| 1 | 10 | Supply Items | 1 | | |
|---|
| 2 | 20 | 8\", SORF FLANGE, ANSI - 150# (B 16.5) | 2 | 4 | EA |
|---|
| 3 | 30 | 16\", SORF FLANGE, ANSI - 150# (B 16.5) | 3 | 4 | EA |
|---|
| 4 | 40 | 20\", SORF FLANGE, ANSI - 150# (B 16.5) | 4 | 3 | EA |
|---|
| 5 | 50 | 4\", SORF FLANGE, ANSI - 150# (B 16.5) | 5 | 2 | EA |
|---|
| 6 | 60 | BLRF, 20\"x 150 # | 6 | 3 | EA |
|---|
| 7 | 70 | BLRF, 12\"x 150 # | 7 | 1 | EA |
|---|
| 8 | 80 | 10\"x8\" x CR X150#(Concentric Reducer) | 8 | 2 | EA |
|---|
| 9 | 90 | 12\"x 8\"x ER x 150#(Eccentric Reducer) | 9 | 2 | EA |
|---|
| 10 | 100 | 20\"OD x 0.375\"WT,IS:3589, GR.410, BE ERW PIPES | 10 | 15 | M |
|---|
| 11 | 110 | 8.625\" OD x 0.250\",IS:3589, GR.410, BE ERW PIPES | 11 | 4 | M |
|---|
| 12 | 120 | NRV, Swing Check Valve, 10\", ANSI 150#, BS 1868, F/F, AG | 12 | 2 | EA |
|---|
| 13 | 130 | 10\"x ANSI 150 # HOV F/F API 600 Gate Valve | 13 | 2 | EA |
|---|
| 14 | 140 | 12\"x ANSI 150 # HOV F/F API 600 Gate Valve | 14 | 2 | EA |
|---|
| 15 | 150 | 16\"x ANSI 150 # HOV F/F API 600 Gate Valve | 15 | 8 | EA |
|---|
| 16 | 160 | 1\"x ANSI 800# HOV W/W API 602 Gate Valve | 16 | 3 | EA |
|---|
| 17 | 170 | Unequal Tee 20x12x20\" | 17 | 2 | EA |
|---|
| 18 | 180 | Unequal Tee 20x10x20\" | 18 | 2 | EA |
|---|
| 19 | 190 | Unequal Tee 20x16x20\" | 19 | 3 | EA |
|---|
| 20 | 200 | Unequal Tee 20x8x20\" | 20 | 1 | EA |
|---|
| 21 | 210 | TEE,EQ,BW,CS,A234,WPB,20IN,20 | 21 | 1 | EA |
|---|
| 22 | 220 | Y-TYPE STRAINER, 12INX12IN - 150 | 22 | 2 | EA |
|---|
| 23 | 230 | 12\" ANSI 150# 45 deg LR Bends | 23 | 1 | EA |
|---|
| 24 | 240 | 12\" ANSI 150# 90 deg LR Bends | 24 | 6 | EA |
|---|
| 25 | 250 | 16\" ANSI 150# 90 deg LR Bends | 25 | 8 | EA |
|---|
| 26 | 260 | 20\" ANSI 150# 90 deg LR Bends | 26 | 2 | EA |
|---|
| 27 | 270 | 10\"x2\"x150# Weld-o-let | 27 | 2 | EA |
|---|
| 28 | 280 | 1\" 3000 lbs HALF COUPLING | 28 | 4 | EA |
|---|
| 29 | 290 | Concentric Reducer 2\"x1\" 150# | 29 | 4 | EA |
|---|
| 30 | 300 | 1\" size 3000 lbs St. NIPPLE | 30 | 4 | EA |
|---|
| 31 | 310 | 4\" SWMG ANSI 150# | 31 | 2 | EA |
|---|
| 32 | 320 | 10\" SWMG ANSI 150# (***-*** Nos.) | 32 | 2 | EA |
|---|
| 33 | 330 | 16\" SWMG ANSI 150# (***-*** Nos.) | 33 | 24 | EA |
|---|
| 34 | 340 | 20\" SWMG ANSI 150# (***-*** Nos.) | 34 | 3 | EA |
|---|
| 35 | 350 | Fasteners for Flanges 4\" x 150# (0.625\" Dia. X 4.00\" Length) | 35 | 12 | EA |
|---|
| 36 | 360 | Fasteners for Flanges 8\" x 150# (0.750\" Dia. X 4.75\" Length) | 36 | 32 | EA |
|---|
| 37 | 370 | Fasteners for Flanges 10\" x 150# (0.875\" Dia. X 5.25\" Length ) | 37 | 72 | EA |
|---|
| 38 | 380 | Fasteners for Flanges 12\" x 150# (0.875\" Dia. X 5.50\" Length ) | 38 | 84 | EA |
|---|
| 39 | 390 | Fasteners for Flanges 16\" x 150# (1.000\" Dia. X 6.00\" Length ) | 39 | 384 | EA |
|---|
| 40 | 400 | Fasteners for Flanges 20\" x 150# (1.250\" Dia. X 7.00\" Length) | 40 | 60 | EA |
|---|
| 41 | 410 | Control Cable (12c x 1.5 square MM) | 41 | 50 | M |
|---|
| 42 | 420 | Control JB Type B | 42 | 1 | EA |
|---|
| 43 | 430 | CABLE GLAND 1 IN NPT FLP/WP | 43 | 1 | EA |
|---|
| 44 | 440 | CABLE GLAND - 1/2 IN NPT | 44 | 4 | EA |
|---|
| 45 | 450 | CABLE GLAND - 3/4 IN NPT | 45 | 2 | EA |
|---|
| 46 | 460 | cable Plugs 1/2 IN NPT | 46 | 2 | EA |
|---|
| 47 | 470 | Service Items-Mechanical | 47 | | |
|---|
| 48 | 480 | Dismantling of Piping (Aboveground) and equipments: | 48 | 10 | TON |
|---|
| 49 | 490 | Dismantling of Piping (Underground): | 49 | 2 | TON |
|---|
| 50 | 500 | Engine Driven F/F Pumping Units Installation: | 50 | | |
|---|
| 51 | 510 | Fire fighting Pumping Unit | 51 | 2 | EA |
|---|
| 52 | 520 | Installation of Valves: (FIRE WATER PIPING): | 52 | | |
|---|
| 53 | 530 | 12\"x ANSI 150 # HOV F/F API 600 Gate Valve | 53 | 2 | EA |
|---|
| 54 | 540 | 10\"x ANSI 150 # HOV F/F API 600 Gate Valve | 54 | 2 | EA |
|---|
| 55 | 550 | 10\"x ANSI 150# F/F BS 1868 Swing/Dual plateCheck Valve | 55 | 2 | EA |
|---|
| 56 | 560 | 16\"x ANSI 150 # HOV F/F API 600 Gate Valve | 56 | 8 | EA |
|---|
| 57 | 570 | 4\"x ANSI 150 # HOV F/F API 600 Gate Valve | 57 | 1 | EA |
|---|
| 58 | 580 | Installation of Above ground piping for Fire Water Services: (with Internal Epoxy Coating):\nTaking delivery of pipes, pipe-fittings, carbon steel flanges (SORF/WNRF), spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, fabrication and erection of above-ground piping including cutting, edge preparation, bending, threading, liningup, welding of SORF flanges on both sides of the pipe section of length not more than 12m & fittings, and erecting pipe sections with SORF end connections and pipe fittings, flanges, elbows, equal and reducing outlet tees, concentric / eccentric reducers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, inline instruments etc., welded/SORF/WNRF flange connected and threaded pipeline of different pressure ratings, flushing pipes by water after cleaning by compressed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, finalcleaning -up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the work (other than those specifically undertaken by the owner in this contract). The scope shall also include blast cleaning of internal surface of pipes, Pipefittings, and Valves.... etc conforming to ISO-Sa21/2, followed by application of Two component solvent free amine cured epoxy coating with thickness of 350-400 Microns and completing the work in all respects in accordance with the drawings, specifications and instructions of the Site Engineer / EIC.ications and instructions of Site Engineer | 58 | | |
|---|
| 59 | 590 | 20\"OD x 0.375\"WT,IS:3589, GR.410, BE ERW PIPES | 59 | 12 | M |
|---|
| 60 | 600 | 16\" ODx 0.375\" WT IS3589 FE410 Pipe | 60 | 100 | M |
|---|
| 61 | 610 | 12.75\" ODx 0.250\" WT IS3589 FE410 Pipe | 61 | 10 | M |
|---|
| 62 | 620 | 10.75\" ODx 0.250\" WT IS3589 FE410 Pipe | 62 | 14 | M |
|---|
| 63 | 630 | 8.625\" ODx 0.250\" WT IS3589 FE410 Pipe | 63 | 4 | M |
|---|
| 64 | 640 | 1.315\" OD x 0.179\"WT ASTM A 106 Gr B -FW | 64 | 2 | M |
|---|
| 65 | 650 | Under ground piping for Fire Water Services: (With Internal Epoxy Coating and external Epoxy / PU Coating): Taking delivery of pipes, pipe fittings, steel flanges (WNRF/SORF), spiral wound metallic gaskets & fasteners from designated location within station premises transporting the same to site, fabrication and erection of underground piping including cutting, edge preparation, bending, threading, lining-up and welding of SORF flanges on both sides of the pipe section of length not more than 12m & fittings, excavating, trenching in all kind of soil to specific depths as indicated in drawings and and erecting pipe sections with SORF end connections and pipe fittings such as elbows, equal and reducing outlet tees, concentric / eccentric reducers, drain funnels, vent pipe and tapping for instruments uch as pessure gauges, thermal relief valves, thermowells etc., underground at elevations indicated in the drawing connecting with equipment nozzles, valves, vessels, in-line instruments etc., Cleaning exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges, equipment and valves etc. by sand-blasting or with power wire brush (wherever sand-blast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating (PU) using 100% solvent free elastomeric plyurethane / liquid epoxy, with approved materials, Equipment etc, holiday detection of the coating, cleaning of coated pipes by water flushing after cleaning by compresed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, backfilling, restoration of site final cleaning up and disposal of water and surpluses, providing all inputs such as labour,\nNote:-Charges for applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane for exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipment and valves etc shall be paid under separate SOR Item. | 65 | | |
|---|
| 66 | 660 | 20\"OD x 0.375\"WT,IS:3589, GR.410, BE ERW PIPES | 66 | 32 | M |
|---|
| 67 | 670 | 16\" ODx 0.375\" WT IS3589 FE410 Pipe | 67 | 40 | M |
|---|
| 68 | 680 | Fabrication of Mitre Bends - Long Radius: (only for fire water piping) | 68 | | |
|---|
| 69 | 690 | 10.75\" OD x 0.365\"/0.250\" more than 45 ° & up to 90 ° Bend | 69 | 4 | EA |
|---|
| 70 | 700 | 12.75\" OD x 0.375\" WT more than 45° & up to 90° Bend | 70 | 4 | EA |
|---|
| 71 | 710 | 16\" OD x 0.375\" WT more than 45 ° & up to 90 ° Bend | 71 | 1 | EA |
|---|
| 72 | 720 | Radiographic Inspection:Inspection of welding by radiographic method on all types of piping including processing of films and interpreting the results of weld quality and reporting the same to the Site Engineer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inputs, etc. and providing all services complete in all respects as envisaged in the contract documents. | 72 | | |
|---|
| 73 | 730 | 20\" NB Pipe Joints (****** - ****Nos.) | 73 | 6 | EA |
|---|
| 74 | 740 | 16\" NB Pipe Joints (****** - ****Nos.) | 74 | 8 | EA |
|---|
| 75 | 750 | 12\" NB Pipe Joints (****** - ****Nos.) | 75 | 2 | EA |
|---|
| 76 | 760 | 10\" NB Pipe Joints (****** - ****Nos.) | 76 | 2 | EA |
|---|
| 77 | 770 | Single Cut Joint Hook-up: | 77 | | |
|---|
| 78 | 780 | 16\" OD -Single | 78 | 5 | EA |
|---|
| 79 | 790 | 12.75\" OD -Single | 79 | 5 | EA |
|---|
| 80 | 800 | 10.75\" OD -Single | 80 | 5 | EA |
|---|
| 81 | 810 | 8.625\" OD-Single | 81 | 5 | EA |
|---|
| 82 | 820 | 20\" OD -Single | 82 | 1 | EA |
|---|
| 83 | 830 | 1.315\" OD -Single | 83 | 5 | EA |
|---|
| 84 | 840 | Double Cut Joint Hook-up: | 84 | | |
|---|
| 85 | 850 | 16\" OD -Single | 85 | 10 | EA |
|---|
| 86 | 860 | 12.75\" OD -Single | 86 | 3 | EA |
|---|
| 87 | 870 | 10.75\" OD -Single | 87 | 3 | EA |
|---|
| 88 | 880 | 8.625\" OD-Single | 88 | 6 | EA |
|---|
| 89 | 890 | 20\" OD -Single | 89 | 1 | EA |
|---|
| 90 | 900 | 1.315\" OD -Single | 90 | 3 | EA |
|---|
| 91 | 910 | Installation of y type strainer | 91 | | |
|---|
| 92 | 920 | 12\" 150# | 92 | 2 | EA |
|---|
| 93 | 930 | Composite Items-Mechanical | 93 | | |
|---|
| 94 | 940 | Supplying, fabricating, erecting, placing and fixing in position M.S. structural works using rolled/ built up sections for truss, claddings, bracings, purlins, supporting frames made of joists, tubes, pipes, channels, angles, plates, flats, bars etc. including cutting to required size welding of joints, fixing anchor plates, including bolts, theading, nuts, washers, sleeves etc. including preparation of detailed fabrication drawings & submission to the Engineer-in-Charge for approval before start of fabrication, supplying & applying painting with two coats of epoxy paint \"EPILUX 155 High Build Enamel over a coat of \"EPILUX 610\" Primer of M/s BERGER or any other approved equivalent make as per manufacturer’s recommendation, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge. (Excluding the cost of concrete work). | 94 | 3 | TON |
|---|
| 95 | 950 | Painting (above ground) | 95 | | |
|---|
| 96 | 960 | Zinc Ethyl Slicate Primer | 96 | 300 | SQM |
|---|
| 97 | 970 | High Build EPOXY MIO | 97 | 300 | SQM |
|---|
| 98 | 980 | Isocynate Aliphatic Poly Urethene(PU) | 98 | 300 | SQM |
|---|
| 99 | 990 | PU /liquid epoxy Coating of under ground piping: | 99 | | |
|---|
| 100 | 1000 | 1 Polyurethane Coating(PU)/ Liquid Epoxy Coating | 100 | 200 | SQM |
|---|
| 101 | 1010 | Service Items - Electrical | 101 | | |
|---|
| 102 | 1020 | Cable Laying: - Laying of all type of cables LT (PVC / XLPE / Armoured/Unarmoured/Power/ Control/ Signalling) in trenches, in cable racks, in trays, in protective pipes, poles,columns, in conduits, in panels and on structures etc.;including the supply and installation of all required materials such as fixing clamps ,screws, cable straps, tags etc. as required (other than the supply of the conduits, cables, pipes, cable racks, trays, poles, structures and panels) complete in all respect, including cost of all labour, tools, consumable materials etc. and cutting the cables in required lengths as per drawings, specification and directions of Site Engineer / Engineer-in-Charge | 102 | | |
|---|
| 103 | 1030 | (a) Control cables (T&I) : OD upto 20 mm | 103 | 10 | M |
|---|
| 104 | 1040 | (b) Control cables (T&I) : OD above 20 mm and upto 30 mm | 104 | 150 | M |
|---|
| 105 | 1050 | (c) Control cables (T&I) : OD above 30 mm and upto 40 mm | 105 | 150 | M |
|---|
| 106 | 1060 | Composite Items - Electrical | 106 | | |
|---|
| 107 | 1070 | INSTALLATION OF CONTROL PANEL - Taking delivery, shifting the panels to installaion site and erection, installation, testing of Control panels, mounted with all the instruments, power supply units, UPS & battery banks logic control systems , barriers, providing assistance to control system vendor for commissioning of control system including panels, control desk etc. installation on already made foundations or fixing on walls, or steel structure or fixtures aligning, levelling, grouting, inter-wiring outgoing, incoming cable terminations as required, earthing, testing, complete in all respects as per drawings, specifications and directions of the engineer in-charge/site engineer, including supply of suitable size non-flame proof cable glands for all incoming/outgoing cables and the cost of the materials, tools, labour, glanding, ferruling etc. complete in all respects.The indicated quantity is cumulative weight of panels. | 107 | 200 | KG |
|---|
| 108 | 1080 | CABLE TRENCH: Excavation in unpaved areas of earth in work sites for conventional cable trenches for a depth upto 1.5 metres including shoring, strutting etc. (if necessary), backfilling the trench with excavated earth, as directed by Site Engineer, including all labour and materials complete as per drawings, specification and directions of Site Engineer. | 108 | 37.5 | CUM |
|---|
| 109 | 1090 | EARTH STRIP / WIRE / ROPE / CABLE\nSupply, installing and testing of earthing strip/wire/rope/cable for completely making the earthing grid system by supplying, laying the GI / Cu strip and making all the necessary welding joints, connecting to the earthing electrodes and existing earthing grid etc., complete as per drawings, specifications and directions of the Site engineer/Engineer-in-charge, including the cost of all labour, tools, materials, etc. complete in all respect. | 109 | | |
|---|
| 110 | 1100 | 50 mm X 6 mm G.I. earthing strip | 110 | 100 | M |
|---|
| 111 | 1110 | 40 mm X 5 mm G.I. earthing strip | 111 | 50 | M |
|---|
| 112 | 1120 | Laying of GI Wire / GI Rope ( 8 SWG ) | 112 | 50 | M |
|---|
| 113 | 1130 | Perforated GI Cable Trays:- Supply, installation & fixing of prefabricated perforated GI cable trays of width 150 mm, 300 mm, 450 mm & 600 mm as per site requirement for laying of cables with standard rung spacings. Load for support span of 2.5 meter as 30, 60, 75 & 90 (in Kg/Mtr) respectively with concentric static load as 70 Kg at the centre, with materials, labour, tools and tackles, consumables etc , as per drawings, specification and directions of Site Engineer / Engineer-in-Charge | 113 | 300 | KG |
|---|
| 114 | 1140 | Civil Estimate | 114 | | |
|---|
| 115 | 1150 | Demolishing PCC manually/ by mechanical means including disposal of material within 50 metres lead as per direction of the Engineer-in-Charge. [Notes: (1) Dismantling shall be allowed during day shift only & prior permission for the same shall be obtained. (2) Providing of necessary covers/ barricades around the work area shall be done prior to dismantling operations.]\nNominal concrete 1:3:6 or richer mix (including equivalent design mix) | 115 | 35 | CUM |
|---|
| 116 | 1160 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of the Engineer-in-Charge. [Notes: (1) Dismantling shall be allowed during day shift only & prior permission for the same shall be obtained. (2) Providing of necessary covers/ barricades around the work area shall be done prior to dismantling operations. (3) Cutting of all reinforcement shall be done using hack saw or chiesel or any other method as approved by the Engineer-in-Charge.] | 116 | 7.5 | CUM |
|---|
| 117 | 1170 | Cutting road and making good the same including supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required. For WBM and Bituminous Portion. | 117 | 5 | CUM |
|---|
| 118 | 1180 | Excavation: - Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by the Engineer-in-Charge. For all Kinds of soil. | 118 | 50 | CUM |
|---|
| 119 | 1190 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. [Notes: (1) Dismantling shall be allowed during day shift only & prior permission for the same shall be obtained. (2) Providing of necessary covers/ barricades around the work area shall be done prior to dismantling operations. (3) Cutting of steel shall be done using hack saw or chiesel or any other method as approved by the Engineer-in-Charge.] | 119 | 2000 | KG |
|---|
| 120 | 1200 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 120 | 20 | CUM |
|---|
| 121 | 1210 | PCC: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level for 1:2:4 (1 cement : 2 coarse sand (Zone-III) : 4 graded stone aggregate 20 mm nominal size) | 121 | 30 | CUM |
|---|
| 122 | 1220 | Flat brick soling: - Supplying and laying flat brick soling in foundation trench, in floors, garages, sumps, etc., with bricks of class designation 50 laid to proper slope, level and grade etc. filling of the joints with sand etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of the Site Engineer | 122 | 30 | SQM |
|---|
| 123 | 1230 | RCC (1:1.5:3) Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level for 1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III): 3 graded stone aggregate 20 mm nominal size) | 123 | 25 | CUM |
|---|
| 124 | 1240 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (Thermo-Mechanically Treated bars of grade Fe-500D or more) | 124 | 3500 | KG |
|---|
| 125 | 1250 | Centering and shuttering including strutting, propping etc. and removal of form work for foundations, footings, bases for columns | 125 | 100 | SQM |
|---|
| 126 | 1260 | Centering and shuttering including strutting, propping etc. and removal of form work for columns, piers, abutments, pillars, posts and struts | 126 | 100 | SQM |
|---|
| 127 | 1270 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required in stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete. | 127 | 500 | KG |
|---|