Sdrf- Natural Calamity-Urgent Rectification Works Between Ch-3 . 200 To 3 . 400 Km Of Kallur Branch Canal
Tender Overview
Project Description
Sdrf- Natural Calamity-Urgent Rectification Works Between Ch-3 . 200 To 3 . 400 Km Of Kallur Branch Canal
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 27-Mar-2020 | Extenteion of date | Date | 16-Apr-2020 |
BOQ
| Work Name:SDRF- Natural calamity -Urgent Rectification works between Ch.3/200 to 3/400 KM. of Kallur Branch Canal | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Scheme 1 from ch:3/200 to 3/225 Km | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001114 | 6.57 | cum |
| 3 | 1.02 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001115 | 6.57 | cum |
| 4 | 1.03 | 4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001116 | 10.8 | cum |
| 5 | 1.04 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001117 | 75.6 | sqm |
| 6 | 1.05 | 4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001118 | 1.08 | cum |
| 7 | 1.06 | 50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001119 | 43.2 | sqm |
| 8 | 2 | Scheme 2 from 3/230 to 3/250Km | BI01010001010000000000000515BI0100001120 | ||
| 9 | 2.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001121 | 6.57 | cum |
| 10 | 2.02 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001122 | 6.57 | cum |
| 11 | 2.03 | 4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001123 | 10.8 | cum |
| 12 | 2.04 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001124 | 75.6 | sqm |
| 13 | 2.05 | 4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001125 | 1.08 | cum |
| 14 | 2.06 | 50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001126 | 43.2 | sqm |
| 15 | 3 | Scheme 3 from 3/250 to 3/275 Km | BI01010001010000000000000515BI0100001127 | ||
| 16 | 3.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001128 | 6.57 | cum |
| 17 | 3.02 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001129 | 6.57 | cum |
| 18 | 3.03 | 4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001130 | 10.8 | cum |
| 19 | 3.04 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001131 | 75.6 | sqm |
| 20 | 3.05 | 4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001132 | 1.08 | cum |
| 21 | 3.06 | 50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001133 | 43.2 | sqm |
| 22 | 4 | Scheme 4 from 3/275 to 3/300Km | BI01010001010000000000000515BI0100001134 | ||
| 23 | 4.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001135 | 5.84 | cum |
| 24 | 4.02 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001136 | 5.84 | cum |
| 25 | 4.03 | 4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001137 | 9.6 | cum |
| 26 | 4.04 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001138 | 67.2 | sqm |
| 27 | 4.05 | 4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001139 | 0.96 | cum |
| 28 | 4.06 | 50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of departmental officers at site | BI01010001010000000000000515BI0100001140 | 38.4 | sqm |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender