Ministry Of Road Transport And Highways has published Consultancy Services For Preparation Of Feasibility Study And Dpr For Construction Of Vup In The State Of Punjab On Bot/Epc/Hybrid Annuity Mode Near Bibi Wala Chowk For The T-Junction With Bypass/Ring Road On The Road Section Of Nh-07 , Bathinda. Submission Date for this Tender is 15-05-2020. Feasibility Studies Tenders in Bathinda Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 02-Apr-2020 | Revised Dates | Date | 15-05-2020 |
Name of Work: Consultancy Services for preparation of Feasibility Study and Detailed Project Report for construction of VUP in the state of Punjab on BOT/EPC/Hybrid Annuity Mode near Bibi Wala Chowk for the T-Junction with bypass/ring road on the road section of NH-07, Bathinda. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Remuneration for Local Professional Staff key personnel | |||
2 | 1.01 | :Professional Staff | |||
3 | 1.02 | Team Leader Cum Senior Bridge Engineer | item3 | 1 | Nos. |
4 | 1.03 | Material-cum-Geotechnical Engineer-Gerlogist | item4 | 1 | Nos. |
5 | 1.04 | Senior Survery Enginer | item5 | 1 | Nos. |
6 | 1.05 | Traffic and Safety Expert | item7 | 1 | Nos. |
7 | 1.06 | Quantity Surveyor / Documentation Expert | item8 | 1 | Nos. |
8 | 2 | Support Staff | |||
9 | 2.1 | Office Manager | item12 | 1 | Nos. |
10 | 2.2 | Typist | item13 | 1 | Nos. |
11 | 2.3 | Office Boy | item14 | 1 | Nos. |
12 | 3 | Transportation (Fixed costs)\n \nThe vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. | |||
13 | 3.1 | For Use of Consultants | item16 | 1 | Nos. |
14 | 4 | Duty Travel to Site (Fixed Costs): \n\nTrips | item17 | 1 | Nos. |
15 | 5 | Office Rent (Fixed Costs)\n\nThe rent cost includes, maintenance, Cleaning, repairs, etc. | |||
16 | 5.1 | 2 Months x_ | item18 | 1 | Nos. |
17 | 6 | Office Supplies, Utilities and Communication (Fixed Costs) | |||
18 | 6.1 | Office Supplies Drafting | item19 | 1 | Nos. |
19 | 6.2 | Supplies Computer | item20 | 1 | Nos. |
20 | 6.3 | Running Costs | item21 | 1 | Nos. |
21 | 6.4 | Domestic and International Communication | item22 | 1 | Nos. |
22 | 7 | Office Furniture and Equipment (Rental) | |||
23 | 7.01 | Office Furniture and Equipment (Rental) | item23 | 1 | Nos. |
24 | 8 | Reports and Document Printing | |||
25 | 8.01 | Monthly reports (3 Copies per Month) | item24 | 3 | Per Months |
26 | 8.02 | Inception Report & QAP | item25 | 3 | Per Months |
27 | 8.03 | Environment and Social Impact Screening Report | item26 | 4 | Per Months |
28 | 8.04 | Draft Feasibility Report | item27 | 4 | Per Months |
29 | 8.05 | Final Feasibility Report | item28 | 6 | Per Months |
30 | 8.06 | Draft Environmental Assessment Report and RAP | item29 | 4 | Per Months |
31 | 8.07 | Final Environment Assessment Report and RAP | item30 | 6 | Per Months |
32 | 8.08 | Draft Detailed Design Report and Drawings etc. | item31 | 4 | Per Months |
33 | 8.09 | Draft EMP | item32 | 4 | Per Months |
34 | 8.1 | Draft Bidding Documents | item33 | 4 | Per Months |
35 | 8.11 | Final Detailed Project Report with Bill of Quantitieis, Cost Estimates, Updated Drawings etc. | item34 | 6 | Per Months |
36 | 8.12 | Final EMP | item35 | 6 | Per Months |
37 | 8.13 | Final Bidding Documents | item36 | 6 | Per Months |
38 | 9 | Survey and Investigation\n(A) Topographical Survey (Fixed Rate) | |||
39 | 9.1 | Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer | item42 | 3 | Km |
40 | 9.2 | Detailed topographic surveys using mobile / aerial LiDAR or equivalent technology. | item43 | 3 | Km |
41 | 10 | Investigation (Fixed Cost) | |||
42 | 10.01 | Road and Bridge Inventory | item44 | 1 | Nos. |
43 | 10.02 | BBD Test and Pavement Evaluation | item45 | 1 | Nos. |
44 | 10.03 | Axle Load Survey | item46 | 1 | Nos. |
45 | 10.04 | Material Survery and Investigation | item47 | 1 | Nos. |
46 | 10.05 | Sub-grade Investigation | item48 | 1 | Nos. |
47 | 10.06 | Traffic Survey | item49 | 1 | Nos. |
48 | 10.07 | Socio-economic & Census Survey/Studies | item50 | 1 | Nos. |
49 | 10.08 | Any other investigations/Surveys | item51 | 1 | Nos. |
50 | 11 | Sub-Soil Investigation (Boring) | |||
51 | 11.1 | Boring in all type of soils (other than hard rock) | item54 | 1500 | Mtr. |
52 | 12 | Total | |||
53 | 13 | Bid GST in Percentage (%) | item56 | 1 | Nos. |