintenance And Overhauling Of Wtp Equipments . . Submission Date for this Tender is 13-04-2020. Tanks and Cylinders Tenders in CPP, NALCO, ANGUL Odisha. Bidders can get complete Tender details and download the document.
Name of Work: ANNUAL MAJOR MECHANICAL MAINTENANCE AND OVERHAULING OF WTP EQUIPMENTS. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Maint. & O/H of Clarifier lift pumps., as per scope of work. | 1 | NO | |
2 | 2 | O/H of Cooling tower make up pumps., as per scope of work. | 1 | NO | |
3 | 3 | O/H of Service water pumps., as per scope of work. | 1 | NO | |
4 | 4 | O/H of Filter supply pumps., as per scope of work. | 1 | NO | |
5 | 5 | O/H of Smelter supply pumps., as per scope of work. | 1 | NO | |
6 | 6 | O/H of D.M.Plant supply pumps., as per scope of work. | 1 | NO | |
7 | 7 | O/H of Drinking water pumps., as per scope of work. | 1 | NO | |
8 | 8 | O/H of Sludge disposal pumps., as per scope of work. | 1 | NO | |
9 | 9 | O/H of Ind. recycle pumps., as per scope of work. | 1 | NO | |
10 | 10 | O/H of Sludge disposal pumps.(NPIT&IDWRI, as per scope of work. | 1 | NO | |
11 | 11 | O/H of Horizontal centrifugal pumps, as per scope of work. | 1 | NO | |
12 | 12 | O/H of Horzontal pumps (STP), as per scope of work. | 1 | NO | |
13 | 13 | O/H of metering pumps(CH.H/REG.ROOM), as per scope of work. | 1 | NO | |
14 | 14 | O/H of metering pumps(NPTP/IDWRS), as per scope of work. | 1 | NO | |
15 | 15 | O/H of Flash mixer stirrers, as per scope of work. | 1 | NO | |
16 | 16 | O/H of Alum/Sod. Carbonate/Brine, as per scope of work. | 1 | NO | |
17 | 17 | O/H of Gravity filter blower, as per scope of work. | 1 | NO | |
18 | 18 | O/H of Degasser air blower, as per scope of work. | 1 | NO | |
19 | 19 | O/H of Mixed bed blower, as per scope of work. | 1 | NO | |
20 | 20 | O/H of TC-50 Compressor, as per scope of work. | 1 | NO | |
21 | 21 | Clarifloculator wheel repair, as per scope of work. | 1 | NO | |
22 | 22 | Repair/repl of paddle GB/driving GB, as per scope of work. | 1 | NO | |
23 | 23 | Replacement of pully/V-belts, as per scope of work. | 1 | NO | |
24 | 24 | Repair/repl of paddle shaft/plumber bloc, as per scope of work. | 1 | NO | |
25 | 25 | Alignment of bridge, as per scope of work. | 1 | NO | |
26 | 26 | Rail alignment, as per scope of work. | 1 | Meter | |
27 | 27 | Rail replacment, as per scope of work. | 1 | Meter | |
28 | 28 | Driving/carriage wheel replacement, as per scope of work. | 1 | NO | |
29 | 29 | Guide wheel repair/replacement, as per scope of work. | 1 | NO | |
30 | 30 | Repair/replacement of main drive gear, as per scope of work. | 1 | NO | |
31 | 31 | Fabrication of rail foundation box, as per scope of work. | 1 | NO | |
32 | 32 | Positioning & alignment of rail foundati, as per scope of work. | 1 | NO | |
33 | 33 | Top resin strainer repair/replacement, as per scope of work. | 1 | NO | |
34 | 34 | Side resin strainer repair/replacement., as per scope of work. | 1 | NO | |
35 | 35 | Man hole cover opening/Box up., as per scope of work. | 1 | NO | |
36 | 36 | Resin trap repair/replacement, as per scope of work. | 1 | NO | |
37 | 37 | Orifice plate removal &refixing., as per scope of work. | 1 | NO | |
38 | 38 | Rep. & O/H of 900MM butterfly valve, as per scope of work. | 1 | NO | |
39 | 39 | Rep. & O/H of 700MM butterfly valve, as per scope of work. | 1 | NO | |
40 | 40 | Rep. & O/H of 600MM butterfly valve, as per scope of work. | 1 | NO | |
41 | 41 | Rep. & O/H of 500MM butterfly valve, as per scope of work. | 1 | NO | |
42 | 42 | Rep. & O/H of 350MM butterfly valve, as per scope of work. | 1 | NO | |
43 | 43 | Rep. & O/H of 300/250MM butterfly valve, as per scope of work. | 1 | NO | |
44 | 44 | Rep. & O/H of 200/150MM butterfly valve, as per scope of work. | 1 | NO | |
45 | 45 | O/H of 750/600MM gate valve, as per scope of work. | 1 | NO | |
46 | 46 | O/H of 350/300/250MM gate valve, as per scope of work. | 1 | NO | |
47 | 47 | O/H of 200/150MM gate valve, as per scope of work. | 1 | NO | |
48 | 48 | Replacement of gate valve of all sizes., as per scope of work. | 1 | NO | |
49 | 49 | O/H of sluice gates 750MM & 1050MM, as per scope of work. | 1 | NO | |
50 | 50 | O/H of sluice gates 1200MM & 1500MM, as per scope of work. | 1 | NO | |
51 | 51 | O/H of sluice gates 1400MM (ZERO DISH.GA, as per scope of work. | 1 | NO | |
52 | 52 | Repl. of 25/40/50/80MM diaphragm/saunder, as per scope of work. | 1 | NO | |
53 | 53 | Repl. of 100/150MM diaphragm/saunders va, as per scope of work. | 1 | NO | |
54 | 54 | Repl. Of 200/250MM diaphragm/saunders va, as per scope of work. | 1 | NO | |
55 | 55 | O/H of 25/40/50/80MM diaphragm/saunders, as per scope of work. | 1 | NO | |
56 | 56 | O/H of 100/150MM diaphragm/saunders valv, as per scope of work. | 1 | NO | |
57 | 57 | O/H of 200/250MM diaphragm/saunders valv, as per scope of work. | 1 | NO | |
58 | 58 | Repair/Repl. of ARV (size 25/50/80MM), as per scope of work. | 1 | NO | |
59 | 59 | Repair/Repl. of ARV(size 100/15/200), as per scope of work. | 1 | NO | |
60 | 60 | Repair/Repl.of Foot valves at N-pit, as per scope of work. | 1 | NO | |
61 | 61 | Repair/Replacement of Foot valves at STP, as per scope of work. | 1 | NO | |
62 | 62 | Dismantling of MSRL/MS pipes 200NB, as per scope of work. | 1 | Meter | |
63 | 63 | Erection of MSRL/MS pipes 200NB, as per scope of work. | 1 | Meter | |
64 | 64 | Dismantling of SS pipes 200NB, as per scope of work. | 1 | Meter | |
65 | 65 | Erection of SS pipes 200NB, as per scope of work. | 1 | Meter | |
66 | 66 | Erection of Moving equipments., as per scope of work. | 1 | Meter | |
67 | 67 | Erection of Static equipments., as per scope of work. | 1 | Meter | |
68 | 68 | Dismantling of Moving equipments., as per scope of work. | 1 | Meter | |
69 | 69 | Dismantling of Static equipments., as per scope of work. | 1 | Meter | |
70 | 70 | Mild steel welding, as per scope of work. | 1 | Meter | |
71 | 71 | SS welding, as per scope of work. | 1 | Meter | |
72 | 72 | MS / SS cutting, as per scope of work. | 1 | Meter | |
73 | 73 | Erection of scafolding, as per scope of work. | 1 | Meter | |
74 | 74 | O/H of Crane at IPH, as per scope of work. | 1 | NO | |
75 | 75 | O/H of Crane at C.L.P.H., as per scope of work. | 1 | NO | |
76 | 76 | O/H of Crane at CWPH, as per scope of work. | 1 | NO | |
77 | 77 | O/H of Crane at FPH, as per scope of work. | 1 | NO | |
78 | 78 | O/H of Crane at pre/post chlo.room/IDWRS, as per scope of work. | 1 | NO | |
79 | 79 | O/H of Alum lifting hoist, as per scope of work. | 1 | NO | |
80 | 80 | O/H of Hoist at Sludge PH/D.M.Plant/ F/F, as per scope of work. | 1 | NO | |
81 | 81 | O/H of chain pully block ( 5T-15T), as per scope of work. | 1 | NO | |
82 | 82 | O/H of chain pully block above 15T, as per scope of work. | 1 | NO | |
83 | 83 | O/H of chain pully block up to 5T, as per scope of work. | 1 | NO | |
84 | 84 | Attending gland lkg. of Vert. & Hor.p/p, as per scope of work. | 1 | NO | |
85 | 85 | Chlorine Cylinder conn./ disconnection, as per scope of work. | 1 | NO | |
86 | 86 | Repl.of chlo.cylinder flexible connector, as per scope of work. | 1 | NO | |
87 | 87 | Asst. in PM of all Vertical pumps, as per scope of work. | 1 | NO | |
88 | 88 | Asst. in PM of all Horizontal pumps, as per scope of work. | 1 | NO | |
89 | 89 | Asst. in PM of all Metering pumps, as per scope of work. | 1 | NO | |
90 | 90 | Asst. in PM of allCompressors & blowers | 1 | NO | |
91 | 91 | Asst. in PM of all Stirrers, as per scope of work. | 1 | NO | |
92 | 92 | Asst. in PM of Clarifloculator., as per scope of work. | 1 | NO | |
93 | 93 | Asst. in Oil seal repl. of GB of stirrer, as per scope of work. | 1 | NO | |
94 | 94 | Asst. in Repl. of view glasses, as per scope of work. | 1 | NO | |
95 | 95 | Asst. in Repair/Repl. of level indicator, as per scope of work. | 1 | NO | |
96 | 96 | Asst. for thickness measurement., as per scope of work. | 1 | NO | |
97 | 97 | Asst.for pipeline lkg. outside plant, as per scope of work. | 1 | NO | |
98 | 98 | Asst. for mat. Handling from stores, as per scope of work. | 1 | NO | |
99 | 99 | Pipeline Support, as per scope of work. | 1 | NO | |
100 | 100 | O/H of rain water harvesting p/p, as per scope of work. | 1 | NO | |
101 | 101 | Maint/O/H of exit pit pump, as per scope of work. | 1 | NO | |
102 | 102 | Ere/Fab of 100 mm MS pipe, as per scope of work. | 1 | NO | |
103 | 103 | Ere/Fab of 150 mm MS pipe, as per scope of work. | 1 | NO | |
104 | 104 | Ere/Fab 200 mm MS pipe, as per scope of work. | 1 | NO | |
105 | 105 | Ere/Fab 250 mm MS pipe, as per scope of work. | 1 | NO | |
106 | 106 | Ere/Fab 300 mm MS pipe, as per scope of work. | 1 | NO | |
107 | 107 | Ere/Fab 500 mm MS pipe, as per scope of work. | 1 | NO | |
108 | 108 | Ere/Fab 600 mm MS pipe, as per scope of work. | 1 | NO | |
109 | 109 | Supply of Hydra, as per scope of work. | 1 | Hour |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy