Agriculture Government Departments Closing in 0 days TDR #24095793

Electrical Non Schedule Item For Cold Room And Ripening Room And Its Related Works .

Issued by Government Departments · Kisan Mandi Bhawan, Vibhuti Khand, Gomti Nagar lko, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
08 Apr 2020
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kisan Mandi Bhawan, Vibhuti Khand, Gomti Nagar lko → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Electrical Non Schedule Item For Cold Room And Ripening Room And Its Related Works .

BOQ

Name of Work : Electrical Non Schedule item for Cold Room and Ripening Room and its Related Works.
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Product Name and Discription
21.01S/E of Factory fabricated & wired Metal clad dust & vermin proof floor mounting MS Chanel base with bottom & top cableentres Electrical control panel with TPN MCCBs (Four Pole 36 KA) with thermal magnatic release) Switches complete & instrument chamber etc. complete in all respects. The instrument chamber shall be separate & shall comprise of flush type digital metering system for phase to phase voltage & single phase voltage, current & other parameters (KVA, PF, KW etc.) in each phase with touch type selector switches for different readings, instrument fuses, current Tr. etc. The panel board shall have suitable capacity electrolytic Al. busbars as per IS8623 or above insulated with heat shrink sleeving & mounted on non hygroscopic supports such as CMC/BMC support with deteachable side covers & shall be suitable for extention on the sides. The MCCBs shall be complete with suitable cable end boxes, compression glands & indicating lamp on incoming etc. The job includes the grounting of the board as per directions of Engineer-in charge. All out going of 100 Amp. & above shall have an Ammeter. The panel board shall be fabricated with CRCA sheet with a min. thikness of 1.6mm/2mm. Cubicle type switch board shall be of cat A Incoming 200 Amp. MCCB - 2 Nos. 200AMP Change over - 1 No Outgoing\n32 Amp. MCCB - 4 Nos., 25 Amp. MCCB - 3 Nos, 32Amp MCCB 4 Nos, 5KVAR Capacitor Banks Feeders with Capacitors - 3 Nos with APFC relayitem11Nos
31.02S/E of Factory fabricated & wired Metal clad dust & vermin proof floor mounting MS Chanel base with bottom & top cableentres Electrical control panel with TPN MCCBs (Four Pole 36 KA) with thermal magnatic release) Switches complete & instrument chamber etc. complete in all respects. The instrument chamber shall be separate & shall comprise of flush type digital metering system for phase to phase voltage & single phase voltage, current & other parameters (KVA, PF, KW etc.) in each phase with touch type selector switches for different readings, instrument fuses, current Tr. etc. The panel board shall have suitable capacity electrolytic Al. busbars as per IS8623 or above insulated with heat shrink sleeving & mounted on non hygroscopic supports such as CMC/BMC support with deteachable side covers & shall be suitable for extention on the sides. The MCCBs shall be complete with suitable cable end boxes, compression glands & indicating lamp on incoming etc. The job includes the grounting of the board as per directions of Engineer-in charge. All out going of 100 Amp. & above shall have an Ammeter. The panel board shall be fabricated with CRCA sheet with a min. thikness of 1.6mm/2mm. Cubicle type switch board shall be of cat A IIncoming 200 Amp. MCCB - 2 Nos. 200AMP Change over - 1 No Outgoing\n32 Amp. MCCB - 5 Nos., 25 Amp. MCCB - 4 Nos,63 Amp MCCB 4 Nos, 5KVAR Capacitor Banks Feeders with Capacitors - 6 Nos with APFC relayitem21Nos
41.03Supply, installation, testing & commissioning of 40 KVA Diesel Generating Set Silent Type Radiator type, suitable for of 415V, 3 phase 4 wire, 0.8 pf. (lagging) 50c/s A.C supply complete with engine (1500 RPM) and alternator DG Set controller with accessories including residential type silencer and manual control panel fuel service tank as per standard, battery and battery charger with all associated accessories including MCCB of suitable rating & standard set of tools and anti-vibration mounting pads etc. The specification shall be as per GEM specification attached. The instalation, testing, commissioning shall be done as per GEM.item31set
51.04Supply, installation, testing & commissioning of 82.5 KVA Diesel Generating Set Silent Type Radiator type, suitable for of 415V, 3 phase 4 wire, 0.8 pf. (lagging) 50c/s A.C supply complete with engine (1500 RPM) and alternator DG Set controller with accessories including residential type silencer and manual control panel fuel service tank as per standard, battery and battery charger with all associated accessories including MCCB of suitable rating & standard set of tools and anti-vibration mounting pads etc. The specification shall be as per GEM specification attached. The instalation, testing, commissioning shall be done as per GEM.item41set
61.05Supply of 12\" (305mm) dia (900 rpm) single phase Exhaust fan with louvres complete as required.item51Nos
71.06Supply of 1200 mm dia ceiling fan complete as required simillar to Havells Velocity type or equivalent as per approved makes.item61Nos
81.07Supply, installation, testing, commissioning of Servo motor operated automatic line voltage correctors copper bound indoor type, continuous duty, conforming to IS9815(Part 1)/1994 (Reaffirmed 2009) suitable for Phase voltage of 120-280V. 3 Phase line voltage corrector shall comprise of 3 single phase line voltage correctors conforming to IS 9815 (Part 1)/1994(Reaffirmed 2009), connected in star and enclosed in a single enclosure with common control panel and shall be suitable for unbalanced input voltage. 1- Rate output voltage shall be 240V for single phase LVC and 415V for 3 phase LVC respectively. Rating 3 x 20 KVA 3 Phase, 3PH, 50 Hz.\nitem71Nos
91.08Supply, installation, testing, commissioning of Servo motor operated automatic line voltage correctors copper bound indoor type, continuous duty, conforming to IS9815(Part 1)/1994 (Reaffirmed 2009) suitable for Phase voltage of 120-280V. 3 Phase line voltage corrector shall comprise of 3 single phase line voltage correctors conforming to IS 9815 (Part 1)/1994(Reaffirmed 2009), connected in star and enclosed in a single enclosure with common control panel and shall be suitable for unbalanced input voltage. \n2- Rate output voltage shall be 240V for single phase LVC and 415V for 3 phase LVC respectively. Rating 3 x 31.5 KVA 3 Phase, 3PH, 50 Hz.\nitem81Nos
101.09Supply and fixing of PUF Insulation panel of thickness of 80 mm, for Cold Room walls & ceiling including Common walls inclusive of all accessories as per specification for 01 Nos of Cold Room with 10 MT capacity (Dimenssion - 5.0x3.0x3.5 mtr) , 04 Nos Ripening Chmber with 10 MT capacity (Dimenssion - 5.0x3.3x3.5). Make - Lloyd insulation, Sintex, Rinac, Jindal, BNAL (PUF Panel Thickness Cold Room- 80 mm (walls) 100mm (ceiling)\nAnteChamber-80mm(walls&ceiling)\nb) Density- 40 +/- 2 Kg/M3\nc) Closed cell content - 90 - 95%\nd) Thermal Conductivity - 0.023 W/mK\ne) Compressive Strength - 2.1 kg/ m2 (at 10% deformation)\nf) Water Vapour Permeability - 0.8 -.12 gms/hr m2\ng) Fire Resistance - Self extinguishing\nh) Blowing Agent - CFC Free\ni) Sheet - 0.5 mm TCT, PPGI)\nitem91Nos
111.1Supply and fixing of Cold Room Floor with, Insulation Material- PUF slab of 80mm thickness( in 2 layers of 40 mm each), Vapour Barrier, inclusive of all accessories as per specification. Make - Lloyd Insulation, Sintex, Rinac, Jindal, Industrial Foam. (a) Insulation Material - PUF slab\n b) Density - 40 +/- 2 Kg/M3\nc) No. of Layers - 2 layers ( 40 mm each)\nd) Total Thickness - 80 mm\ne) Vapor Barrier - Tarfelt, Polythene Sheet as per dwg\nf) VDF floor - VDF as per dwg)\nitem101Nos
121.11Supply and Installation of Cold Room Doors (for positive temp) insulated (hinge type), Dimensions -1200 mm x 2100mm ( clear) with Sandwich panels constructed of a core of 80 mm PUF complete with all accessories as per specification Make - Metaflex, lloyd insulation, Rinac, Hormann \n(a) Type of Door - Hinge Swing Door\nb) Dimensions - 1200 X 2100MM\nc) Type of panel - Sandwich panels constructed of a core of 80 mm PUF on both sides covered with 0.6mm galvanized steel plate finished with 20mucoating. The panels are supplied with thermal bridge-free PVC surrounding profiles \nd) Sealing - All round with triple rubber profile\ne) Colour outside - RAL 9002 (white)\nf) Colour inside - Standard colour RAL 9002 (white/grey)\ng) Hardware - Galvanised Steel\nh) Track Rail - Drop/Lift rail system\ni) Finish of opening - To be Included\nj) Door Operation - Manual)item111Nos
131.12Supply, Installation, Testing, Commissioning of Refrigeration system of suitable capacity (reference capacity 6.98 kw for each room) complete with all spares as per specification for each of 4 nos cold rooms Make -Carrier, Rinac, Blue Star, Voltas \n(1) Design Temp.: Evaporation-5 DegC, Condensing 54Deg.C\n(2) Compressor (Scroll) of required capacity with air Cooled Condenser. Desired air Volume 12625 M3/HR, Fans to be controlled by temp. contrller, Suction 15/8”, Liquid 7/8”. (Makes- Carrier/rinac/blue Stra/ Voltas)\n(3) Coolers of required capacity (1 Per Cold Room. with 3/4 axil Fans of 450mm/500mm, Fin spacing 4 Fin/ SQ. Inch. Desired air Volume 12625 M3/Hr ((Makes – Luve/Patton//Guniner/Star Cooler)\n(4) Controls, Thermostat, Solnoid Vaove, Sight glass\n(5) Controls Panel for each Cold room (PLC Controls Type) to have Following Featuress – Starting arrangment for Compressor (HP/LP/OP Cut cut for each Compressor) Contractor for Condenser Fan, Thermostatic controller from Danfoss for Controlling the fan, Crank case heater to operate when compressor is Stopped & off When Running. Lighting Main Switch also in the pppanel. This will be have all Staters with interloking system. Push Buttans for Start/Stop. Humidifier & Ethylene Scrubber Switches also in the Panel .Overload relays & Fuses, Name Plates, Complete cabling from LT Panel for the Refrigeration system.item121Nos
141.13Supply, Installation, Testing & Commissioning of Ultrasonic type humidification system in all Ripening rooms with automated controls capable of providing 90 - 95% RH in each room to ensure uniform humidity in the room, system should be complete with RH control sensor and digital display for monitoring and control of RH in each room, , complete with all connections in all rooms as per specification - The humidification system offered should be ltrasonic type humidification system in all Ripening rooms with automated controls capable of providing 90 - 95% RH in each cold room to ensure uniform humidity in the room, system should be complete with RH control sensor and digital display for monitoring and control of RH in each room, complete with all connections in all rooms as per specificationitem131Nos
151.14Supply, Installation, Testing & Commissioning of Ethylene Scrubber system in each Cold Room to allow for mixed storage of fruits and vegetables to protect product quality during storage due to ethylene, system should be suitable for cold room with panel counter for energy consumed, programmable hours of operation etc in each of cold rooms as per specification Make- Bioconservacion, Miatech, Ethylene Control (Air purification and ethylene scrubber system should be installed in each Cold Room to allow for mixed storage of fruits and vegetables to protect product quality during storage due to ethylene and airborne pathogens. The system should be suitable for cold room with use of specialized granules for air filtration, airborne pathogen and ethylene removal system.)item141Nos
161.15Supply, Installation, Testing, Commissioning of Refrigeration System of suitable capacity (reference capacity 10.00 kw for each room) complete with all spares as per specification for each of 4 nos ripening rooms. Make - Carrier, Rinac, Blue Star, Voltas \n(1. Design Temp.: Evaporator-5 deg C, Condensing 53.5 Deg C\n2. Compressor – Semi Hermatic (1 Per Ripening Room)\n3. Air Cooled Condenser, Air Volume 4500 M3/Hr, 10 Fins/Inch, 1 Axial\nFan to be Controlled by Thermostatics control unit with outside Temp. sensing arrangment. typical dimensions:: 1000mm (Lengh) X\n837mm (Height) X 672mm (Depth) (Makes- Carrier/Bitzer/Bock/Frascold\n4. Doal discharge cooler of capacity 11KW ( 1 Per Ripening Room. with 5 Axial Fans of 450mm air volume 5250 M3/Hr, Fin spacing 5 Fin/Sq. Inch Typical Dimensions: 2500mm (Length) Height of Individual coil 325mm \n(Makes–Luve/AlfaLaval/Guniner/Starcoolers.\n5. Ventilation Fan 15”, \n6. Controls , Dryer, Thermostate, Thermostatic Expansion Valve, Solenoid Volve, sight Glass\n7. Senser & allied Equipment per room -Ethylene senser (1), CO2 Senser (1), Pulp Temp. (1), Ventilation system connected to Damper & Ventillation Fan (1 Each)\n8. Piping – Suction 11/8” & Liquid Line ½” with insulation\n9. Control Panel for each room atrear side of Ripening Room\n10. Control Panel (PLC Control type) to have Following Features–\nStarting arrangement fon Compressor (HP/LP/OP Cut for each\nCompressor Contractor for condenser Fan, Thermosttic\nController from danfoss for controlling the Fan, Crankcase Heater to operate when Compressor is Stoped & off when Running. lighting main switch also in the Panel. This will have all starters with Interlocking system. Push Buttans for Start//Stop. Humidifier & Ethylene Genrator switches also in the Panel.\nOverload Relays & Fuses and Name Platesitem151Nos
171.16Supply, Installation, Testing, Commissioning of Refrigeration System of suitable capacity (reference capacity 16.00 kw for each room) complete with all spares as per specification for each of 4 nos ripening rooms. Make - Carrier, Rinac, Blue Star, Voltas \n(1. Design Temp.: Evaporator-5 deg C, Condensing 53.5 Deg C\n2. Compressor – Semi Hermatic (1 Per Ripening Room)\n3. Air Cooled Condenser, Air Volume 4500 M3/Hr, 10 Fins/Inch, 1 Axial\nFan to be Controlled by Thermostatics control unit with outside Temp. sensing arrangment. typical dimensions:: 1000mm (Lengh) X\n837mm (Height) X 672mm (Depth) (Makes- Carrier/Bitzer/Bock/Frascold\n4. Doal discharge cooler of capacity 11KW ( 1 Per Ripening Room. with 5 Axial Fans of 450mm air volume 5250 M3/Hr, Fin spacing 5 Fin/Sq. Inch Typical Dimensions: 2500mm (Length) Height of Individual coil 325mm \n(Makes–Luve/AlfaLaval/Guniner/Starcoolers.\n5. Ventilation Fan 15”, \n6. Controls , Dryer, Thermostate, Thermostatic Expansion Valve, Solenoid Volve, sight Glass\n7. Senser & allied Equipment per room -Ethylene senser (1), CO2 Senser (1), Pulp Temp. (1), Ventilation system connected to Damper & Ventillation Fan (1 Each)\n8. Piping – Suction 11/8” & Liquid Line ½” with insulation\n9. Control Panel for each room atrear side of Ripening Room\n10. Control Panel (PLC Control type) to have Following Features–\nStarting arrangement fon Compressor (HP/LP/OP Cut for each\nCompressor Contractor for condenser Fan, Thermosttic\nController from danfoss for controlling the Fan, Crankcase Heater to operate when Compressor is Stoped & off when Running. lighting main switch also in the Panel. This will have all starters with Interlocking system. Push Buttans for Start//Stop. Humidifier & Ethylene Genrator switches also in the Panel.\nOverload Relays & Fuses and Name Platesitem161Nos
181.17Supply, Installation, Testing & Commissioning of Ultrasonic type humidification system in all Ripening rooms with automated controls capable of providing 90 - 95% RH in each cold room to ensure uniform humidity in the room, system should be complete with RH control sensor and digital display for monitoring and control of RH in each room, complete with all connections in all rooms as per specification - The humidification system offered should be Ultrasonic type humidification system in all Ripening rooms with automated controls capable of providing 90 - 95% RH in each room to ensure uniform humidity in the room, system should be complete with RH control sensor and digital display for monitoring and control of RH in each room, , complete with all connections in all rooms as per specification.item171Nos
191.18Supply, Installation, Testing and Commissioning of Portable Ethylene Generator connected to an electrical plug point inside the room, the Ethylene Generator should be suitable for providing suitable levels of ethylene (as per the fruit category) in ripening rooms of volume around 60 cum by catalytic dehydration of developing liquid into ethylene gas complete with suitable developing liquid required for commercial ripening applications for each of the ripening rooms as per specification alongwith 50 ltr of developing liquid ethylene with each generator. Make- Aseko, Catalytic, American Ripener (The provision for Ethylene Gas dosage for ripening in each room shall be by placing a Portable Ethylene Generator connected to an electrical plug point inside the room. The Ethylene Generator should be suitable for providing suitable levels of ethylene (as per the fruit category) in ripening rooms of volume around 58 cum by catalytic dehydration of developing liquid into ethylene gas complete with suitable developing liquid required for commercial ripening applications.)item181Nos
201.19Supply, Installation, Testing and Commissioning of Ethylene Gas sensor complete with display in all 4 Ripening Rooms of catalytic type with measuring range upto 2000 ppm for ripening room application as per specification. Make- Aseko, Carelitem191Nos
211.2Supply, Installation, Testing and Commissioning of CO2 gas sensors complete with display in all 4 Ripening Rooms of infrared type with measuring range 0 – 5% suitable for ripening application as per specification. Make- Aseko, Carelitem201Nos
221.21Supply, Installation, Testing and Commissioning of Air Ventilation Systems connected with gas control system for all Ripening Rooms suitable for ripening application as per specificationitem211Nos
231.22Supply, Installation, Testing and Commissioning of Ripening Controller system for integration and control of all ripening activities suitable for minimum 4 ripening rooms with display & all accessories (Make: Aseko, Interko, Felix)item221Nos
241.23Supply and fixing of PUF Insulation panel of thickness of 40 mm having Density 40 kg/cu.m (+/- 2), 0.5 mm thick PPGI sheet, thermal conductivity [ 0.023 W/mK], for ceiling at loading, unloading and Admin area (3.5 mtr. Hight from floor level) inclusive of all accessories and installation as per specification. Make - Lloyd Insulation, Sintex, Rinac, Jindalitem231Sqmm.
251.24Supply, Installation, Testing and Commissioning of Platform weighscale of electronic digital type of 200 kg capacity as per specifications Make - Kantawala, Swastik, Dewlite, Avery \n(a) Capacity 200 Kg\nb) Pan Size & MOC 400mm X 500mm minimum (of SS) for 200 kg\ne) Least Count 20 gm maximum for 200 kg \nh) 100% Tare through Keyboard\ni) Stamping to be provided)item241Nos
261.25Supply, Installation, Testing and Commissioning of Plastic crates of outer dimensions 540mm x 360mm x 290mm (48 ltr capacity) for storage of around 20 kg vegetables (side perforated type) made of HDPE 100% virgin material as per specificationsitem251Nos
271.26Supply, Installation, Testing and Commissioning of hand pallet truck with 2500 kg lifting capacity as per specification Make - Godrej, Voltas, Mahindra, Jay, Maini \n(a) Load Capacity : 2500 mm\nb) Fork Length : 1100 mm\nc) Fork Width : 150 mm\nd) Out Side Fork Spread : 550 mm\ne) Inside Fork Spread : 250 mm\nf) Maximum Fork Height : 185 mm\ng) Minimum Fork Height : 75 mm)item261Nos
281.27Providing preventive maintenance, repair, replacement for all equipment for a period of 4 years after warranty prioditem271Nos
291.28Providing unskilled skilled manpower in two shifts for the Management of proposed cold room and ripening facility. The agency will be resposible for the management of facility in terms of secuerity, cleaning, accounting and etc for the first year.item281Job
301.29Providing unskilled skilled manpower in two shifts for the Management of proposed cold room and ripening facility. The agency will be resposible for the management of facility in terms of secuerity, cleaning, accounting and etc for the 2nd year at the 15% incremental cost from previous year.item291Job
311.3Providing unskilled skilled manpower in two shifts for the Management of proposed cold room and ripening facility. The agency will be resposible for the management of facility in terms of secuerity, cleaning, accounting and etc for the 3rd year at the 15% incremental cost from previous year.item301Job
321.31Providing unskilled skilled manpower in two shifts for the Management of proposed cold room and ripening facility. The agency will be resposible for the management of facility in terms of secuerity, cleaning, accounting and etc for the 4th year at the 15% incremental cost from previous year.item311Job
331.32Providing unskilled skilled manpower in two shifts for the Management of proposed cold room and ripening facility. The agency will be resposible for the management of facility in terms of secuerity, cleaning, accounting and etc for the 5th year at the 15% incremental cost from previous year.item321Job
341.33Providing unskilled skilled manpower in two shifts for the Management of proposed cold room and ripening facility. The agency will be resposible for the operation of facility in terms of secuerity, cleaning, accounting and etc for the first year.item331Job
351.34Providing unskilled skilled manpower in two shifts for the Management of proposed cold room and ripening facility. The agency will be resposible for the operation of facility in terms of secuerity, cleaning, accounting and etc for the 2nd year at the 15% incremental cost from previous year.item341Job
361.35Providing unskilled skilled manpower in two shifts for the Management of proposed cold room and ripening facility. The agency will be resposible for the operation of facility in terms of secuerity, cleaning, accounting and etc for the 3rd year at the 15% incremental cost from previous year.item351Job
371.36Providing unskilled skilled manpower in two shifts for the Management of proposed cold room and ripening facility. The agency will be resposible for the operation of facility in terms of secuerity, cleaning, accounting and etc for the 4th year at the 15% incremental cost from previous year.item361Job
381.37Providing unskilled skilled manpower in two shifts for the Management of proposed cold room and ripening facility. The agency will be resposible for the operation of facility in terms of secuerity, cleaning, accounting and etc for the 5th year at the 15% incremental cost from previous year.item371Job

AI Tender Summary

OUR REF NO 24095793
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 08-04-2020
Authority
Authority Name Rajya Krishi Utpadan Mandi Parishad
Work Description Electrical Non Schedule Item For Cold Room And Ripening Room And Its Related Works .
Basic Detail
Tender No E/M/325/2020-2034
Bidding Type Tender
Location
City Kisan Mandi Bhawan, Vibhuti Khand, Gomti Nagar lko
State Uttar Pradesh
Key Dates
Publish Date 20 Mar 2020
Submission Date 08 Apr 2020
Open Date 09 Apr 2020
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
33F2EA11-C6FF-4ACD-949C-765F8275EC32.html
Tendernotice_1.pdf
BOQ_673189.xls
cooledripe.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 20, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 08, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 09, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

33F2EA11-C6FF-4ACD-949C-765F8275EC32.html

pdf

Tendernotice_1.pdf

xls

BOQ_673189.xls

pdf

cooledripe.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders