}

Repair Of Cooling Appliances Desert Cooler Window Type Split Type Deep Freezer Refrigerators Water Coolers And Repair Of Diesel Generator Sets Amf Panels And Connected Works At Af Station Chandinagar, AF STATION CHANDINAGAR-Haryana

Military Engineer Services-MES has published Repair Of Cooling Appliances Desert Cooler Window Type Split Type Deep Freezer Refrigerators Water Coolers And Repair Of Diesel Generator Sets Amf Panels And Connected Works At Af Station Chandinagar. Submission Date for this Tender is 28-03-2020. Diesel Generators Tenders in AF STATION CHANDINAGAR Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

24014127
Repair Of Cooling Appliances Desert Cooler Window Type Split Type Deep Freezer Refrigerators Water Coolers And Repair Of Diesel Generator Sets Amf Panels And Connected Works At Af Station Chandinagar
National Competitive Bid
Indian
Haryana
AF STATION CHANDINAGAR
28-03-2020

Tender Details

Repair Of Cooling Appliances Desert Cooler Window Type Split Type Deep Freezer Refrigerators Water Coolers And Repair Of Diesel Generator Sets Amf Panels And Connected Works At Af Station Chandinagar

Key Value

Document Fees
INR 500 /-
EMD
INR 22460.0 /-
Tender Value
INR 11.23 Lakhs /-

BOQ Items

Name of Work: REPAIR/MAINT OF COOLING APPLIANCES DESERT COOLER, WINDOW TYPE, SPLIT TYPE, DEEP FREEZER, REFRIGERATORS & WATER COOLERS AND REPAIR/MAINT OF DG SETS, AMF PANELS AND CONNECTED WORKS AT AF STATION CHANDINAGAR UNDER GE (AF) FARIDABAD
Sl. No. Item Description Item Code / Make Quantity Units
1 1 M&L for servicing of split type AC's of capacity 1.5 TR and 2 TR comprising of the following tasks installed at different locations including refixing, commissioning and testing complete all as specified and directed by Engineer-in-Charge. \n(a) Inspecting and checking the Indoor/outdoor units for noise free operation.\n(b) Checking the electrical connection for tightness\n(c) Cleaning the condenser with cleaning agent followed with pressurized water and cleaning the cooling coil with air blower.\n(d) Greasing/Oiling of condenser fan motor and blower motor.\n(e) Checking for any refrigerant leakage.\n(f) Checking for serviceability of remote control unit. 10 Each Job
2 2 M&L for servicing and Maintenance of window type AC's of capacity 1.5 TR comprising of the following tasks at different locations including Refixing, commissioning and testing complete all as specified and directed by Engineer-in-Charge. \n(a) Inspecting, taking down, brushing cleaning with blower including acid/detergent wash of condenser and cooling coil.\n(b) Carry out operation of blower and compressor and ensure that satisfactory functioning of all parts.\n(c) Inspecting the leakage in the system.\n(d) Checking of the earth continuity of electrical parts.\n(e) Checking the functioning of thermostat.\n(f) Inspection of all electrical parts. 10 Each Job
3 3 M&L for Servicing & maintenance of water coolers of any capacity comprising of the following tasks at different location complete all as specified and directed by Engineer-in-Charge.\n(a) Inspection, taking down, opening, dismantling, descaling, brushing cleaning of storage tanks\n(b) Examination water tightness, leak proof of storage tank after cleaning.\n(c) Carry out operation of all stop cock, push cock, float valve etc.\n(d) Inspect overflow and remove blockage if any.\n(e) Check and correct earth continuity of electric items\n(f) Check thermostat and test its functioning\n(g) Inspect drain pipe and remove blockage if any\n(h) Check and correct all electrical wiring & test its functioning\n(j) Testing of water cooler after repair. 20 Each Job
4 4 S&F in replacement of starting relay for split type AC units of capacity 2 TR as required at site complete all as specified and directed by Engineer-in-Charge. \nMake-Sriram/Hi-Tech/Classic 3 Each
5 5 S&F in replacement of starting capacitor 80-100/100-120 mfd for split type A/C's of capacity 2 TR complete all as specified and directed by Engineer-in-Charge.\nMake-Telsa 5 Each
6 6 S&F in replacement of running capacitor 30/36 mfd for split type AC unit as required at Site and complete all as specified and directed by Engineer-in-Charge. 5 Each
7 7 S&F in replacement of contactor, as per existing model, coil voltage 230V installed in split type AC units complete all as specified and directed by Engineer-in-Charge. \nMake- L&T/Siemen 3 Each
8 8 Taking out and replacement of condenser fan motor incl bush/bearings of split type AC units capacity 1.5/2 TR complete all as specified and directed by Engineer-in-Charge. 3 Each Job
9 9 All as per item No 8 above but for blower motor complete all as specified and directed by Engineer-in-Charge. 2 Each Job
10 10 M&L for repair to PCB of split AC for remote operation complete testing and installation and all electrical connections complete all as specified and directed by Engineer-in-Charge. 2 Each Job
11 11 Disconnecting and taking down old burnt compressor of capacity 2TR from split type AC unit and replacing the same with new one from the company as per existing model (suitable for CFC free refrigerent) complete all as specified and directed by Engineer-in-Charge. 1 Each Job
12 12 Disconnecting and taking down old burnt compressor of capacity 1.5 TR from split type AC unit and replacing the same with new one from the company as per existing model (suitable for CFC free refrigerent) complete all as specified and directed by Engineer-in-Charge. 2 Each Job
13 13 S&F in replacement of condensing coil of copper tubing suitable for 1.5 TR Spilt AC recharging of refrigerent as required making all necessary connection and testing for smooth funtioning complete all as specified and directed by Engineer-in-Charge. 2 Each Job
14 14 S&F in replacement of condensing coil of copper tubing suitable for 2 TR Spilt AC recharging of refrigerent as required making all necessary connection and testing for smooth funtioning complete all as specified and directed by Engineer-in-Charge. 2 Each Job
15 15 M&L for repair to leaking area of split type AC unit of capacity 2 /1.5 TR capacity including pressure testing, dehydration and gas charging complete all as specified and directed by Engineer-in-Charge. 8 Each Job
16 16 S&F in replacmemt remote control unit (cordless) as per existing model for 2/1.5 TR split type A/C unit complete all as specified and directed by Engineer-in-Charge. 2 Each
17 17 S&F in replacement of air filter for split type A/C units of capacity upto 2/1.5 TR as per sample complete all as specified and directed by Engineer-in-Charge. 3 Each
18 18 M&L for providing insulation to copper tubing’s from Indoor to outdoor units with foam insulation followed with PVC flexible pipe 50mm with clamps complete all as specified and directed by Engineer-in-Charge. 25 RM
19 19 S&F in replacement 3 core copper PVC insulated of size 70/.0076 complete all as specified and directed by Engineer-in-Charge. \nMake: Plaza/Kalinga 30 RM
20 20 Supply and charging gas CFC free to AC 1.5/2 TR capacity complete all as specified and directed by Engineer-in-Charge. 5 Kg
21 21 S&F in replacement of copper tubing 3/8” outer dia suitable for 1.5/2 TR AC including nitril rubber thermal insulation capacity complete all as specified and directed by Engineer-in-Charge. 30 RM
22 22 All as per item above but here in before 5/8” outer dia complete all as specified and directed by Engineer-in-Charge. 20 RM
23 23 S&F in replacement of thermostat switch as required at site complete all as specified and directed by Engineer-in-Charge. 2 Each
24 24 S&F 3.15 mfd for fan motor capacitor complete all as specified and directed by Engineer-in-Charge. 5 Each
25 25 S&F in replacement of overload protector for compressor as reqd at site complete as specified and directed by Engineer-in-charge. 5 Each
26 26 S&F in replacement of starting relay as required at site for water coolers complete including connecting, testing complete all as specified and directed by Engineer-in-Charge. 5 Each
27 27 S&F in replacement of waste water tray as required at site made out of 20 gauge GI sheet complete with PVC drain pipe including painting with PVC drain pipe including painting with aluminum paint complete all as specified and directed by Engineer-in-Charge. 2 Each
28 28 S&F in replacement of brass float valves accessories 15mm size as required at site complete all as specified and directed by Engineer-in-Charge. 3 Each
29 29 Disconnecting & taking out compressor ('R' type) from water cooler and refixing the same after repair including flushing dehydration and gas charging complete all as specified and directed by Engineer-in-Charge. 2 Each Job
30 30 Disconnecting and taking down water cooler of any make and size for repairs including detection of leakage in the system rectifying the same, dehydration & recharging of gas testing the water cooler for smooth & satisfactoryworking complete all as specified and directed by Engineer-in-Charge. 3 Each
31 31 S&F in replacement of CP push cock ISI marked 15mm base complete all as specified and directed by Engineer-in-Charge. 5 Each
32 32 S&F in replacement of CP Bib taps, cast copper alloy with crutch or butterfly handle, screwed down, screwed for iron pipe or for brass ferrule and fixed complete all as per specified and directed by Engineer-in-Charge. 10 Each
33 33 S&F in replacement of starting capacitor 100/120 mfd for compressor complete all as specified and directed by Engineer-in-Charge. 5 Each
34 34 S&F in replacement of new condenser motor single phase of 1/16 HP as required at site for water cooler with clamps, bolts, nuts & rubber bushes complete including connecting testing complete all as specified and directed by Engineer-in-Charge. 2 Each
35 35 S&F in replacement of Mini DP MCB with enclosure including MCB 06-32 Amps complete all as specified and directed by Engineer-in-Charge. 2 Each
36 36 M&L for repair to rusted body of water cooler as directed at site by replacing M.S sheet 18 SWG and fixing new sheet by remitting/gas welding and replacement of angle iron complete all as specified and directed by Engineer-in-Charge. 12 Each Job
37 37 Taking down desert cooler of any size by disconnecting electrical supply, cleaning, oiling of all moving part of pumps and fans, Replacing PVC pipes, nozzles, distributors, , checking electrical connections complete all as specified and directed by Engineer-in-Charge. 100 Each
38 38 S&F in replacement of wood pads (set of three) as per sample complete all as specified and directed by Engineer-in-Charge.\nMake KHAITAN/CROMPTON 100 Each
39 39 S&F in replacement the new desert cooler pump including testing for proper functioning complete all as specified and directed by Engineer-in-Charge.\nMake KHAITAN/CROMPTON 45 Each
40 40 S&F Desert cooler motor copper wound complete all as specified and directed by Engineer-in-Charge. 45 Each
41 41 S&F in replacement the new exhaust fan with kit 450mm sweep complete all as specified and directed by Engineer-in-Charge.\nMake: Khaitan/Elpar 45 Each
42 42 S&F in replacement new body of desert cooler as per sample duly painted of 20 SWG sheet with 22 SWG flops, front grill, PVC pipe, nozzle, distributor and nut bolts washers for fixing fan clamps, complete all as specified and directed by Engineer-in-charge. 10 Each
43 43 Supply and fixing front grill of desert cooler as per sample complete all as specified and directed by Engineer-in-Charge. 45 Each
44 44 S&F in replacement plug top 5 Amps complete all as specified and directed by Engineer-in-Charge. 30 Each
45 45 M&L Scrapping old paint and painting of desert cooler with one coats of red oxide inside and two coat of synthetic enamel paint( in/ou tside) complete all as specified and directed by Engineer-in-Charge. 100 Each
46 46 M&L for fixing plastic laminated sheet milky 3mm thick for closing window opening hole for fixing of desert cooler at any floor level complete all as specified and directed Engineer-in-charge. 4 Each
47 47 S&F in replacement of running capacitor 6 mfd for blower motor as required at site complete all as specified and directed by Engineer-in-Charge.\nMake -EPCOS/Asian/Havells 15 Each
48 48 S&F in replacement selector switch as required at site and complete all as specified and directed by Engineer-in-Charge. 5 Each
49 49 S&F in replacement of rotary switch as requirement at site complete all as specified and directed by Engineer-in-Charge. 7 Each
50 50 S&F in replacement of new blower motor 1/6 HP as required at site single phase 230 volts double shaft with clamp bolts, nuts and rubber bushes including testing & commissioning complete all as specified and directed by Engineer-in-Charge. 3 Each
51 51 S&F in replacement of thermostats as required at site complete for window type AC 1.5 /2 TR complete all as specified and directed by Engineer-in-Charge. 6 Each
52 52 Disconnecting and taking down the'R' type compressor 1.5 TR for window /split AC as per existing make and Refixing the same with new one KARNA/Shri Ram industries including flushing, dehydration and gas changing complete all as specified and directed by Engineer-in-Charge. 5 Each
53 53 Disconnecting & taking down of window type AC of any make and Refixing the same after replacement of copper condenser coil including soldering/welding and commissioning complete all as specified and directed by Engineer-in-Charge. 3 Each
54 54 M&L for dismantling refrigerator/Deep freezer any capacity for servicing/ repair work dusting, thoroughly cleaning of interiors and components, lubrication of moving parts, providing proper insulation to peeled out/damaged portion, replacement of unserviceable parts/components, reassembling and testing complete all as specified and directed by Engineer-in-Charge.\nNote:- Components reqd to be replaced will be measured and paid separately 8 Each Job
55 55 Supply only the following parts/components of refrigerator/Deep Freezer of 165/190/215/315/450 Ltr capacity complete all as specified and directed by Engineer-in-Charge of the following items from 55.01 to 55.11\n
56 55.01 (a) Box type relay(Make: Ondfodd/Ranutrol) complete all as specified and directed by Engineer-in-Charge. 2 Each
57 55.02 (b) Thermostat with control knob complete all as specified and directed by Engineer-in-Charge.\nMake: Ondfodd/Ranutrol 3 Each
58 55.03 (c) Drier complete all as specified and directed by Engineer-in-Charge. 2 Each
59 55.04 (d) Condenser complete all as specified and directed by Engineer-in-Charge. 2 Each
60 55.05 (e) Copper capillary Tube complete all as specified and directed by Engineer-in-Charge. 10 RM
61 55.06 (f) Magnetic door gasket complete all as specified and directed by Engineer-in-Charge. 2 Each
62 55.07 (g) Chiller tray complete all as specified and directed by Engineer-in-Charge. 2 Each
63 55.08 (h) Chiller tray PVC complete all as specified and directed by Engineer-in-Charge. 2 Each
64 55.09 (j) Vegetable tray PVC complete all as specified and directed by Engineer-in-Charge. 2 Each
65 55.1 (k) Aluminium grill rack PVC Coated) complete all as specified and directed by Engineer-in-Charge. 2 Each
66 55.11 (l) Pigmy lamp 15W with screwed/Bayonet Cap complete all as specified and directed by Engineer-in-Charge. 2 Each
67 56 Supply only hermitically sealed compressor unit comprising of the compressor coupled with inbuilt AC single phase 230V motor and other standard compressor accessories complete for refrigerator of 165 ltr capacity complete all as specified and directed by Engineer-in-Charge.\nMake: Shriram/Kirloskar/Usha/Voltas/Godrej 1 Each
68 57 All as per item No. 56 here-in-above but refrigerator of 265/290 Ltr capacity complete all as specified and directed by Engineer-in-Charge. 1 Each
69 58 All as per item No 56 here-in-above but refrigerator of 315 to 450 Ltr capacity complete all as specified and directed by Engineer-in-Charge. 2 Each
70 59 M&L for flushing out refrigerant pipes, vacuuming the hermitically sealed compressor, charging of refrigerant in adequate quantity, connecting suction and discharge lines and conducting leakage test for refrigerator/deep freezer of any capacity complete all as specified and directed by Engineer-in-Charge. 3 Each Job
71 60 M&L for rewiring of refrigerator/Deep Freezer of any capacity using PVC insulated single core multistranded copper conductor cable of suitable size including thimbles complete all as specified and directed by Engineer-in-Charge. 2 Each Job
72 61 M&L for carrying out ‘B’ check including replacement of Fuel filter, Lube oil filter, Air filter, coolant and Engine oil for DG sets complete all as specified and directed by Engineer-in-Charge of following capacities:-\nNote: Engine oil will be paid in relevant item\n(a) DG set of capacity 200 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Greaves Cotton 1 Each
73 61.01 (b) DG set of capacity 110 KVA complete all as specified and directed by Engineer-in-Charge. \nMake Cummins 2 Each
74 61.02 (c) DG set of capacity 75 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar 2 Each
75 61.03 (d) DG set of capacity 62.5 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar 2 Each
76 61.04 (e) DG set of capacity 15 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar 2 Each
77 62 M&L for Replacement of U/S fan belt with new fan belt for DG set of following capacity as per manufacturer cat part.\n(a) DG set of capacity 200 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Greaves Cotton 1 Each
78 62.01 (b) DG set of capacity 110 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Cummins 1 Each
79 62.02 (c) DG set of capacity 75 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar 1 Each
80 62.03 (d) DG set of capacity 62.5 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar 1 Each
81 62.04 (e) DG set of capacity 15 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar 1 Each
82 63 S&F in replacement of solenoid switch suitable including all necessary arrangement for kirloskar CUMMINS Gen set of capacity 15 to 200 KVA complete all as specified and directed by Engineer-in-Charge. 2 Each
83 64 Supply only distilled water of best quality in 05 litrs sealed gallon packing complete all as specified and directed by Engineer-in-Charge. 35 Ltr
84 65 M&L for repairing of self starter of DG set capacity 15 KVA including transporting upto workshop to carry out necessary replacement of burnt copper winding with new copper winding/ coil of existing gauge from rotor and stator coil, cleaning of slots, dryings varnishing and proper insulating to winding complete all as specified and directed by Engineer-in-Charge.\nNote : (a) Necessary repair will be carry out within time period given by Engr-in-Charge otherwise a penalty of 500/- per day will be deducted from contractor due. \n(b) Contractor have to make temporary arrangement of starter for running of DG set of defective starter. 1 Each Job
85 66 All as per item No 65 above herein but DG Set of capacity 62.5 KVA complete all as specified and directed by Engineer-in-Charge. 1 Each Job
86 67 All as per item No 65 above herein but DG Set of capacity 75 KVA and upto 200 KVA complete all as specified and directed by Engineer-in-Charge. 1 Each Job
87 68 M&L for servicing of AMF panel of DG set of capacity upto to 75 KVA cleaning of AMF panel, rectification of defect rewiring replacement of D/S indicator with new indicator of complete AMF panel and replacement of U/S relays under respective item of this schedule complete all as specified and directed by Engineer-in-Charge. 1 Each Job
88 69 All as per item No 68 above herein but DG Set of capacity above 75 KVA and upto 200 KVA complete all as specified and directed by Engineer-in-Charge. 1 Each Job
89 70 M&L for Replacement to unserviceable batteries of 12 volts 180 AH with new batteries of 12 volts 180 AH maintenance free complete all as specified and directed by Engineer-in-Charge.\nMake Exide/Amaron \nNote: Rate for initial charging are included in unit rate 2 Each
90 71 Supply only Automatic voltage regulator relay 415V AC suitable for 15 KVA to 62.5 KVA DG Set complete all as specified and directed by Engineer-in-Charge. 1 Each
91 72 Supply only Automatic voltage regulator relay 415V AC suitable for 75 KVA to 200 KVA DG Set complete all as specified and directed by Engineer-in-Charge. 1 Each
92 73 Supply only Electronic timer 240V AC, adjustment time 6-120Sec complete all as specified and directed by Engineer-in-Charge. 1 Each
93 74 Supply only reverse power relay, 415V AC complete all as specified and directed by Engineer-in-Charge. 1 Each
94 75 S&F PVC insulate copper heavy duty 1 mtr long as battery lead suitable for batteries of capacity 24V 180AH complete all as specified and directed by Engineer-in-Charge. 2 Each
95 76 S&F in replacement of digital multi function meter to read voltage current and power factor including set of CT-1 each complete all as specified and directed by Engineer-in-Charge. 2 Each
96 77 S&F in replacement of indicating lamp RYB complete all as specified and directed by Engineer-in-Charge. 12 Each
97 78 S&F in replacement of Auto manual switch complete all as specified and directed by Engineer-in-Charge. 2 Each
98 79 S&F in replacement of push button switch red with element complete all as specified and directed by Engineer-in-Charge. 4 Each
99 80 S&F in replacement of push button switch green with element complete all as specified and directed by Engineer-in-Charge. 4 Each
100 81 S&F in replacement of four pole power contactor 415 Volts AC, 250 amps 2 NO-2 NC Make L&T/GE/Scgnider/ABB/Legrand complete all as specified and directed by Engineer-in-Charge. 1 Each
101 82 S&F in replacement of four pole power contactor 415 Volts AC,80 to 160 amps 2 NO-2 NC Make L&T/GE/Scgnider/ABB/Legrand complete all as specified and directed by Engineer-in-Charge. 1 Each
102 83 Supply and filling in sump/topping up engine oil, multi grade 20w40 in engine or relpacement of engine oil complete all as specified and directed by Engineer-in-Charge.\nMake :- Indian oil / Hindusthan petrolium / Castrol / Pride /Servo 45 Ltr
103 84 S&F in repair of Autocut Electrical Battery Charger 12V DC, 5 Amp Unit SMPS with Constant Voltage Output with Battery Charging Transformer and Moulded Type Rectifier Unit etc complete all as specified and directed by Engineer-in-Charge. 1 Each
104 85 All as per item No 83 above but Battary Charger 24V DC, 10 Amp complete all as specified and directed by Engineer-in-Charge. 1 Each
105 86 M&L for carrying out repair of complete DG set by taking each and every parts carefully carrying out necessary repairs in workshop including machining work of parts like of pump nozzle, turbo charger (reconditioning and servicing), head of DG set, cleaning and repairing of radiator, oil pump and refilling of coolant , engine oil as per requirement and guidelines of respective OEMs and replacement of following spares suitable for diesel engine (prime mover) of DG set of capacity 110 KVA to 200 KVA including testing complete all as specified and directed by Engineer-in-Charge of the following items from Ser No 86.01 to 86.16\n 1 Each Job
106 86.01 (a) Piston ring 6 Each
107 86.02 (b) Main Bearing 7 Each
108 86.03 (c) Piston 6 Each
109 86.04 (d) Packing Kit 1 Each
110 86.05 (e) 'O' ring 18 Each
111 86.06 (f) Liner 6 Each
112 86.07 (g) Exhaust valve 1 Each
113 86.08 (h) Inlet valve 1 Each
114 86.09 (j) Head gasket kit 6 Each
115 86.1 (k) CR Bearing 6 Each
116 86.11 (l) Diesel filter 2 Each
117 86.12 (m) Mashroom taper 6 Each
118 86.13 (n) Diesel pipe complete set 1 Set
119 86.14 (o) Air filter 1 Each
120 86.15 (p) Water pump 1 Each
121 86.16 (q) Fly wheel ring gear 1 Each
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail