Annual Major Mechanical Maintenance And Overhauling Of Wtp Equipments .
Tender Overview
Project Description
Annual Major Mechanical Maintenance And Overhauling Of Wtp Equipments . , Maint . & O/H Of Clarifier Lift Pumps . , As Per Scope Of Work . , O/H Of Cooling Tower Make Up Pumps . , As Per Scope Of Work . , O/H Of Service Water Pumps . , As Per Scope Of Work . , O/H Of Filter Supply Pumps . , As Per Scope Of Work . , O/H Of Smelter Supply Pumps . , As Per Scope Of Work . , O/H Of D . M . Plant Supply Pumps . , As Per Scope Of Work . , O/H Of Drinking Water Pumps . , As Per Scope Of Work . , O/H Of Sludge Disposal Pumps . , As Per Scope Of Work . , O/H Of Ind . Recycle Pumps . , As Per Scope Of Work . , O/H Of Sludge Disposal Pumps . ( Npit&Idwri , As Per Scope Of Work . , O/H Of Horizontal Centrifugal Pumps , As Per Scope Of Work . , O/H Of Horzontal Pumps ( Stp ) , As Per Scope Of Work . , O/H Of Metering Pumps ( Ch . H/Reg . Room ) , As Per Scope Of Work . , O/H Of Metering Pumps ( Nptp/Idwrs ) , As Per Scope Of Work . , O/H Of Flash Mixer Stirrers , As Per Scope Of Work . , O/H Of Alum/Sod . Carbonate/Brine , As Per Scope Of Work . , O/H Of Gravity Filter Blower , As Per Scope Of Work . , O/H Of Degasser Air Blower , As Per Scope Of Work . , O/H Of Mixed Bed Blower , As Per Scope Of Work . , O/H Of Tc-50 Compressor , As Per Scope Of Work . , Clarifloculator Wheel Repair , As Per Scope Of Work . , Repair/Repl Of Paddle Gb/Driving Gb , As Per Scope Of Work . , Replacement Of Pully/V-Belts , As Per Scope Of Work . , Repair/Repl Of Paddle Shaft/Plumber Bloc , As Per Scope Of Work . , Alignment Of Bridge , As Per Scope Of Work . , Rail Alignment , As Per Scope Of Work . , Rail Replacment , As Per Scope Of Work . , Driving/Carriage Wheel Replacement , As Per Scope Of Work . , Guide Wheel Repair/Replacement , As Per Scope Of Work . , Repair/Replacement Of Main Drive Gear , As Per Scope Of Work . , Fabrication Of Rail Foundation Box , As Per Scope Of Work . , Positioning & Alignment Of Rail Foundati , As Per Scope Of Work . , Top Resin Strainer Repair/Replacement , As Per Scope Of Work . , Side Resin Strainer Repair/Replacement . , As Per Scope Of Work . , Man Hole Cover Opening/Box Up . , As Per Scope Of Work . , Resin Trap Repair/Replacement , As Per Scope Of Work . , Orifice Plate Removal &Refixing . , As Per Scope Of Work . , Rep . & O/H Of 900Mm Butterfly Valve , As Per Scope Of Work . , Rep . & O/H Of 700Mm Butterfly Valve , As Per Scope Of Work . , Rep . & O/H Of 600Mm Butterfly Valve , As Per Scope Of Work . , Rep . & O/H Of 500Mm Butterfly Valve , As Per Scope Of Work . , Rep . & O/H Of 350Mm Butterfly Valve , As Per Scope Of Work . , Rep . & O/H Of 300/250Mm Butterfly Valve , As Per Scope Of Work . , Rep . & O/H Of 200/150Mm Butterfly Valve , As Per Scope Of Work . , O/H Of 750/600Mm Gate Valve , As Per Scope Of Work . , O/H Of 350/300/250Mm Gate Valve , As Per Scope Of Work . , O/H Of 200/150Mm Gate Valve , As Per Scope Of Work . , Replacement Of Gate Valve Of All Sizes . , As Per Scope Of Work . , O/H Of Sluice Gates 750Mm & 1050Mm , As Per Scope Of Work . , O/H Of Sluice Gates 1200Mm & 1500Mm , As Per Scope Of Work . , O/H Of Sluice Gates 1400Mm ( Zero Dish . Ga , As Per Scope Of Work . , Repl . Of 25/40/50/80Mm Diaphragm/Saunder , As Per Scope Of Work . , Repl . Of 100/150Mm Diaphragm/Saunders Va , As Per Scope Of Work . , Repl . Of 200/250Mm Diaphragm/Saunders Va , As Per Scope Of Work . , O/H Of 25/40/50/80Mm Diaphragm/Saunders , As Per Scope Of Work . , O/H Of 100/150Mm Diaphragm/Saunders Valv , As Per Scope Of Work . , O/H Of 200/250Mm Diaphragm/Saunders Valv , As Per Scope Of Work . , Repair/Repl . Of Arv ( Size 25/50/80Mm ) , As Per Scope Of Work . , Repair/Repl . Of Arv ( Size 100/15/200 ) , As Per Scope Of Work . , Repair/Repl . Of Foot Valves At N-Pit , As Per Scope Of Work . , Repair/Replacement Of Foot Valves At Stp , As Per Scope Of Work . , Dismantling Of Msrl/Ms Pipes 200Nb , As Per Scope Of Work . , Erection Of Msrl/Ms Pipes 200Nb , As Per Scope Of Work . , Dismantling Of Ss Pipes 200Nb , As Per Scope Of Work . , Erection Of Ss Pipes 200Nb , As Per Scope Of Work . , Erection Of Moving Equipments . , As Per Scope Of Work . , Erection Of Static Equipments . , As Per Scope Of Work . , Dismantling Of Moving Equipments . , As Per Scope Of Work . , Dismantling Of Static Equipments . , As Per Scope Of Work . , Mild Steel Welding , As Per Scope Of Work . , Ss Welding , As Per Scope Of Work . , Ms / Ss Cutting , As Per Scope Of Work . , Erection Of Scafolding , As Per Scope Of Work . , O/H Of Crane At Iph , As Per Scope Of Work . , O/H Of Crane At C . L . P . H . , As Per Scope Of Work . , O/H Of Crane At Cwph , As Per Scope Of Work . , O/H Of Crane At Fph , As Per Scope Of Work . , O/H Of Crane At Pre/Post Chlo . Room/Idwrs , As Per Scope Of Work . , O/H Of Alum Lifting Hoist , As Per Scope Of Work . , O/H Of Hoist At Sludge Ph/D . M . Plant/ F/F , As Per Scope Of Work . , O/H Of Chain Pully Block ( 5T-15T ) , As Per Scope Of Work . , O/H Of Chain Pully Block Above 15T , As Per Scope Of Work . , O/H Of Chain Pully Block Up To 5T , As Per Scope Of Work . , Attending Gland Lkg . Of Vert . & Hor . P/P , As Per Scope Of Work . , Chlorine Cylinder Conn . / Disconnection , As Per Scope Of Work . , Repl . Of Chlo . Cylinder Flexible Connector , As Per Scope Of Work . , Asst . In Pm Of All Vertical Pumps , As Per Scope Of Work . , Asst . In Pm Of All Horizontal Pumps , As Per Scope Of Work . , Asst . In Pm Of All Metering Pumps , As Per Scope Of Work . , Asst . In Pm Of Allcompressors & Blowers , Asst . In Pm Of All Stirrers , As Per Scope Of Work . , Asst . In Pm Of Clarifloculator . , As Per Scope Of Work . , Asst . In Oil Seal Repl . Of Gb Of Stirrer , As Per Scope Of Work . , Asst . In Repl . Of View Glasses , As Per Scope Of Work . , Asst . In Repair/Repl . Of Level Indicator , As Per Scope Of Work . , Asst . For Thickness Measurement . , As Per Scope Of Work . , Asst . For Pipeline Lkg . Outside Plant , As Per Scope Of Work . , Asst . For Mat . Handling From Stores , As Per Scope Of Work . , Pipeline Support , As Per Scope Of Work . , O/H Of Rain Water Harvesting P/P , As Per Scope Of Work . , Maint/O/H Of Exit Pit Pump , As Per Scope Of Work . , Ere/Fab Of 100 Mm Ms Pipe , As Per Scope Of Work . , Ere/Fab Of 150 Mm Ms Pipe , As Per Scope Of Work . , Ere/Fab 200 Mm Ms Pipe , As Per Scope Of Work . , Ere/Fab 250 Mm Ms Pipe , As Per Scope Of Work . , Ere/Fab 300 Mm Ms Pipe , As Per Scope Of Work . , Ere/Fab 500 Mm Ms Pipe , As Per Scope Of Work . , Ere/Fab 600 Mm Ms Pipe , As Per Scope Of Work . , Supply Of Hydra , As Per Scope Of Work .
BOQ
| Name of Work: ANNUAL MAJOR MECHANICAL MAINTENANCE AND OVERHAULING OF WTP EQUIPMENTS. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Maint. & O/H of Clarifier lift pumps., as per scope of work. | 1 | NO | |
| 2 | 2 | O/H of Cooling tower make up pumps., as per scope of work. | 1 | NO | |
| 3 | 3 | O/H of Service water pumps., as per scope of work. | 1 | NO | |
| 4 | 4 | O/H of Filter supply pumps., as per scope of work. | 1 | NO | |
| 5 | 5 | O/H of Smelter supply pumps., as per scope of work. | 1 | NO | |
| 6 | 6 | O/H of D.M.Plant supply pumps., as per scope of work. | 1 | NO | |
| 7 | 7 | O/H of Drinking water pumps., as per scope of work. | 1 | NO | |
| 8 | 8 | O/H of Sludge disposal pumps., as per scope of work. | 1 | NO | |
| 9 | 9 | O/H of Ind. recycle pumps., as per scope of work. | 1 | NO | |
| 10 | 10 | O/H of Sludge disposal pumps.(NPIT&IDWRI, as per scope of work. | 1 | NO | |
| 11 | 11 | O/H of Horizontal centrifugal pumps, as per scope of work. | 1 | NO | |
| 12 | 12 | O/H of Horzontal pumps (STP), as per scope of work. | 1 | NO | |
| 13 | 13 | O/H of metering pumps(CH.H/REG.ROOM), as per scope of work. | 1 | NO | |
| 14 | 14 | O/H of metering pumps(NPTP/IDWRS), as per scope of work. | 1 | NO | |
| 15 | 15 | O/H of Flash mixer stirrers, as per scope of work. | 1 | NO | |
| 16 | 16 | O/H of Alum/Sod. Carbonate/Brine, as per scope of work. | 1 | NO | |
| 17 | 17 | O/H of Gravity filter blower, as per scope of work. | 1 | NO | |
| 18 | 18 | O/H of Degasser air blower, as per scope of work. | 1 | NO | |
| 19 | 19 | O/H of Mixed bed blower, as per scope of work. | 1 | NO | |
| 20 | 20 | O/H of TC-50 Compressor, as per scope of work. | 1 | NO | |
| 21 | 21 | Clarifloculator wheel repair, as per scope of work. | 1 | NO | |
| 22 | 22 | Repair/repl of paddle GB/driving GB, as per scope of work. | 1 | NO | |
| 23 | 23 | Replacement of pully/V-belts, as per scope of work. | 1 | NO | |
| 24 | 24 | Repair/repl of paddle shaft/plumber bloc, as per scope of work. | 1 | NO | |
| 25 | 25 | Alignment of bridge, as per scope of work. | 1 | NO | |
| 26 | 26 | Rail alignment, as per scope of work. | 1 | Meter | |
| 27 | 27 | Rail replacment, as per scope of work. | 1 | Meter | |
| 28 | 28 | Driving/carriage wheel replacement, as per scope of work. | 1 | NO | |
| 29 | 29 | Guide wheel repair/replacement, as per scope of work. | 1 | NO | |
| 30 | 30 | Repair/replacement of main drive gear, as per scope of work. | 1 | NO | |
| 31 | 31 | Fabrication of rail foundation box, as per scope of work. | 1 | NO | |
| 32 | 32 | Positioning & alignment of rail foundati, as per scope of work. | 1 | NO | |
| 33 | 33 | Top resin strainer repair/replacement, as per scope of work. | 1 | NO | |
| 34 | 34 | Side resin strainer repair/replacement., as per scope of work. | 1 | NO | |
| 35 | 35 | Man hole cover opening/Box up., as per scope of work. | 1 | NO | |
| 36 | 36 | Resin trap repair/replacement, as per scope of work. | 1 | NO | |
| 37 | 37 | Orifice plate removal &refixing., as per scope of work. | 1 | NO | |
| 38 | 38 | Rep. & O/H of 900MM butterfly valve, as per scope of work. | 1 | NO | |
| 39 | 39 | Rep. & O/H of 700MM butterfly valve, as per scope of work. | 1 | NO | |
| 40 | 40 | Rep. & O/H of 600MM butterfly valve, as per scope of work. | 1 | NO | |
| 41 | 41 | Rep. & O/H of 500MM butterfly valve, as per scope of work. | 1 | NO | |
| 42 | 42 | Rep. & O/H of 350MM butterfly valve, as per scope of work. | 1 | NO | |
| 43 | 43 | Rep. & O/H of 300/250MM butterfly valve, as per scope of work. | 1 | NO | |
| 44 | 44 | Rep. & O/H of 200/150MM butterfly valve, as per scope of work. | 1 | NO | |
| 45 | 45 | O/H of 750/600MM gate valve, as per scope of work. | 1 | NO | |
| 46 | 46 | O/H of 350/300/250MM gate valve, as per scope of work. | 1 | NO | |
| 47 | 47 | O/H of 200/150MM gate valve, as per scope of work. | 1 | NO | |
| 48 | 48 | Replacement of gate valve of all sizes., as per scope of work. | 1 | NO | |
| 49 | 49 | O/H of sluice gates 750MM & 1050MM, as per scope of work. | 1 | NO | |
| 50 | 50 | O/H of sluice gates 1200MM & 1500MM, as per scope of work. | 1 | NO | |
| 51 | 51 | O/H of sluice gates 1400MM (ZERO DISH.GA, as per scope of work. | 1 | NO | |
| 52 | 52 | Repl. of 25/40/50/80MM diaphragm/saunder, as per scope of work. | 1 | NO | |
| 53 | 53 | Repl. of 100/150MM diaphragm/saunders va, as per scope of work. | 1 | NO | |
| 54 | 54 | Repl. Of 200/250MM diaphragm/saunders va, as per scope of work. | 1 | NO | |
| 55 | 55 | O/H of 25/40/50/80MM diaphragm/saunders, as per scope of work. | 1 | NO | |
| 56 | 56 | O/H of 100/150MM diaphragm/saunders valv, as per scope of work. | 1 | NO | |
| 57 | 57 | O/H of 200/250MM diaphragm/saunders valv, as per scope of work. | 1 | NO | |
| 58 | 58 | Repair/Repl. of ARV (size 25/50/80MM), as per scope of work. | 1 | NO | |
| 59 | 59 | Repair/Repl. of ARV(size 100/15/200), as per scope of work. | 1 | NO | |
| 60 | 60 | Repair/Repl.of Foot valves at N-pit, as per scope of work. | 1 | NO | |
| 61 | 61 | Repair/Replacement of Foot valves at STP, as per scope of work. | 1 | NO | |
| 62 | 62 | Dismantling of MSRL/MS pipes 200NB, as per scope of work. | 1 | Meter | |
| 63 | 63 | Erection of MSRL/MS pipes 200NB, as per scope of work. | 1 | Meter | |
| 64 | 64 | Dismantling of SS pipes 200NB, as per scope of work. | 1 | Meter | |
| 65 | 65 | Erection of SS pipes 200NB, as per scope of work. | 1 | Meter | |
| 66 | 66 | Erection of Moving equipments., as per scope of work. | 1 | Meter | |
| 67 | 67 | Erection of Static equipments., as per scope of work. | 1 | Meter | |
| 68 | 68 | Dismantling of Moving equipments., as per scope of work. | 1 | Meter | |
| 69 | 69 | Dismantling of Static equipments., as per scope of work. | 1 | Meter | |
| 70 | 70 | Mild steel welding, as per scope of work. | 1 | Meter | |
| 71 | 71 | SS welding, as per scope of work. | 1 | Meter | |
| 72 | 72 | MS / SS cutting, as per scope of work. | 1 | Meter | |
| 73 | 73 | Erection of scafolding, as per scope of work. | 1 | Meter | |
| 74 | 74 | O/H of Crane at IPH, as per scope of work. | 1 | NO | |
| 75 | 75 | O/H of Crane at C.L.P.H., as per scope of work. | 1 | NO | |
| 76 | 76 | O/H of Crane at CWPH, as per scope of work. | 1 | NO | |
| 77 | 77 | O/H of Crane at FPH, as per scope of work. | 1 | NO | |
| 78 | 78 | O/H of Crane at pre/post chlo.room/IDWRS, as per scope of work. | 1 | NO | |
| 79 | 79 | O/H of Alum lifting hoist, as per scope of work. | 1 | NO | |
| 80 | 80 | O/H of Hoist at Sludge PH/D.M.Plant/ F/F, as per scope of work. | 1 | NO | |
| 81 | 81 | O/H of chain pully block ( 5T-15T), as per scope of work. | 1 | NO | |
| 82 | 82 | O/H of chain pully block above 15T, as per scope of work. | 1 | NO | |
| 83 | 83 | O/H of chain pully block up to 5T, as per scope of work. | 1 | NO | |
| 84 | 84 | Attending gland lkg. of Vert. & Hor.p/p, as per scope of work. | 1 | NO | |
| 85 | 85 | Chlorine Cylinder conn./ disconnection, as per scope of work. | 1 | NO | |
| 86 | 86 | Repl.of chlo.cylinder flexible connector, as per scope of work. | 1 | NO | |
| 87 | 87 | Asst. in PM of all Vertical pumps, as per scope of work. | 1 | NO | |
| 88 | 88 | Asst. in PM of all Horizontal pumps, as per scope of work. | 1 | NO | |
| 89 | 89 | Asst. in PM of all Metering pumps, as per scope of work. | 1 | NO | |
| 90 | 90 | Asst. in PM of allCompressors & blowers | 1 | NO | |
| 91 | 91 | Asst. in PM of all Stirrers, as per scope of work. | 1 | NO | |
| 92 | 92 | Asst. in PM of Clarifloculator., as per scope of work. | 1 | NO | |
| 93 | 93 | Asst. in Oil seal repl. of GB of stirrer, as per scope of work. | 1 | NO | |
| 94 | 94 | Asst. in Repl. of view glasses, as per scope of work. | 1 | NO | |
| 95 | 95 | Asst. in Repair/Repl. of level indicator, as per scope of work. | 1 | NO | |
| 96 | 96 | Asst. for thickness measurement., as per scope of work. | 1 | NO | |
| 97 | 97 | Asst.for pipeline lkg. outside plant, as per scope of work. | 1 | NO | |
| 98 | 98 | Asst. for mat. Handling from stores, as per scope of work. | 1 | NO | |
| 99 | 99 | Pipeline Support, as per scope of work. | 1 | NO | |
| 100 | 100 | O/H of rain water harvesting p/p, as per scope of work. | 1 | NO | |
| 101 | 101 | Maint/O/H of exit pit pump, as per scope of work. | 1 | NO | |
| 102 | 102 | Ere/Fab of 100 mm MS pipe, as per scope of work. | 1 | NO | |
| 103 | 103 | Ere/Fab of 150 mm MS pipe, as per scope of work. | 1 | NO | |
| 104 | 104 | Ere/Fab 200 mm MS pipe, as per scope of work. | 1 | NO | |
| 105 | 105 | Ere/Fab 250 mm MS pipe, as per scope of work. | 1 | NO | |
| 106 | 106 | Ere/Fab 300 mm MS pipe, as per scope of work. | 1 | NO | |
| 107 | 107 | Ere/Fab 500 mm MS pipe, as per scope of work. | 1 | NO | |
| 108 | 108 | Ere/Fab 600 mm MS pipe, as per scope of work. | 1 | NO | |
| 109 | 109 | Supply of Hydra, as per scope of work. | 1 | Hour |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed