}

Providing Of Consultancy Services For Ascertaining Structural Stability And Suggestive Rehabilitation Scheme For Diu Ghoghla Bridge ( West Side ) At Diu . ( 2Nd Call ), DIU-Daman And Diu

Public Works Department-PWD has published Providing Of Consultancy Services For Ascertaining Structural Stability And Suggestive Rehabilitation Scheme For Diu Ghoghla Bridge ( West Side ) At Diu . ( 2Nd Call ). Submission Date for this Tender is 01-04-2020. Structural Engineering Tenders in DIU Daman And Diu. Bidders can get complete Tender details and download the document.




Tender Notice

24103282
Providing Of Consultancy Services For Ascertaining Structural Stability And Suggestive Rehabilitation Scheme For Diu Ghoghla Bridge ( West Side ) At Diu . ( 2Nd Call )
Open Tender
Indian
Daman And Diu
DIU
01-04-2020

Tender Details

Providing Of Consultancy Services For Ascertaining Structural Stability And Suggestive Rehabilitation Scheme For Diu Ghoghla Bridge ( West Side ) At Diu . ( 2Nd Call )

Key Value

Document Fees
INR 1000 /-
EMD
INR 50000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Consultancy services for ascertaining structural stability and suggestive rehabilitation scheme for Diu and Ghoghla bridge at Diu. (2nd Call)
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Civil Works :
2 1.01 PHASE -l- Safe load carrying capacity test. \nIn this phase, carrying out the existing safe load carryin capacity of the Diu-Ghoghla bridge by load testing using moving vehicle for class -A and above load. (Drawing of Front Elevation and Cross Section of Bridge are enclosed) item1 1 Job
3 1.02 PHASE -ll- Checking of bridge structures. \nIn this phase, checking & investigation, will be carried out with objective of implementing repairs and rehabilitation if any, to ensure bridge will continue to have ability to carry original design load. \n\na) Checking of protective work.\nb) Checking of Waterway. \nc) Checking of foundation. \nd) Checking of sub-structure. \ne) Checking of all bearings. \nf) Checking of superstructure \ng) Checking of expansion joints \nh) Checking of wearing cost.\ni) Checking of drainage/water spout\nj) Checking of parapets.\nk) Checking of utilities. item2 1 Job
4 1.03 PHASE-lll- Testing and Investigation. \nIn this phase, following tests and investigation, will be carried out with objective of implementing repairs and rehabilitation if any, to ensure bridge will continue to have ability to carry original design load \n\na) Non-Destructive tests as per IRC (SP-35) Appendix-8\n\n1) Rebound and penetration tests.\n2) Sonic methods.\n3) Ultrasonic techniques.\n4) Magnetic methods.\n5) Electrical methods.\n6) Nuclear methods.\n7) Radiography.\n8) X-Ray diffraction and differential thermal analysis of concrete samples.\n9) Electrochemical potentials.\n10) Electrical resistivity management.\n11) Microscopic examination using optical and polarised light microscopy.\n12) Dye penetration test and optical microscopy.\n13) Deflection monitoring.\n14) Strain measurements.\n15) Crack meters.\n\n item3 1 Job
5 1.04 PHASE-lll- Testing and Investigation. \nIn this phase, following tests and investigation, will be carried out with objective of implementing repairs and rehabilitation if any, to ensure bridge will continue to have ability to carry original design load. \n\nb) Destructive tests as per IRC (SP-35) Appendix-8\n\n1) Concrete strength.\n2) Carbonation.\n3) Endorscope.\n4) Pull out test.\n5) Pull off test.\n6) Internal fracture test.\n7) Break off test.\n8) Water penetration test.\n9) Rapid chloride test and Rapid sulphate test.\n10) Analysis of hardened concrete.\n11) Optical microscopy and expansion test on concrete cores.\n\nBased on the result of the above tests of Phase - II & III, the detailed report along with detailed and rehabilitation scheme will be prepared and submitted to the department. item4 1 Job
6 1.05 To provide detailed bill of quantity for the repairing & rehabilitation scheme, if any required and tender documents for execution of the same item5 1 Job
7 1.06 To provide corrective supervision during the progress of work item6 1 Job
8 1.07 To issue completion certificate & structural stability certificate item7 1 Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail