| 1 | 1 | Excavation in foundation in ordinary soil (Loam Clay or Sand) including lift upto 1.5m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation work. (CSI No. 4.01) | | 45.5 | Cum |
|---|
| 2 | 2 | Concrete with 4cm gauge I class stone ballast (class 150) , coarse sand (F.M. 1.5 to 2.0) and cement in proportion of 12:6:1 in foundations and under floors including supply of all materials, labour and tools and plants etc. required for proper completion. (CSI No.5.02 ) | | 7 | Cum |
|---|
| 3 | 3 | 1st Class brick ( class-150) work in 1:6 cement and coarse sand (F.M. 1.5.to 2.0 ). mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (C.S.I. No.6.01) | | 44 | Cum |
|---|
| 4 | 4 | 2.5cm. thick DPC and of cement concrete consisting of 1 part cement 1.5 parts approved coarse sand, and 3 parts approved 12 mm. graded stone grit and also including liquid water proofing material as approved by the Engineer-Incharge in the proportions specified by the manufacturer. (CSI No. 7.02) | | 49 | Sqm |
|---|
| 5 | 5 | 1st Class brick ( class-150) work in 1:6 cement and coarse sand (F.M. 1.5.to 2.0 ). mortar in s/s for 230mm wall including supply of all materials, labour and T&P etc. required for proper completion of the work. (C.S.I. No.6.01+6.07+6.08) | | 65.8 | Cum |
|---|
| 6 | 6 | TMT/Tor steel in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bend, hooks and authorized overlapping shall be measured. (Steel shall be arranged by the contractor) (CSI No. 9.03) | | 0.2 | MT |
|---|
| 7 | 7 | R.C.C. work with cement, approved coarse sand and 2 cm. (3/4\") gauge approved stone ballast in the proportion of 1:1.5:3 in the coloum excluding reinforcement and its bending but including its fixing and binding the same with 24 BWG, G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. (Binding wire to be supplied by the contractor free of cost).(C.S.I. No. 5.29) | | 2 | Cum |
|---|
| 8 | 8 | Same as item no. 7 above but in raft (C.S.I. No.5.27) | | 2 | Cum |
|---|
| 9 | 9 | Mild steel or iron work in heavy sizes such as trusses, built-up gates, door frames, record racks, roof work, gates etc. wrought to required form including drilling holes rivetting or welding where necessary and also fixing in proper position and alignment including supply of steel, nuts wastage etc. and their fixing as required for proper completion of the work (CSI No. 9.01 ) | | 0.75 | MT |
|---|
| 10 | 10 | Finishing wall with waterproof cement paint of approved made like ACE or equivalent quality on new work with three coats to give an even shade including supply of all materials, labour and T&P's etc. required for proper completion of the work.NSI. | | 780 | Sqm |
|---|
| 11 | 11 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metres. (CSI No. 15.01) | | 2 | Cum |
|---|
| 12 | 12 | 12 mm (1/2\") thick plaster with cement mortar in proportion of 1:4 cement and approved coarse sand over brick work, minimum thickness not to be less than 1 cm. (3/8\") including supply of all materials, labour and T&P etc. required for proper completion of the work.(rates including cost of cement) (C.S.I. No.11.07) | | 780 | Sqm |
|---|
| 13 | 13 | Providing (12x15)mm section groove in plaster including all material, labour and T&P etc. required for proper completion of the work. (CSI No. 11.16) | | 570 | Rmt |
|---|
| 14 | 14 | P/F Concertina coil fencing with required dia. 600 mm upto 3 M height of wall between existing angle iron ‘Y’ shaped placed 2.4 M or 3.0 M apart and with 6 horizontal R.B.T. stud tied with G.I. staples and G.I. clips to retain horizontal including necessary golts or G.I. barbed wire tied to angle iron all complete ( No. of rounds will be 7 to 8 in one Meter length) as per direction of Engineer I/C with reinforced barbed tape (R.B.T.)/ Spring core (2.5mm thick ) wire of high tensile strength of 165 kg/Sqmm with tape ( 0.52 mm thick ) of supreme make or equivalent and weight 43.478 gm/meter ( cost of MS angle, C.C. blocks shall be paid separately).(CSI No. 9.37) | | 180 | Rmt |
|---|
| 15 | 15 | Earth filling under floors and in substation area including cost of earth. Earth to be obtained from outside the Corporation's area including its cartage and ramming, watering, dressing in 20 cm. thick layers and dressing of earth etc. complete including cost of earth with all lead and lift etc. complete.(C.S.I. No.4.10) | | 4 | Cum. |
|---|
| 16 | 16 | Painting or varnishing new iron work in small areas or new wood work with one coat of ready mixed priming paint and one coat of approved superior quality ready mix paint \"Luxol\" or equivalent brand or varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S. 103-1950. (CSI No. 13.01+13.02) | | 18 | Sqm. |
|---|
| 17 | 17 | SPECIALTERMS & CONDITIONS :-\n | | | |
|---|
| 18 | 17.01 | The work shall be started in immediately form the given date of start and to be completed on urgent basis. If any constractor pretend by linking the pending payment against other works bill and stop the work or slow the progress of work, Action shall be taken against as per agreement clause. | | | |
|---|
| 19 | 17.02 | The Contractor who already executing some work in the department/division and stop the work/linger on the work without any reason. The performance shall be treated unsatisfactory, part-II of such type of contractor may not be opened. | | | |
|---|
| 20 | 17.03 | Before execution of work, the contractor must cover the control panel on his own cost with the help of tirpal. | | | |
|---|
| 21 | 17.04 | Due to rainy season, when work is not in progress the contractor must cover the roof on his own cost with help of plastic of required thickness. | | | |
|---|
| 22 | 18 | TERMS & CONDITIONS :-\n | | | |
|---|
| 23 | 18.01 | Firms are advised to visit the site of work and make themselves acquainted with site condition. No clian what so evel shall be entertained after submission of the tendere. | | | |
|---|
| 24 | 18.02 | Cement shall be arranged by the contractor on his own cost, fresh cement conforming to relevant I.S. of brand such as J.K., Birla Uttam, A.C.C., Ambuja or equivalent of major plants shall be used in the work, Contractor shall make proper storage arrangement of cement at site of works to the satisfaction of E/I. Cement should always be stored in such a manned to be esily accessible of proper inspection and in a suitable weather tight building or storage shed to protect the cement from dampness. | | | |
|---|
| 25 | 18.03 | During execution of work contractor may be asked to perform the quality test of material as and when required in an approved lab and its cost will be borne by the contractor | | | |
|---|
| 26 | 18.04 | TOR stell shall be of Fe 415 grade and of approved make by E/I. | | | |
|---|
| 27 | 18.05 | Quantities are approximate and vary up to any extent on either side as per requirement of site condition. | | | |
|---|
| 28 | 18.06 | All above work shall be executed as per UPPWD /UPPCL specification or as per direction of E/I. | | | |
|---|
| 29 | 18.07 | All electrification material /fittings and other materials of door/ windows including fittings etc shall be got approved from E/I before fixing the same at site of work. | | | |
|---|
| 30 | 18.08 | ACE Acrylic distemper and paint etc shall be of ASIAN /BERGER/J&N brand of approved quality which shall be got approved before using in the work from the E/I. | | | |
|---|
| 31 | 18.09 | Flush door and other aluminium fittings etc shall be got approved by E/I . Flush door shutter shall be 100% water proof of ISI marked. | | | |
|---|
| 32 | 18.1 | If specifications for any item of work are not covered by any of the documents mentioned in the contract the same shall be decided and conveyed by the E/I to the contractor. | | | |
|---|
| 33 | 18.11 | IOld bricks , if any shall be recovered from dismantling of brick work in cement/ lime mortar as follows:-\n(a) 60% of the total quantity of dismantling brick work shall be treated as received and shall be reused @Rs.4200.00 per 1000 in relevant item of old B/W.\n(b) 25% of the total quantity of dismantled work shall be treated as brick bats and shall be recovered @Rs.850.00 per Cum at site and balance shall be treated as malba. | | | |
|---|
| 34 | 18.12 | Old and dismantled door and windows if any shall be property of contractor which shall be recovered @Rs. 200.00 per Sqm from the contractor. | | | |
|---|
| 35 | 18.13 | Old and unusable steel / scrap if any of RCC /RB work shall be [email protected] per kg from the contractor. | | | |
|---|
| 36 | 18.14 | Kachchi shuttering in RCC work is strictly prohibited . If RCC is done with kachchi shuttering , 20% of rate of RCC shall be reduced without giving any notice to the contractor. | | | |
|---|
| 37 | 18.15 | The work shall be carried out upto approximately 8m height for double storied building. | | | |
|---|
| 38 | 18.16 | The rates are exclusive of GST which shall be paid extra as applicable. For reimbursement of GST contractor must be registerd with Sale tax Department. | | | |
|---|
| 39 | 18.17 | Other terms and conditions are same as attached in enclosed tender document. | | | |
|---|