Defence Statutory Bodies & Commissions/Committees Closing in 0 days TDR #24114484

Comprehensive Maintenance And Repairing Of Industrial Laundry Station Laundry Hospital Laundry Equipments And Ro Plant Under Age E/M Maint At Ina Ezhimala Plant At Ina Ezhimala As Per Boq And Tender Documents

Issued by Statutory Bodies & Commissions/Committees · GE(MAINT)EZHIMALA, Kerala
Tender Value
28.75 Lakhs
Estimated cost
Bid Submission
06 Apr 2020
0 days left
EMD
57500
Bank guarantee accepted
Document Fee
50
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
GE(MAINT)EZHIMALA → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Comprehensive Maintenance And Repairing Of Industrial Laundry Station Laundry Hospital Laundry Equipments And Ro Plant Under Age E/M Maint At Ina Ezhimala Plant At Ina Ezhimala As Per Boq And Tender Documents , Comprehensive Maintenance To Hospital Laundry And Station Laundry Equipments , M&L For Comprehensive Maintenance Including Routine , Preventive And Breakdown Maintenance , Repairs And Servicing Of Following Equipments For Smooth Functioning Including Cleaning , Oiling , Greasing Checking Of Complete System For Trouble Free Functionability , Replacing Worn Out Nuts , Bolts , V-Belts Etc As Required All As Specified And Directed By Engineer -In -Charge ( A ) Washer Extractor Rvw30 -2Nos ( B ) Washer Extractor Rvw45- 4Nos ( C ) Tumble Dryer Rtd 30- 2 Nos ( D ) Tumble Dryer Rtd 60- 4 Nos ( E ) Calendaring Machine Rfwi 2000X400- 1 No . ( F ) Calendaring Machine Rfwi 1600X400-1 No . ( G ) Vacuum Ironing Table Rv 130X 80- 2 Nos . ( H ) Electrical Boiler Mr 12 - 4 Nos . ( I ) Electrical Boiler Mr 18 - 2 Nos . ( J ) Utility Press Std - 2 Nos . ( K ) Stain Removing Machine Cl 7 - 1No . ( L ) Compressor Std - 2 Nos . , Notes For Item No . 1 . 01:-1 . All Labour , Consumables And Replacement Of Minor Parts Shall Be Deemed To Be Included Under The Unit Rate Quoted2 . Major Spare Parts Catered Under Item No . 1 . 04 To 1 . 44 Will Be Measured And Paid Separately Under Relevant Item3 . Attending Breakdown Call & Necessary Servicing Shall Be Deemed To Be Included Under The Unit Rate Quoted For Above Item . 4 . In Case Of Any Delay In Attending The Defects By The Contractor , Necessary Penal Recovery Will Be Affected As Stipulated In The Particular Specifications . 5 . Comprehensive Maintenance Of Hospital Laundry & Station Laundry Under Sl Item No 1 Of Schedule A Is To Be Started On Or After 08 July 2020 Only , Supply And Replace Following Spare Parts Required For Laundry Equipments:- , Control Module For Washer Extractor , Limit Switch For Washer Extractor , Heavy Duty Door Latch For Washer Extractor , Finned Heater For Tumble Dryer , Contactor 50A For Washer Extractor , Big Hooter Tumble Dryer , Bearing Ucfl 205 For Tumble Dryer , Ss Flexible Hose For Tumble Dryer , Spring Rtd 30 For Tumble Dryer , Hydro Crone Bush For Washer Extractor , Bridge Rectifier Calendaring Machine , Instrument Transformer 52 V , 415 V For Calendaring Machine , Table Float Switch , Steamer Hose With Nozzle For Electric Boiler , Steam Air Gun For Electric Boiler , Pressure Switch For Electric Boiler , Cold Spotting Chemical Gun , Thermostat For Electric Boiler , Steam Hose For Electric Boiler , Chib Micro For Electric Boiler , Teflon Shoe , Handle For Tumble Dryer , Handle R For Washer Extractor , Base For Tumble Dryer , Base Cover Utility Press , Pump St 120 For Compressor , Pilot Lamp For Boiler/Dryer , Photo Cell Stk 20K For Utility Press , Pressure Gauge For Steam Removing Machine , Nozzle 1 Gp For Compressor , Controller Stg 500 Plc Washer Extractor , Iron Box , 1/4 Solenoid Valve , 130/80 Table Cloth , Fuse Connector , 9A Contactor , Blir Timer 3548 ( Grm64e ) , 1 Solenoid Valve , Iron Element 2128 , 2128 Regulator , Iron Box Silicon Pad , Comprehensive Maintenance To Industrial Laundry Equipments , Material & Labour For Comprehensive Maintenance Which Include Routine , Preventive And Breakdown Maintenance Including Repairs And Servicing Of Following Equipments For Smooth Functioning Including Cleaning , Oiling , Greasing Checking Of Complete System For Trouble Free Fuctionability , Replacing Worn Out Nuts , Bolts , V-Belts Etc As Required . ( A ) Tumble Drier 120Kg , Model:Rtd 120 Make:Lhp-2Nos ( B ) Washer Extractor 120Kg , Model:Rvwe 120 - 2Nos ( C ) Legger Laundry Press , Air Pressure 6-7 , Steam Inlet1/2Steam Outlet1 /2 , Vaccum Size 4 , Vacuum Motor 0 . 75Hp , Air Inlet Size 8Mm , Weight 460Kgs , Make: Ramson-2 Nos . ( D ) Vacuum Ironing Table , Make: Ramson 2128 Iron Or Equivalent In Stefab/Fabcure/Lucky Engineering - 8 Nos . ( E ) Compressor 5Hp , Make : Ramsons - 1 Nos . Note : 1 . All Labour , Consumables And Replacement Of Minor Parts Shall Deemed To Be Included Under The Unit Rate Quoted . 2 . Major Spare Parts Catered Under Item Will Be Measure And Paid Separately Under Relevant Item . 3 . Attending Breakdown Call & Necessary Services Shall Be Deemed To Included Under The Unit Rate Quoted . 4 . In Case Of Any Delay In Attending The Defects By The Contractor , Necessary Penal Recovery Will Be Affected As Stipulated In The Particular Specifications . , Note For Item No . 2 . 01:-1 . All Labour , Consumables And Replacement Of Minor Parts Shall Be Deemed To Be Included Under The Unit Rate Quoted2 . Major Spare Parts Catered Under Item No . 2 . 04 To 2 . 53 Will Be Measured And Paid Separately Under Relevant Item3 . Attending Breakdown Call & Necessary Servicing Shall Be Deemed To Be Included Under The Unit Rate Quoted For Above Item . 4 . In Case Of Any Delay In Attending The Defects By The Contractor , Necessary Penal Recovery Will Be Affected As Stipulated In The Particular Specifications . , Spares Required For Tumble Drier:- , Plc Probe , 415-220 Transformer , 6A Wire Connector , 16A Wire Connector , 12A Contactor , Hooter , Olr 2 . 5 - 4 With Base , Ypdt Timer , Fpr O2 Timer , Temperature Controller With Probe , Indicator Lamp ( Red & Green ) , Start & Stop Button , On & Off Switch , Fuse Connector , Rtd Door Handle ( Door Lock ) , 27 Fin Heater , Door Limit Switch , Emergency Stop Button , Door Gasket , Spares Required For Washer Extractor:- , Io Card , Transformer 12-01-12 , Contactor 9A , Aidi Powder Off Delay Timer , Pressure Switch , Cooling Fan 4 , 3 Way Solenoid Valve , 2 Way Solenoid Valve , 5/2 Solenoid Valve , Vibration Switch , 8 Pin Omron Relay , 1 Solenoid Valve , 1/2 Solenoid Valve , 9 Kw Heater , Flat Heater , Temperature Probe , Belt Ax85 , Drain Hose , Drain Hose Clamp , Drain Cylinder , Pneumatic Y Type Valve 1 , Hydraulic Hose For Water , Transparent Hose , Pu4 Hose , Pu8 Hose , Drain Bush , Pu Connector 1/4 X 4 , 6 , 8 , 1/4 Hose Clamp , Air Filter Set , Stainer , Comprehensive Maintenance To Boiler , Comprehensive Maintenance And Servicing Of Boiler Of 600 Kg/Hour Capacity Of Mechanical Laundry Including Control Panel Including All Connected Items And Carrying Out Routine Check Of The Machine Oiling , Greasing Replacement Of All The Worn Out Defective Minor/Major Parts Greasing For Smooth Functioning As Specified And Directed By Eic . ( A ) Oil Fired Boiler ( Non Ibr ) With Evaporation Capacity 600 Litres - 2 Nos ( B ) Water Softner Plant For Oil Fired Boiler ( Non Ibr ) - 2 Nos ( C ) Ph Dosing Pump For Oil Fired Boiler ( Non Ibr ) - 2 Nos , Spares Required For Boiler- , Belt V-Inch-A 56 ( P05b010140 ) , Burner ( Seq ) Cont-Sie ( L&S ) -Lmo24 . 111C2 , 230V With Base ( P42bc10160 ) , Gland Washer ( Po1rds0690 ) , Heat Optimiser ( Prxec10014 ) , Ignition Electrode-Cap-Api 15017170 ( P22ie10010 ) , Ignition Electrode-Lodge , Iec 5 ( 125Mm ) ( P22ie10050 ) , Limit Switch-10A , 500V , 1No+1Nc ( P41zs10010 ) , Nozzle-Danfoss-7 . 5 Gph , D45 , Spat-B ( P22nd10080 ) , Photo Cell-Sie ( L&S ) -Qrb 1A ( A070b70a ) With Accessories -Large ( P22be10050 ) , Pid Control-Selec-Tc-513Ax-Ns207- ( I/P-Rtd/Tc +1C/O C . Rly , 1Sp ) ( 48X48 ) ( P42g190180 ) , Pr Gauge Brdn-Wpc/Pb-0-25 Kg , D100 , 3/8 Bspt , Pcb ( P41pg10160 ) , Pr Gauge Brdn-Wpc/Pb-0-40 Kg , D63 , 1/4 Bspt , Pcb ( P41pg10170 ) , Pr Switch-4 To 40 Bar ( P41ps10060 ) , Solenoid Coil For Burner Rod110v/50Hz , Sp-Filter-Element . 10 Mesh , 1/2 , Pno-P260110070 ( P260190270 ) , Sp-Filter Gasket For Filter Cover ( P260190260 ) , Temp Element ( Rtd ) -Pt100 , Simplex-3/8 Bsp , D6 X Lg 100 , Adj With Cable 2 . 5M ( P44te10080 ) , Supply Fix Steam Line Using 19Mm Od X 13Mm Id Seamless Ss 304 Pipe Including Coveri

BOQ

Name of Work: COMPREHENSIVE MAINTENANCE AND REPAIRING OF INDUSTRIAL LAUNDRY, STATION LAUNDRY, HOSPITAL LAUNDRY EQUIPMENTS AND RO PLANT UNDER AGE E/M (MAINT) AT INA EZHIMALA
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11COMPREHENSIVE MAINTENANCE TO HOSPITAL LAUNDRY AND STATION LAUNDRY EQUIPMENTS1
21.01M&L for Comprehensive maintenance including routine, preventive and breakdown maintenance , repairs and servicing of following Equipments for smooth functioning including cleaning, oiling, greasing checking of complete system for trouble free functionability, replacing worn out nuts, bolts, V-belts etc as required all as specified and directed by Engineer -in -charge\n(a) Washer Extractor RVW30 -2Nos\n(b) Washer Extractor RVW45- 4Nos\n(c) Tumble dryer RTD 30- 2 Nos\n(d) Tumble dryer RTD 60- 4 Nos\n(e) Calendaring Machine RFWI 2000x400- 1 No.\n(f) Calendaring Machine RFWI 1600x400-1 No.\n(g) Vacuum Ironing table RV 130X 80- 2 Nos.\n(h) Electrical boiler MR 12 - 4 Nos.\n(i) Electrical boiler MR 18 - 2 Nos.\n(j) Utility Press STD - 2 Nos.\n(k)Stain Removing machine CL 7 - 1No.\n(l) Compressor STD - 2 Nos.1.019Each Job per Month
31.02Notes for Item No.1.01:-\n1. All labour, consumables and replacement of minor parts shall be deemed to be included under the unit rate quoted\n2. Major spare parts catered under item No. 1.04 to 1.44 will be measured and paid separately under relevant item\n3. Attending breakdown call & necessary servicing shall be deemed to be included under the unit rate quoted for above Item.\n4. In case of any delay in attending the defects by the contractor, necessary penal recovery will be affected as stipulated in the particular specifications.\n5. Comprehensive maintenance of Hospital Laundry & Station Laundry under Sl Item No 1 of Schedule 'A' is to be started on or after 08 July 2020 only1.02
41.03Supply and Replace following spare parts required for Laundry Equipments:-1.03
51.04Control Module for washer extractor1.042Each
61.05Limit Switch for washer extractor1.054Each
71.06Heavy duty door latch for washer extractor1.062Each
81.07Finned Heater for tumble dryer1.072Each
91.08Contactor 50A for washer extractor1.082Each
101.09Big Hooter tumble dryer1.091Each
111.1Bearing UCFL 205 for tumble dryer1.12Each
121.11SS Flexible Hose for tumble dryer1.112Each
131.12Spring RTD 30 for tumble dryer1.124Each
141.13Hydro crone Bush for washer extractor1.132Each
151.14Bridge Rectifier calendaring machine1.142Each
161.15Instrument Transformer 52 V,415 V for calendaring machine1.152Each
171.16Table float switch1.162Each
181.17Steamer Hose with Nozzle for electric boiler1.172Each
191.18Steam air gun for electric boiler1.182Each
201.19Pressure switch for electric boiler1.192Each
211.2Cold Spotting Chemical Gun1.22Each
221.21Thermostat for electric boiler1.212Each
231.22Steam Hose for electric boiler1.222Each
241.23Chib micro for electric boiler1.232Each
251.24Teflon Shoe1.248Each
261.25Handle for tumble dryer1.252Each
271.26Handle R for washer extractor1.262Each
281.27Base for tumble dryer1.272Each
291.28Base Cover Utility press1.282Each
301.29Pump ST 120 for compressor1.292Each
311.3Pilot lamp for boiler/dryer1.32Each
321.31Photo cell STK 20K for utility press1.312Each
331.32Pressure gauge for steam removing machine1.322Each
341.33Nozzle 1 GP for compressor1.332Each
351.34Controller STG 500 PLC washer extractor1.342Each
361.35Iron Box1.356Each
371.361/4\" Solenoid Valve1.362Each
381.37130/80 Table cloth1.372Each
391.38Fuse Connector1.382Each
401.399A Contactor1.392Each
411.4BLIR Timer 3548(Grm64E)1.42Each
421.411\" Solenoid Valve1.412Each
431.42Iron Element 21281.422Each
441.432128 Regulator1.432Each
451.44Iron Box silicon pad1.442Each
462COMPREHENSIVE MAINTENANCE TO INDUSTRIAL LAUNDRY EQUIPMENTS2
472.01Material & Labour for comprehensive maintenance which include routine, preventive and breakdown maintenance including repairs and servicing of following equipments for smooth functioning including cleaning, oiling, greasing checking of complete system for trouble free fuctionability, replacing worn out nuts, bolts, V-belts etc as required.\n(a) Tumble drier 120Kg,Model:RTD 120 Make:LHP-2Nos\n(b) Washer Extractor 120Kg,Model:RVWE 120 - 2Nos\n(c) Legger Laundry Press, Air Pressure 6-7, Steam inlet1/2\"\nsteam outlet1 /2\",vaccum size 4\", vacuum motor 0.75HP, Air inlet size 8mm, weight 460kgs, Make: Ramson-2 Nos.\n(d) Vacuum Ironing table, Make: Ramson 2128 Iron or equivalent in Stefab/Fabcure/Lucky Engineering - 8 Nos.\n(e) Compressor 5HP,Make : Ramsons - 1 Nos.\nNote : 1.All Labour, consumables and replacement of minor parts shall deemed to be included under the unit rate quoted.\n2. major spare parts catered under item will be measure and paid separately under relevant item.\n3. Attending breakdown call & necessary services shall be deemed to included under the unit rate quoted.\n4. In case of any delay in attending the defects by the contractor, necessary penal recovery will be affected as stipulated in the particular specifications.2.0112Each Job per Month
482.02Note for Item No. 2.01:-\n1.All labour, consumables and replacement of minor parts shall be deemed to be included under the unit rate quoted\n2. Major spare parts catered under item No. 2.04 to 2.53 will be measured and paid separately under relevant item\n3. Attending breakdown call & necessary servicing shall be deemed to be included under the unit rate quoted for above Item.\n4. In case of any delay in attending the defects by the contractor, necessary penal recovery will be affected as stipulated in the particular specifications.2.02
492.03Spares Required For Tumble Drier:-2.03
502.04PLC Probe2.042Each
512.05415-220 Transformer2.051Each
522.066A Wire Connector2.062Each
532.0716A Wire Connector2.074Each
542.0812A Contactor2.082Each
552.09Hooter2.091Each
562.1OLR 2.5 - 4 With Base2.11Each
572.11YPDT Timer2.112Each
582.12FPR O2 Timer2.122Each
592.13Temperature Controller With Probe2.132Each
602.14Indicator Lamp (Red & Green)2.146Each
612.15Start & Stop Button2.154Each
622.16ON & OFF Switch2.162Each
632.17Fuse Connector2.174Each
642.18RTD Door Handle (Door Lock)2.181Each
652.1927\" Fin Heater2.194Each
662.2Door Limit Switch2.22Each
672.21Emergency Stop Button2.214Each
682.22Door Gasket2.224Each
692.23Spares Required For Washer Extractor:-2.23
702.24IO Card2.241Each
712.25Transformer 12-01-122.251Each
722.26Contactor 9A2.262Each
732.27AIDI Powder OFF Delay Timer2.272Each
742.28Pressure Switch2.282Each
752.29Cooling Fan 4\"2.292Each
762.33 Way Solenoid Valve2.32Each
772.312 Way Solenoid Valve2.312Each
782.325/2 Solenoid Valve2.322Each
792.33Vibration Switch2.331Each
802.348 PIN Omron Relay2.342Each
812.351\" Solenoid Valve2.352Each
822.361/2\" Solenoid Valve2.362Each
832.379 KW Heater2.372Each
842.38Flat Heater2.382Each
852.39Temperature probe2.394Each
862.4Belt AX852.44Each
872.41Drain Hose2.414Each
882.42Drain Hose Clamp2.424Each
892.43Drain Cylinder2.431Each
902.44Pneumatic Y Type Valve 1\"2.441Each
912.45Hydraulic Hose For Water2.454Each
922.46Transparent Hose2.464Each
932.47PU4 Hose2.474Each
942.48PU8 Hose2.484Each
952.49Drain Bush2.492Each
962.5PU Connector 1/4\" X 4,6,82.54Each
972.511/4\" Hose Clamp2.512Each
982.52Air Filter Set2.521Each
992.53Stainer2.531Each
1003COMPREHENSIVE MAINTENANCE TO BOILER3
1013.01Comprehensive Maintenance and Servicing of Boiler of 600 kg/hour Capacity of Mechanical laundry including control panel including all connected items and carrying out routine check of the machine oiling, greasing replacement of all the worn out defective minor/major parts greasing for smooth functioning as specified and directed by EIC.\n(a) Oil fired boiler (Non IBR) with evaporation capacity 600 litres - 2 Nos\n(b) water softner plant for OIl fired boiler (Non IBR) - 2 Nos\n(c) pH dosing pump for Oil fired boiler (Non IBR) - 2 Nos3.0112Each Job per Month
1023.02Spares Required For Boiler-3.02
1033.03Belt V-inch-A 56 (P05B010140)3.032Each
1043.04Burner(SEQ) CONT-SIE (L&S)-LMO24.111C2,230v With Base (P42BC10160)3.042Each
1053.05Gland Washer (PO1RDS0690)3.052Each
1063.06Heat Optimiser (PRXEC10014)3.061Each
1073.07Ignition Electrode-Cap-API 15017170 (P22IE10010)3.072Each
1083.08Ignition Electrode-Lodge, IEC 5\" (125MM) (P22IE10050)3.082Each
1093.09Limit Switch-10A,500V,1NO+1NC (P41ZS10010)3.092Each
1103.1Nozzle-Danfoss-7.5 GPH,D45,S'PAT-B (P22ND10080)3.12Each
1113.11Photo Cell-SIE (L&S)-QRB 1A (A070B70A)With Accessories -Large (P22BE10050)3.112Each
1123.12PID Control-SELEC-TC-513AX-NS207-(I/P-RTD/TC +1c/O C.RLY,1SP) (48X48) (P42G190180)3.121Each
1133.13PR Gauge BRDN-WPC/PB-0-25 KG, D100,3/8 BSPT, PCB (P41PG10160)3.131Each
1143.14PR Gauge BRDN-WPC/PB-0-40 KG, D63,1/4 BSPT, PCB (P41PG10170)3.141Each
1153.15PR Switch-4 TO 40 BAR (P41PS10060)3.152Each
1163.16Solenoid Coil For Burner ROD110V/50Hz3.162Each
1173.17SP-Filter-Element.10 MESH,1/2\", PNO-P260110070 (P260190270)3.171Each
1183.18SP-Filter Gasket For Filter Cover (P260190260)3.182Each
1193.19Temp Element (RTD)-PT100,SIMPLEX-3/8\" BSP,D6 X LG 100, ADJ With Cable 2.5M(P44TE10080)3.192Each
1203.2Supply Fix Steam line using 19mm OD x 13mm ID Seamless SS 304 pipe including covering with asbestos rope and steam line with all spares required like., Flange ASA 150 1/2\",Collar 3/8,Collar Heavy 1/2\" ,Ball valve 1/2\",Pipe Nipple 1/2\" x 6, Teflon tape, None metallic Ring gasket 1/2,Long Bend 1/2\",Tee B/W 1/2,MS Long bend ISS, Heavy 1/2\",Pipe Nipple 1/2 x 9 complete as directed by EIC.3.220Job per RM
1214M&L for Comprehensive maintenance to RO Plant of capacity 6000 LPH including cleaning, checking of complete system for trouble free functioning and replacing/servicing for the following complaints :-\n(a) Pre-filter shall be changed once in three months.\n(b) General service shall be done once in three months.\n(c) Sand Media shall be changed once in contract period\n(d) Carbon Media shall be changed once in contract period\n(e) Membrane cleaning will be done once in six months.\n(f) Feed pump will be serviced and repaired.\n(g) High Pressure Pump shall be serviced and repaired if required and as directed by EIC.\n(h) Pressure gauges and pressure switch shall be replaced if required and as directed by EIC.\n(j) Multiport valve shall be required and replaced if any fault occurs and as directed by EIC.\nNote : 1.All labour, consumables and replacement of minor parts/filters/media/valves/gauges/switches etc. shall deemed to be included under the unit rate quoted.\n2. Attending breakdown call & nececessary servicing shall be deemed to be included under the unit rate quoted for the above Item.\n3. In case of any delay in attending the defects by the contractor, neccessary penal recovery will be affected as stipulated in the particular specifications.\n4. Comprehensive maintenance of RO Plant under this Item is to be started on or after 08 July 2020 only420Each Job per Nine Months

AI Tender Summary

OUR REF NO 24114484
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 28.75 Lakhs
LAST DATE 06-04-2020
Authority
Authority Name Military Engineer Services
Work Description Comprehensive Maintenance And Repairing Of Industrial Laundry Station Laundry Hospital Laundry Equipments And Ro Plant Under Age E/M Maint At Ina Ezhimala Plant At Ina Ezhimala As Per Boq And Tender Documents , Comprehensive Maintenance To Hospital Laundry And Station Laundry Equipments , M&L For Comprehensive Maintenance Including Routine , Preventive And Breakdown Maintenance , Repairs And Servicing Of Following Equipments For Smooth Functioning Including Cleaning , Oiling , Greasing Checking Of Complete System For Trouble Free Functionability , Replacing Worn Out Nuts , Bolts , V-Belts Etc As Required All As Specified And Directed By Engineer -In -Charge ( A ) Washer Extractor Rvw30 -2Nos ( B ) Washer Extractor Rvw45- 4Nos ( C ) Tumble Dryer Rtd 30- 2 Nos ( D ) Tumble Dryer Rtd 60- 4 Nos ( E ) Calendaring Machine Rfwi 2000X400- 1 No . ( F ) Calendaring Machine Rfwi 1600X400-1 No . ( G ) Vacuum Ironing Table Rv 130X 80- 2 Nos . ( H ) Electrical Boiler Mr 12 - 4 Nos . ( I ) Electrical Boiler Mr 18 - 2 Nos . ( J ) Utility Press Std - 2 Nos . ( K ) Stain Removing Machine Cl 7 - 1No . ( L ) Compressor Std - 2 Nos . , Notes For Item No . 1 . 01:-1 . All Labour , Consumables And Replacement Of Minor Parts Shall Be Deemed To Be Included Under The Unit Rate Quoted2 . Major Spare Parts Catered Under Item No . 1 . 04 To 1 . 44 Will Be Measured And Paid Separately Under Relevant Item3 . Attending Breakdown Call & Necessary Servicing Shall Be Deemed To Be Included Under The Unit Rate Quoted For Above Item . 4 . In Case Of Any Delay In Attending The Defects By The Contractor , Necessary Penal Recovery Will Be Affected As Stipulated In The Particular Specifications . 5 . Comprehensive Maintenance Of Hospital Laundry & Station Laundry Under Sl Item No 1 Of Schedule A Is To Be Started On Or After 08 July 2020 Only , Supply And Replace Following Spare Parts Required For Laundry Equipments:- , Control Module For Washer Extractor , Limit Switch For Washer Extractor , Heavy Duty Door Latch For Washer Extractor , Finned Heater For Tumble Dryer , Contactor 50A For Washer Extractor , Big Hooter Tumble Dryer , Bearing Ucfl 205 For Tumble Dryer , Ss Flexible Hose For Tumble Dryer , Spring Rtd 30 For Tumble Dryer , Hydro Crone Bush For Washer Extractor , Bridge Rectifier Calendaring Machine , Instrument Transformer 52 V , 415 V For Calendaring Machine , Table Float Switch , Steamer Hose With Nozzle For Electric Boiler , Steam Air Gun For Electric Boiler , Pressure Switch For Electric Boiler , Cold Spotting Chemical Gun , Thermostat For Electric Boiler , Steam Hose For Electric Boiler , Chib Micro For Electric Boiler , Teflon Shoe , Handle For Tumble Dryer , Handle R For Washer Extractor , Base For Tumble Dryer , Base Cover Utility Press , Pump St 120 For Compressor , Pilot Lamp For Boiler/Dryer , Photo Cell Stk 20K For Utility Press , Pressure Gauge For Steam Removing Machine , Nozzle 1 Gp For Compressor , Controller Stg 500 Plc Washer Extractor , Iron Box , 1/4 Solenoid Valve , 130/80 Table Cloth , Fuse Connector , 9A Contactor , Blir Timer 3548 ( Grm64e ) , 1 Solenoid Valve , Iron Element 2128 , 2128 Regulator , Iron Box Silicon Pad , Comprehensive Maintenance To Industrial Laundry Equipments , Material & Labour For Comprehensive Maintenance Which Include Routine , Preventive And Breakdown Maintenance Including Repairs And Servicing Of Following Equipments For Smooth Functioning Including Cleaning , Oiling , Greasing Checking Of Complete System For Trouble Free Fuctionability , Replacing Worn Out Nuts , Bolts , V-Belts Etc As Required . ( A ) Tumble Drier 120Kg , Model:Rtd 120 Make:Lhp-2Nos ( B ) Washer Extractor 120Kg , Model:Rvwe 120 - 2Nos ( C ) Legger Laundry Press , Air Pressure 6-7 , Steam Inlet1/2Steam Outlet1 /2 , Vaccum Size 4 , Vacuum Motor 0 . 75Hp , Air Inlet Size 8Mm , Weight 460Kgs , Make: Ramson-2 Nos . ( D ) Vacuum Ironing Table , Make: Ramson 2128 Iron Or Equivalent In Stefab/Fabcure/Lucky Engineering - 8 Nos . ( E ) Compressor 5Hp , Make : Ramsons - 1 Nos . Note : 1 . All Labour , Consumables And Replacement Of Minor Parts Shall Deemed To Be Included Under The Unit Rate Quoted . 2 . Major Spare Parts Catered Under Item Will Be Measure And Paid Separately Under Relevant Item . 3 . Attending Breakdown Call & Necessary Services Shall Be Deemed To Included Under The Unit Rate Quoted . 4 . In Case Of Any Delay In Attending The Defects By The Contractor , Necessary Penal Recovery Will Be Affected As Stipulated In The Particular Specifications . , Note For Item No . 2 . 01:-1 . All Labour , Consumables And Replacement Of Minor Parts Shall Be Deemed To Be Included Under The Unit Rate Quoted2 . Major Spare Parts Catered Under Item No . 2 . 04 To 2 . 53 Will Be Measured And Paid Separately Under Relevant Item3 . Attending Breakdown Call & Necessary Servicing Shall Be Deemed To Be Included Under The Unit Rate Quoted For Above Item . 4 . In Case Of Any Delay In Attending The Defects By The Contractor , Necessary Penal Recovery Will Be Affected As Stipulated In The Particular Specifications . , Spares Required For Tumble Drier:- , Plc Probe , 415-220 Transformer , 6A Wire Connector , 16A Wire Connector , 12A Contactor , Hooter , Olr 2 . 5 - 4 With Base , Ypdt Timer , Fpr O2 Timer , Temperature Controller With Probe , Indicator Lamp ( Red & Green ) , Start & Stop Button , On & Off Switch , Fuse Connector , Rtd Door Handle ( Door Lock ) , 27 Fin Heater , Door Limit Switch , Emergency Stop Button , Door Gasket , Spares Required For Washer Extractor:- , Io Card , Transformer 12-01-12 , Contactor 9A , Aidi Powder Off Delay Timer , Pressure Switch , Cooling Fan 4 , 3 Way Solenoid Valve , 2 Way Solenoid Valve , 5/2 Solenoid Valve , Vibration Switch , 8 Pin Omron Relay , 1 Solenoid Valve , 1/2 Solenoid Valve , 9 Kw Heater , Flat Heater , Temperature Probe , Belt Ax85 , Drain Hose , Drain Hose Clamp , Drain Cylinder , Pneumatic Y Type Valve 1 , Hydraulic Hose For Water , Transparent Hose , Pu4 Hose , Pu8 Hose , Drain Bush , Pu Connector 1/4 X 4 , 6 , 8 , 1/4 Hose Clamp , Air Filter Set , Stainer , Comprehensive Maintenance To Boiler , Comprehensive Maintenance And Servicing Of Boiler Of 600 Kg/Hour Capacity Of Mechanical Laundry Including Control Panel Including All Connected Items And Carrying Out Routine Check Of The Machine Oiling , Greasing Replacement Of All The Worn Out Defective Minor/Major Parts Greasing For Smooth Functioning As Specified And Directed By Eic . ( A ) Oil Fired Boiler ( Non Ibr ) With Evaporation Capacity 600 Litres - 2 Nos ( B ) Water Softner Plant For Oil Fired Boiler ( Non Ibr ) - 2 Nos ( C ) Ph Dosing Pump For Oil Fired Boiler ( Non Ibr ) - 2 Nos , Spares Required For Boiler- , Belt V-Inch-A 56 ( P05b010140 ) , Burner ( Seq ) Cont-Sie ( L&S ) -Lmo24 . 111C2 , 230V With Base ( P42bc10160 ) , Gland Washer ( Po1rds0690 ) , Heat Optimiser ( Prxec10014 ) , Ignition Electrode-Cap-Api 15017170 ( P22ie10010 ) , Ignition Electrode-Lodge , Iec 5 ( 125Mm ) ( P22ie10050 ) , Limit Switch-10A , 500V , 1No+1Nc ( P41zs10010 ) , Nozzle-Danfoss-7 . 5 Gph , D45 , Spat-B ( P22nd10080 ) , Photo Cell-Sie ( L&S ) -Qrb 1A ( A070b70a ) With Accessories -Large ( P22be10050 ) , Pid Control-Selec-Tc-513Ax-Ns207- ( I/P-Rtd/Tc +1C/O C . Rly , 1Sp ) ( 48X48 ) ( P42g190180 ) , Pr Gauge Brdn-Wpc/Pb-0-25 Kg , D100 , 3/8 Bspt , Pcb ( P41pg10160 ) , Pr Gauge Brdn-Wpc/Pb-0-40 Kg , D63 , 1/4 Bspt , Pcb ( P41pg10170 ) , Pr Switch-4 To 40 Bar ( P41ps10060 ) , Solenoid Coil For Burner Rod110v/50Hz , Sp-Filter-Element . 10 Mesh , 1/2 , Pno-P260110070 ( P260190270 ) , Sp-Filter Gasket For Filter Cover ( P260190260 ) , Temp Element ( Rtd ) -Pt100 , Simplex-3/8 Bsp , D6 X Lg 100 , Adj With Cable 2 . 5M ( P44te10080 ) , Supply Fix Steam Line Using 19Mm Od X 13Mm Id Seamless Ss 304 Pipe Including Coveri
Basic Detail
Tender No GE MAINT EZHIMALA NEW 8305
Bidding Type Tender
Location
City GE(MAINT)EZHIMALA
State Kerala
Key Dates
Publish Date 21 Mar 2020
Submission Date 06 Apr 2020
Open Date 08 Apr 2020
Finance
Tender Value 28.75 Lakhs
Tender Fee 50
EMD 57500
Exemption Not Available
Document List
BE072994-1453-4D68-9E20-3A8D3D108F99.html
Tendernotice_1.pdf
BOQ_375445.xls
Tenderdocument_8305.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 21, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 06, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 08, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

BE072994-1453-4D68-9E20-3A8D3D108F99.html

pdf

Tendernotice_1.pdf

xls

BOQ_375445.xls

pdf

Tenderdocument_8305.pdf

TenderDetail
Loading tenders