| 1 | 1 | SP-1 :Material cost\nSupply of all imported/indigenous materials required for permanent incorporation to set up the unit/facility/works complete in all respects including commissioning and mandatory spares (if required) made up as follows: | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Materials | BI01010001010000000000000515BI0100001113 | | |
|---|
| 3 | 1.02 | Mechanical bulk materials (pipe/fittings/valves/flanges etc) | BI01010001010000000000000515BI0100001114 | 1 | LS |
|---|
| 4 | 1.03 | Construction materials (Cement, Reinforcement steel, sand, aggregate, Primer, Paint etc.) | BI01010001010000000000000515BI0100001115 | 1 | LS |
|---|
| 5 | 1.04 | Electrical and instrument items | BI01010001010000000000000515BI0100001193 | 1 | LS |
|---|
| 6 | 1.05 | Fire protection items (sprinklers/quartz bulbs etc) | BI01010001010000000000000515BI0100001194 | 1 | LS |
|---|
| 7 | 1.06 | Any other items not included above | BI01010001010000000000000515BI0100001195 | 1 | LS |
|---|
| 8 | 2 | SP-2: SERVICES | BI01010001010000000000000515BI0100001118 | | |
|---|
| 9 | 2.01 | DESIGN & ENGINEERING:\nDESIGN & ENGINEERING: Sprinkler system Design, Detail Piping Design & engineering as per contract documents & P&ID enclosed with the tender. | BI01010001010000000000000515BI0100001119 | 1 | LS |
|---|
| 10 | 2.02 | CONSTRUCTION/INSTALLATION AND COMMISSIONING SERVICES ETC.\nProviding services for all civil jobs, pre–fabrication, fabrication, erection, construction , installation, testing , pre–commissioning, mechanical completion , commissioning and conducting service test required for completing and establishing the plant/facilities as a fully functional and operative Unit , including (but not limited to) providing all labours and manpower, resources, transportation , store management , construction equipment , tools , tackles and aids , safety devices , testing devices , facilities , utilities, communication systems , material and other reconciliations, handing over of final drawings/documents/manuals, obtaining and satisfying all statutory licenses, clearances, consents, no objections, approvals and certificates and complying with all statutory approvals/formalities etc. and all other services whatsoever required for completing the works in all respects in accordance with the contract documents of the plant as per direction of E-I-C. | BI01010001010000000000000515BI0100001120 | | |
|---|
| 11 | 2.03 | CIVIL WORKS & STRUCTURAL WORKS COST (General civil works including site grading, area development, excavation of roads & RCC pavements barricading, Pipe supports and footings, structural supports, Painting, stencilling etc ) | BI01010001010000000000000515BI0100001121 | 1 | LS |
|---|
| 12 | 2.04 | MECHANICAL WORKS COST (scaffolding erection& dismantling, dismantling of existing sprinkler system, pipe line & bulk items erection & welding, NDT works, hydrotest etc) | BI01010001010000000000000515BI0100001122 | 1 | LS |
|---|
| 13 | 2.05 | ELECTRICAL & INSTRUMENTATION WORKS (cable laying, & terminating, junction box installation etc) | BI01010001010000000000000515BI0100001123 | 1 | LS |
|---|
| 14 | 2.06 | COMMISSIONING & SERVICE TEST (installation of Fire sprinkler systems items like Sprinklers & Quartz bulbs, Service test of the completed installation etc) | BI01010001010000000000000515BI0100001124 | 1 | LS |
|---|
| 15 | 2.07 | ANY OTHER SERVICE COST IF NOT COVERED ABOVE BUT REQUIRED FOR COMPLETION OF THE WORK IN TOTALITY (BIDDER TO IDENTIFY) | BI01010001010000000000000515BI0100001125 | 1 | LS |
|---|
| 16 | 3 | SP-0: TOTAL LUMPSUM PRICE (SP0=SP1+SP2) | BI01010001010000000000000515BI0100001127 | | |
|---|