Consultancy Services For Preparation Of Feasibility Study And Dpr For Construction Of Vup In The State Of Punjab On Bot/Epc/Hybrid Annuity Mode Near Bibi Wala Chowk For The T-Junction With Bypass/Ring Road On The Road Section Of Nh-07 , Bathinda , Remuneration For Local Professional Staff Key Personnel , :Professional Staff , Team Leader Cum Senior Bridge Engineer , Material-Cum-Geotechnical Engineer-Gerlogist , Senior Survery Enginer , Traffic And Safety Expert , Quantity Surveyor / Documentation Expert , Support Staff , Office Manager , Typist , Office Boy , Transportation ( Fixed Costs ) The Vehicles Provided By The Consultants Shall Include The Cost For Rental , Drivers , Operation , Maintenance , Repairs , Insurance , Etc . , For Use Of Consultants , Duty Travel To Site ( Fixed Costs ) : Trips , Office Rent ( Fixed Costs ) The Rent Cost Includes , Maintenance , Cleaning , Repairs , Etc . , 2 Months X_ , Office Supplies , Utilities And Communication ( Fixed Costs ) , Office Supplies Drafting , Supplies Computer , Running Costs , Domestic And International Communication , Office Furniture And Equipment ( Rental ) , Office Furniture And Equipment ( Rental ) , Reports And Document Printing , Monthly Reports ( 3 Copies Per Month ) , Inception Report & Qap , Environment And Social Impact Screening Report , Draft Feasibility Report , Final Feasibility Report , Draft Environmental Assessment Report And Rap , Final Environment Assessment Report And Rap , Draft Detailed Design Report And Drawings Etc . , Draft Emp , Draft Bidding Documents , Final Detailed Project Report With Bill Of Quantitieis , Cost Estimates , Updated Drawings Etc . , Final Emp , Final Bidding Documents , Survey And Investigation ( A ) Topographical Survey ( Fixed Rate ) , Topographic Survey Including Hire Charges For Equipment And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc . Inclusive Of Cost Of Materials , Labourer , Detailed Topographic Surveys Using Mobile / Aerial Lidar Or Equivalent Technology . , Investigation ( Fixed Cost ) , Road And Bridge Inventory , Bbd Test And Pavement Evaluation , Axle Load Survey , Material Survery And Investigation , Sub-Grade Investigation , Traffic Survey , Socio-Economic & Census Survey/Studies , Any Other Investigations/Surveys , Sub-Soil Investigation ( Boring ) , Boring In All Type Of Soils ( Other Than Hard Rock ) , Total , Bid Gst In Percentage ( % )