Repair And Maintenance To Pneumatic Tool Air Compressor And Its Connected Items At Af Stn Chakeri Kanpur, GE (AF) E/M CHAKERI KANPUR-Uttar Pradesh

Military Engineer Services-MES has published Repair And Maintenance To Pneumatic Tool Air Compressor And Its Connected Items At Af Stn Chakeri Kanpur. Submission Date for this Tender is 30-03-2020. Air Compressor Tenders in GE (AF) E/M CHAKERI KANPUR Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

24069986
Repair And Maintenance To Pneumatic Tool Air Compressor And Its Connected Items At Af Stn Chakeri Kanpur
Open Tender
Indian
Uttar Pradesh
GE (AF) E/M CHAKERI KANPUR
30-03-2020

Tender Details

Repair And Maintenance To Pneumatic Tool Air Compressor And Its Connected Items At Af Stn Chakeri Kanpur

Key Value

Document Fees
INR 500 /-
EMD
INR 45000.0 /-
Tender Value
INR 22.50 Lakhs /-

BOQ Items

Name of Work: REPAIR AND MAINT TO PNEUMATIC TOOL AIR COMPRESSOR AND ITS CONNECTED ITEMS AT AF STN CHAKERI, KANPUR
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Quarterly inspection & servicing of the complete air compressor of following capacity installed at different loc Make Atlas Copco \n(i) Preventive Maintenance Visits: Technicians shall visit once in three months (OIT) i.e.in all a total of 4 man-days shall be spent on preventive maintenance.\n(ii) Overhauling: Technicians shall provide one visit of three working days during the contract period for overhauling of the unit. During this visit minimum two technicians deputed for\ncarrying out complete yearly scheduled maintenance once in a year.\n(iii) Service Calls: Apart from the above, in case of any breakdown or any other service required, engineer/ technician with in 24 hrs. From receiving such call at our end except on national/ festival holidays. Such special services can availed two times during the year i.e. in all a total of 2 breakdown/ other service visits are included in the contract.\n(iv) Scope of Work: Scope of work shall be as per Annexure –I of this offer. \nNotes:-\n1: The inspection & servicing shall be carried out by respective OEM only. Contractor has to submit necessary AMC documents with OEM to Garrison Engineer alongwith performance security as required in terms of condition 46 of IAFW-2249. On account of non-submission of necessary documents of AMC with OEM alongwith performance security, the contract is liable to be cancelled.\n2. The rates quoted shall also include the attending of emergency breakdowns in Air Compressor plants. If such emergency breakdowns are not attended in time, following compensation shall be levied from the contractor's dues:\na) Attending breakdown within 72 hours - Rs Nils\nb) Attending breakdown within 3 to 7 days - Rs 10000 per breakdown.\nc) Attending breakdown after 7 days - Rs 25000 per breakdown.\n3. Spare parts required shall be measured & paid separately under relevant items based on their consumption on ground (refer srl item Nos 2.00 to 4.13).
2 1.01 Model No GA-55VSD-FFA-12.75 at TTCLE Hanger Compressor No-01 4 Quarterly
3 1.02 Model No GA-55VSD-FFA-12.75 at TTCLE Hanger Compressor No-02 4 Quarterly
4 1.03 Model No GA-55VSD-FFA-12.75 at Hanger No-02 Compressor No-01 4 Quarterly
5 1.04 Model No GA-55VSD-FFA-12.75 at Hanger No-02 Compressor No-02 4 Quarterly
6 1.05 Model No GAe-55-AP-13 - 01 No at ETH 4 Quarterly
7 1.06 GAE-22-P-7.5 - 01 No at New EP shop 4 Quarterly
8 2 Supply & fix following Spare parts in replacement for running of the Air Compressor plants of Model GA-55 VSD-FFA-12.75 complete all as specified and directed:-\n\nAir filter element 4 Each
9 2.01 Safety cartridge 4 Each
10 2.02 Oil filter spare 8000 Hrs 4 Each
11 2.03 Air/Oil filter Kit C-90 RXD 4 Each
12 2.04 Oil separator kit GA 37±55 4 Each
13 2.05 Oil RS ultra 110 Litre
14 2.06 MPV.KIT 4 RM
15 2.07 THERM.VALVE 75C KIT 2 Each
16 2.08 INLET VALVE KIT 2 Each
17 2.09 SOLENOID VALVE 50-60HZ VSD 2 Each
18 2.1 AC CONTACTOR(110V,50HZ,1NO,6A) 2 Each
19 2.11 MOTOR PROTECTION C.B. (4-6.3A) 2 Set of three
20 2.12 THERMIC, GZ1E08 2 Set of three
21 2.13 EMERGENCY STOP 2 Each
22 2.14 CONTACT BLOCK (NC) 1 Each Job
23 2.15 TRANSFORMER 415V/110V-250VA + 2 Each
24 2.16 TRANSFORMER 230V/24V - 30VA 2 each
25 2.17 PRESSURE SWITCH 2 RM
26 2.18 FILTER DRYER 2 RM
27 3 Supply & fix following Spare parts in replacement for running of the Air Compressor plants of Model GAe-55 A pack 13 Bar complete all as specified and directed:-\n\nMPV.KIT 1 Each
28 3.01 OIL SEPARATOR KIT GA37+-55 1 Each
29 3.02 AIR HOSE 1 Each
30 3.03 HOSE ASSEMBLY 1 Each
31 3.04 PIPE 1 Each
32 3.05 O-RING 59.5X3 1 Each
33 3.06 SOLENOID VALVE 110/50 1 Each
34 3.07 SAFETY VALVE 14,5 BAR 1 Each
35 3.08 THERMOSTAT KIT 60ºC 1 Each
36 3.09 SERVICE KIT WSD25-40 1 Each
37 3.1 PRESS.TRANSDUCER 1 Each
38 3.11 CONTACTOR 1 Each
39 3.12 THERMAL OLR 1 Each
40 3.13 EMERGENCY STOP 1 Each
41 3.14 FILTER ELEMENT 1 Each
42 3.15 FILTER OIL 1 Each
43 3.16 Filter kit GAe55,GAe75 1 Each
44 4 Supply & fix following Spare parts in replacement for running of the Air Compressor plants of Model GAe-22 complete all as specified and directed:-\n\nAIR FILTER 1 Each
45 4.01 FILTER OIL 1 Each
46 4.02 SEPARATOR OIL SPARE PART 1 Each
47 4.03 OIL RS ULTRA 20 Litre
48 4.04 ELBOW AIR INLET 1 Each
49 4.05 SOLENOID VALVE 110/50 1 Each
50 4.06 THERMOSTAT KIT 60ºC 1 Each
51 4.07 O-RING 32.15X3.53 1 Each
52 4.08 VALVE SAFETY 1 Each
53 4.09 SHAFT SEAL KIT GA11-30C / 1 Each
54 4.1 O-RING 1 Each
55 4.11 SENSOR 1 Each
56 4.12 MOTOR SERVICE KIT FOR GA11-22 1 Each
57 4.13 RELAY PHASE SEQ. 1 Each
58 5 M&L for scrapping out existing old paint and applying one coat synthetic enamel blue shade paint over a coat of red oxide primer on exposed surfaces to existing MS iron pipe 50mm dia in any height in hanger/wall over ground complete all as specified and directed. 225 RM
59 6 M&L for scrapping out existing old paint and applying one coat synthetic enamel blue shade paint over a coat of red oxide primer on exposed surfaces to existing MS pipe 40 mm dia in any height in hanger/wall over ground complete all as specified and directed. 195 RM
60 7 M&L for scrapping out existing old paint and applying one coat synthetic enamel blue shade paint over a coat of red oxide primer on exposed surfaces to existing MS pipe 25 mm dia in any height in hanger/wall over ground complete all as specified and directed. 270 RM
61 8 M&L for scrapping out existing old paint and applying one coat synthetic enamel blue shade paint over a coat of red oxide primer on exposed surfaces to existing MS pipe 15mm dia in any height in hanger/wall over ground complete all as specified and directed. 190 RM
62 9 S&F in replacement of TPN MCB 63 Amps, 10 KA, 415 Volts complete all as specified and directed. 10 Each
63 10 S&F in replacement of single phase preventer relay VSP-2 415 V AC complete all as specified and directed.\n 5 Each
64 11 S&F in replacement of electronic timer type ST-100,12-120 sec 415 volts complete all as specified and directed.\n 3 Each
65 12 S&F in replacement of over load relay suitable for ML3/ML4 (L&T series) complete all as specified and directed. 6 Each Job
66 13 S&F in replacement of 3 Pole power contactor type MNX 18 with auxiliary contact of L&T Make for 3 phase and 3 HP motor complete all as specified and directed. 6 Each Job
67 14 S&F in replacement of 3 Pole power contactor type ML3 suitable for 3 phase motor complete all as specified and directed. 3 Each Job
68 15 S&F in replacement of 3 Pole power contactor type ML4 suitable for 3 phase motor complete all as specified and directed. 2 Each Job
69 16 S&F in replacement of 3 Pole power contactor type ML6 suitable for 3 phase motor complete all as specified and directed. 1 Each Job
70 17 S&F in replacement of DOL starter type MK-1 including making electrical connection complete all as specified and directed. 4 Each job
71 18 Repair & Maintenance of LT Panel board by taking shut down, removing of carbon particles, rubbing of heated portion of bus bar and cleaning complete by means of CRC-226/Petrol tightening of all joints in bus bar, checking of earth and neutral voltage and make a record, replacement of u/s nuts/bolts/washers including replacement of corroded glands, lugs/ thimbles and tightening them properly complete all as specified and directed.\nNote:- Replacement of major items like contractor, MCCB,single phase preventer etc. shall be measured and paid separately under relevant items 4 Each Job
72 19 S&F in replacement of MCCB type thermal magnetic release four pole 3 phase 415 volts capacity 250 Amps,36 KA including taking down UNSV MCCB from existing location complete all as specified and directed.\nMake:- L&T/Legrand/HPL 2 Each
73 20 S&F in replacement of MCCB type thermal magnetic release four pole 3 phase 415 volts capacity 100 Amps,16 KA including taking down UNSV MCCB from existing location complete all as specified and directed.\nMake:- L&T/Legrand/HPL 3 Each
74 21 S&F in replacement of Digital ammeter flush type 96X96 sqmm, 5A class 1 with suitable fixing arrangement and CT coil for easily fixing in existing LT panel including necessary wiring complete all as specified and directed. 2 Each
75 22 S&F in replacement of Digital voltmeter flush type 96X96 sqmm with suitable fixing arrangement for easily fixing in existing LT panel including necessary wiring complete all as specified and directed. 2 Each
76 23 S&F in replacement of Indicator lamp assembly LED type (RYB) in existing LT panel with suitable wiring complete all as specified and directed. 10 Set of three
77 24 Dismantling of existing electric motor (3 phase 440 volt, squirrel case, slip ring/induction motor) form foundation and disconnecting from electrically and mechanically from air compressor coupling. Taking out the motor from starter strip re-winding by using appropriate supper quality copper winding wire of suitable guage including varnishing, bearing as per sample and insulation paper all complete of capacity 100 HP electric motor and reconnection after rewinding complete all as specified and directed. 1 Each job
78 25 Dismantling of existing electric motor (3 phase 440 volt, squirrel case, slip ring/induction motor) form foundation and disconnecting from electrically and mechanically from air compressor coupling. Taking out the motor from starter strip re-winding by using appropriate supper quality copper winding wire of suitable guage including varnishing, bearing as per sample and insulation paper all complete of capacity 50 HP electric motor and reconnection after rewinding complete all as specified and directed. 1 Each job
79 26 Dismantling of existing electric motor and mono block pump (3 phase 440 volt, squirrel case, slip ring/induction motor) form foundation and disconnecting from electrically and mechanically from foundation. Taking out the motor from starter strip re-winding by using appropriate supper quality copper winding wire of suitable guage including varnishing, bearing as per sample and insulation paper all complete of capacity 3 HP electric motor and reconnection after rewinding complete all as specified and directed. 2 Each job
80 27 Dismantling of existing electric motor and mono block pump (3 phase 440 volt, squirrel case, slip ring/induction motor) form foundation and disconnecting from electrically and mechanically from foundation. Taking out the motor from starter strip re-winding by using appropriate supper quality copper winding wire of suitable guage including varnishing, bearing as per sample and insulation paper all complete of capacity 2 HP electric motor and reconnection after rewinding complete all as specified and directed. 2 Each job
81 28 Dismantling of existing electric motor for cooling tower (3 phase 440 volt, squirrel case, slip ring/induction motor) form foundation and disconnecting from electrically and mechanically from foundation. Taking out the motor from starter strip re-winding by using appropriate supper quality copper winding wire of suitable guage including varnishing, bearing as per sample and insulation paper all complete of capacity 2 HP electric motor and reconnection after rewinding complete all as specified and directed. 2 Each job
82 29 Repair and maint of FRP cooling towers of air compressor by means removing of PVC fills, header, nozzles etc., cleaning of nozzles, header, fills, and re-fixing the same with the replacement of unserviceable PVC fills including painting of external surfaces of cooling towers with one coat of synthetic enamel paint after preparation of surfaces complete all as specified and directed.\nNote:- PVC fills shall be measured and paid separately under respective item 4 Each job
83 30 Supply only PVC fills block 600x300x150mm size complete all as specified and directed. 100 Each
84 31 Supply and filling of compressor oil Servo 150 for Ingersoll Rand Air Compressor at various location including taking out old unserviceable compressor oil complete all as specified and directed. 210 Litre
85 32 Supply and filling of lubricating oil Servo Press-220 at various locations including taking out old unserviceable lubricating oil complete all as specified and directed. 40 Litre
86 33 S&F in replacement of 15 mm dia ball brass valve, high pressure, with polythene float and fly nuts complete, screwed for iron pipe or brass ferrule and fixed complete all as specified and directed. 4 Each
87 34 S&F in replacement of 25 mm dia ball brass valve, high pressure, with polythene float and fly nuts screwed for iron pipe or brass ferrule and fixed complete all as specified and directed. 6 Each
88 35 S&F in replacement of 15mm bore air regulating valve of size complete with ball valve, air regulating valve, pressure gauge and quick snap coupling complete suitable for compressed air complete all as specified and directed. 10 Each
89 36 Maintenance and complete servicing of Air Compressor by cleaning of complete body, removing of oil from body, cleaning of air filter, removing of moisture from moisture separator and top up of compressor oil, checking of oil leakage and rectify by replacement of oil seal , air & oil filter complete all as specified and directed. \nMake of Air Compressor :- Ingersoll R and model No 9x7 ESV-1 -01 No,Lub, 8x5 ESV-1-01 No Lub, 9x7 ESV-1 NL-2 No,UP511CTAS-8- 01 No of capacity 32 to 500 CFM \nNote:- Compressor oil required for top up shall be measured and paid separately under respective item as considered therein. 5 Each Job
90 37 Maintenance and complete overhauling of Air Compressor make – Ingersoll-Rand, Model 9x7 ESV-1 Lub at E&IRS de-caning of old pump oil, lubricating oil, opening and taking out of suction/discharge line filters, loading/unloading system, disconnecting water lines connections, checking of V-belts as required and all of internal parts of Air Compressors, cleaning of all parts, removing any deposited carbon on channels, cleaning of crank case pump, checking and cleaning of connecting rods, crank shaft bearings, replacement of oil seals, loading/unloading plunger and re-assembling of air compressor after repair and replacement of un serviceable parts with new parts, including over hauling of oil pump assy making suction/discharge connection, fixing to existing new/old serviceable V-belt to bring the compressors ready in position for use, testing on load minimum eight hours complete all as specified and directed . \nNote :-Any parts/Spares/items required for repairs shall be measured and paid separately in respective items as supply only and fixing charges for the same shall be deemed to be included in the quoted rate.\n. 1 Each Job
91 38 Supply Only Spares/Parts For 9x7 ESV-1 Lub vertical Air compressor:-\nRing piston 9" 1 Each
92 39 All as per item No 38 but for Ring piston for unloader 1 Each
93 40 All as per item No 38 but for O ring for unloader 1 Each
94 41 All as per item No 38 but for Dowell pin 3 Each
95 42 All as per item No 38 but for Valve auxiliary 1 Each
96 43 All as per item No 38 but for Oil filter. 1 Each Set
97 44 All as per item No 38 but for Gasket set complete 1 Each set
98 45 All as per item No 38 but for Filter element. 1 Each
99 46 All as per item No 38 but for Spring for plunger FAU 1 Each
100 47 All as per item No 38 but for Oil seal for crank shaft. 1 Each
101 48 All as per item No 38 but for Lubricating oil case complete. 1 Each
102 49 S&F in replacement of oil pump assembly suitable for air compressor 120 cfm to 500 cfm complete all as specified and directed. 2 Each Job
103 50 S&F in replacement auto drain trap valve 15 mm bore including all fitting and control drain pipe as required at site including making electrical connection complete all as specified and directed. 4 Each job
104 51 Supply & Replacement Rotational moulded Polyethylene water storage tank -1000 liters capacity ISI marked (cylindrical vertical with closed top) hoisted and fixed in position all as specified and directed. 2 Each
105 52 Supply and laying in trenches/wall steel water tubes medium grade galvanised of size 15 mm dia with all fittings in wall trench complete all as specified and directed . 40 RM
106 53 -ditto- all as per item No 52 but for size 20 mm dia 30 RM
107 54 -ditto- all as per item No 52 but for size 25 mm dia 50 RM
108 55 Supply & fix in replacement of MS pipe 'C' class including cutting & welding work and connected fitting as required at site complete all as specified and directed .\n 50 mm dia bore 50 RM
109 56 -ditto- all as per item No 55 but for size 40 mm dia bore 50 RM
110 57 Supply & fix in replacement gun metal gate or globe valve of 15 mm dia with iron wheel head screwed both ends for iron pipes incl dismantling (fixed in repairs) of existing unserviceable gate valve for the following dia. 4 Each
111 58 S&F in replacement of gun metal gate or globe valve of 25 mm dia with iron wheel head screwed both ends for iron pipes incl dismantling (fixed in repairs) of existing unserviceable gate valve complete all as specified and directed. 4 Each
112 59 S&F in replacement of gun metal gate or globe valve of 50 mm dia with iron wheel head screwed both ends for iron pipes incl dismantling (fixed in repairs) of existing unserviceable gate valve complete all as specified and directed. 4 Each
113 60 S&F in replacement of air control valve Ball valve suitable for compressed air for the 50mm dia bore size of MS pipe class 'C' complete all as specified and directed. 18 Each\n
114 61 Material & Labour for scraping out old paint from the inner & outer surface of the body painting of vertical air receiver with one coat of synthetic enamel paint of approved colour after preparation of surface by one coat process including gasket set for opening of air receiver,connected pipe lines & valves from air receiver to air compressor for 3 Cum capacity complete all as specified and directed. 10 Each job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail