Kip Urgent Rectification Works In Pathanapuram DistributoryBetween Ch2535 And 3020M Urgent Rectification Works
Tender Value
7 Lakhs
Estimated cost
Bid Submission
04 Apr 2020
0 days left
EMD
17500
Bank guarantee accepted
Document Fee
1550
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Pathanapuram → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Kip Urgent Rectification Works In Pathanapuram DistributoryBetween Ch2535 And 3020M Urgent Rectification Works
BOQ
| Work Name:KIP- Urgent rectification works in Pathanapuram distributory between Ch:2535 and 3020 . | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | EARTH WORK | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.01 | 2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil,as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001114 | 120 | sqm |
| 3 | 2 | REMOVAL OF SLABS | BI01010001010000000000000515BI0100001115 | ||
| 4 | 2.01 | od27130/2018_2019/P2 : Engaging a set of man coolies of 4 Nos for removing covering slab for cleaning the cut and cover and replacing the same in position after cleaning as directed by the Engineer in charge or rehandling the newly casted slabs from the casting point and placing in position,as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001116 | 3 | each |
| 5 | 2.02 | 15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead ,as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001117 | 9.45 | cum |
| 6 | 2.03 | 4.1.2 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size),as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001118 | 7.088 | cum |
| 7 | 2.04 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns,,as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001119 | 35.1 | sqm |
| 8 | 2.05 | 16.81 : Providing and erecting 2.00 metre high temporary barricading at site as per drawing / direction of Engineer - in - Charge which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer - in-Charge. The barricading provided shall be retained in position at site continuously i/c shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to executed the job . The barricading shall not be removed without prior approval of Engineer-nin-Charge. (Note:- One time payment shall be made for providing barricading from star of work till completion of work i/c shifting. The barricading provided shall remain to be the property of the contractor on completion of the work).,as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001120 | 12 | metre |
| 9 | 2.06 | 5.22.1 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars,,as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001121 | 1584.18 | kg |
| 10 | 2.07 | 50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete,,as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001122 | 28.17 | sqm |
| 11 | 3 | CONSTRUCTION OF CHAMBER | BI01010001010000000000000515BI0100001123 | ||
| 12 | 3.01 | 2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil,as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001124 | 8 | sqm |
| 13 | 3.02 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001125 | 0.8 | cum |
| 14 | 3.03 | 5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size),as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001126 | 2.97 | cum |
| 15 | 3.04 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns,as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001127 | 23.76 | sqm |
| 16 | 3.05 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size,as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001128 | 0.486 | cum |
| 17 | 3.06 | 5.22.1 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars,,as per specification and as per the direction of the Engineer- | BI01010001010000000000000515BI0100001129 | 360.18 | kg |
| 18 | 4 | LINING | BI01010001010000000000000515BI0100001130 | ||
| 19 | 4.01 | od66492/2019_2020/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of aii materials ,Label charges,watering, curing etc complete.as per specification and as per the direction of the Engineer-in-charge. | BI01010001010000000000000515BI0100001131 | 28.505 | cum |
| 20 | 4.02 | 2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil.as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001132 | 19.8 | sqm |
| 21 | 4.03 | 50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete.as per specification and as per the direction of the Engineer-in-charge | BI01010001010000000000000515BI0100001133 | 431.88 | sqm |
AI Tender Summary
Tender Timeline
Mar 26, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedApr 04, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedApr 13, 2020
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender