Water Resources and Irrigation Government Departments Closing in 0 days TDR #24047843

Sdrf- Natural Calamity-Urgent Rectification Works Between Ch-3 . 200 To 3 . 400 Km Of Kallur Branch Canal

Issued by Government Departments · Kallur, Kerala
Tender Value
5.59 Lakhs
Estimated cost
Bid Submission
16 Apr 2020
0 days left
EMD
15750
Bank guarantee accepted
Document Fee
1300
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kallur → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Sdrf- Natural Calamity-Urgent Rectification Works Between Ch-3 . 200 To 3 . 400 Km Of Kallur Branch Canal

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 27-Mar-2020 Extenteion of date Date 16-Apr-2020

BOQ

Work Name:SDRF- Natural calamity -Urgent Rectification works between Ch.3/200 to 3/400 KM. of Kallur Branch Canal
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Scheme 1 from ch:3/200 to 3/225 KmBI01010001010000000000000515BI0100001113
21.012.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of departmental officers at siteBI01010001010000000000000515BI01000011146.57cum
31.024.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) as per the direction of departmental officers at siteBI01010001010000000000000515BI01000011156.57cum
41.034.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) as per the direction of departmental officers at siteBI01010001010000000000000515BI010000111610.8cum
51.044.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns as per the direction of departmental officers at siteBI01010001010000000000000515BI010000111775.6sqm
61.054.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per the direction of departmental officers at siteBI01010001010000000000000515BI01000011181.08cum
71.0650.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of departmental officers at siteBI01010001010000000000000515BI010000111943.2sqm
82Scheme 2 from 3/230 to 3/250KmBI01010001010000000000000515BI0100001120
92.012.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of departmental officers at siteBI01010001010000000000000515BI01000011216.57cum
102.024.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) as per the direction of departmental officers at siteBI01010001010000000000000515BI01000011226.57cum
112.034.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) as per the direction of departmental officers at siteBI01010001010000000000000515BI010000112310.8cum
122.044.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns as per the direction of departmental officers at siteBI01010001010000000000000515BI010000112475.6sqm
132.054.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per the direction of departmental officers at siteBI01010001010000000000000515BI01000011251.08cum
142.0650.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of departmental officers at siteBI01010001010000000000000515BI010000112643.2sqm
153Scheme 3 from 3/250 to 3/275 KmBI01010001010000000000000515BI0100001127
163.012.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of departmental officers at siteBI01010001010000000000000515BI01000011286.57cum
173.024.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) as per the direction of departmental officers at siteBI01010001010000000000000515BI01000011296.57cum
183.034.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) as per the direction of departmental officers at siteBI01010001010000000000000515BI010000113010.8cum
193.044.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns as per the direction of departmental officers at siteBI01010001010000000000000515BI010000113175.6sqm
203.054.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per the direction of departmental officers at siteBI01010001010000000000000515BI01000011321.08cum
213.0650.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of departmental officers at siteBI01010001010000000000000515BI010000113343.2sqm
224Scheme 4 from 3/275 to 3/300KmBI01010001010000000000000515BI0100001134
234.012.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of departmental officers at siteBI01010001010000000000000515BI01000011355.84cum
244.024.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) as per the direction of departmental officers at siteBI01010001010000000000000515BI01000011365.84cum
254.034.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) as per the direction of departmental officers at siteBI01010001010000000000000515BI01000011379.6cum
264.044.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns as per the direction of departmental officers at siteBI01010001010000000000000515BI010000113867.2sqm
274.054.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per the direction of departmental officers at siteBI01010001010000000000000515BI01000011390.96cum
284.0650.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of departmental officers at siteBI01010001010000000000000515BI010000114038.4sqm

AI Tender Summary

OUR REF NO 24047843
AUTHORITY Government Departments
TENDER VALUE 5.59 Lakhs
LAST DATE 16-04-2020
Authority
Authority Name Irrigation Department
Work Description Sdrf- Natural Calamity-Urgent Rectification Works Between Ch-3 . 200 To 3 . 400 Km Of Kallur Branch Canal
Basic Detail
Tender No 221/AEE/2019-20
Bidding Type Tender
Location
City Kallur
State Kerala
Key Dates
Publish Date 27 Mar 2020
Submission Date 16 Apr 2020
Open Date 21 Apr 2020
Finance
Tender Value 5.59 Lakhs
Tender Fee 1300
EMD 15750
Exemption Not Available
Document List
BOQ_494002.xls
Tendernotice_1.pdf
Epaymentrequisition2.pdf
PreliminaryAgreement.pdf
221Forms83and84.pdf
042292AC-40CA-4C49-B713-20F3FFDD5127.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 27, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 16, 2020
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 16, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 21, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_494002.xls

pdf

Tendernotice_1.pdf

pdf

Epaymentrequisition2.pdf

pdf

PreliminaryAgreement.pdf

pdf

221Forms83and84.pdf

html

042292AC-40CA-4C49-B713-20F3FFDD5127.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders