Name of Work: Re-construction of Fish pond in RTP-NIRDPR
Sl.No.
Item Description
Item Code / Make
Quantity
Units
1
1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
item1
39
Cum
2
2
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge in cement mortar
item2
7
Cum
3
3
Providing and laying in position cement concrete of PCC (1:5:10) grade excluding the cost of centering and shuttering in foundation upto plinth stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge in cement mortar
item3
9.5
Cum
4
4
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
item4
50
Cum
5
5
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
item5
7
Cum
6
6
12 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:6 (1 cement : 6 coarse sand) finished with a top layer 6 mm thick cement plaster 1:6 (1 cement : 6 fine sand).
item6
70
Sqm
7
7
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars
item7
700
Kgs
8
8
Centering and shuttering including strutting, propping etc. and removal of form work for : Suspended floors, roofs, landings, balconies and access
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.