Providing Of Design , Detailed Design , Drawings , Model Testing , Vibration Analysis And Technical Assistance For Construction , Tests And Trials Of 3 Nos . 7 . 5T Static Ahead Bollard Pull Tug Boats
Tender Overview
Project Description
Providing Of Design , Detailed Design , Drawings , Model Testing , Vibration Analysis And Technical Assistance For Construction , Tests And Trials Of 3 Nos . 7 . 5T Static Ahead Bollard Pull Tug Boats , Design For Construction Of 3 Nos . 7 . 5T Static Ahead Bollard Pull Tug Boats As Per Gsl Ta Gsl/Ges/7 . 5Tbpt/Ta/G-1 Dated: 19-03-2020 . , Detailed Design And Production Drawing For Construction Of 3 Nos . 7 . 5T Static Ahead Bollard Pull Tug Boats As Per Gsl Ta Gsl/Ges/7 . 5Tbpt/Ta/G-1 Dated: 19-03-2020 . , Model Testing For Construction Of 3 Nos . 7 . 5T Static Ahead Bollard Pull Tug Boats As Per Gsl Ta Gsl/Ges/7 . 5Tbpt/Ta/G-1 Dated: 19-03-2020 . , Free And Forces Vibration Prediction Analysis And Solutions For Construction Of 3 Nos . 7 . 5T Static Ahead Bollard Pull Tug Boats As Per Gsl Ta Gsl/Ges/7 . 5Tbpt/Ta/G-1 Dated: 19-03-2020 . ( Optional ) , Visiting Charges For Designer Or Authorised Technical Representative For Total 9 Visits ( Each Visit Of 3 Days ) As Per Gsl Ta Gsl/Ges/7 . 5Tbpt/Ta/G-1 , Clause No 4 . 7
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 02-Apr-2020 | Date corrigendum | Date | 23-Apr-2020 |
| 2 | 22-Apr-2020 | Dateextension | Date | 11-May-2020 |
| 3 | 26-Apr-2020 | Clarification | Other | 11-May-2020 |
BOQ
| Scope of supply: Providing of Design, Detailed Design, Drawings, Model Testing, Vibration Analysis and Technical assistance for Construction, Tests & trials of 3 Nos. 7.5T Static Ahead Bollard Pull Tug Boats | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code/ Make | Qty | UOM | |
| 1 | 1 | Design for Construction of 3 Nos. 7.5T Static Ahead Bollard Pull Tug Boats as per GSL TA GSL/GES/7.5TBPT/TA/G-1 Dated: 19-03-2020. | Item 1 | 1 | No |
| 2 | 2 | Detailed Design and production Drawing for Construction of 3 Nos. 7.5T Static Ahead Bollard Pull Tug Boats as per GSL TA GSL/GES/7.5TBPT/TA/G-1 Dated: 19-03-2020. | Item 2 | 1 | No |
| 3 | 3 | Model Testing for Construction of 3 Nos. 7.5T Static Ahead Bollard Pull Tug Boats as per GSL TA GSL/GES/7.5TBPT/TA/G-1 Dated: 19-03-2020. | Item 3 | 1 | No |
| 4 | 4 | Free and Forces Vibration Prediction Analysis and solutions for Construction of 3 Nos. 7.5T Static Ahead Bollard Pull Tug Boats as per GSL TA GSL/GES/7.5TBPT/TA/G-1 Dated: 19-03-2020. (optional) | Item 4 | 1 | No |
| 5 | 5 | Visiting Charges for Designer or authorised technical representative for total 9 visits (each visit of 3 days) as per GSL TA GSL/GES/7.5TBPT/TA/G-1, Clause no 4.7 | Item 5 | 9 | Visits |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents