Military Engineer Services-MES has published Repair Of Cooling Appliances Desert Cooler Window Type Split Type Deep Freezer Refrigerators Water Coolers And Repair Of Diesel Generator Sets Amf Panels And Connected Works At Af Station Chandinagar. Submission Date for this Tender is 28-03-2020. Diesel Generators Tenders in AF STATION CHANDINAGAR Haryana. Bidders can get complete Tender details and download the document.
Name of Work: REPAIR/MAINT OF COOLING APPLIANCES DESERT COOLER, WINDOW TYPE, SPLIT TYPE, DEEP FREEZER, REFRIGERATORS & WATER COOLERS AND REPAIR/MAINT OF DG SETS, AMF PANELS AND CONNECTED WORKS AT AF STATION CHANDINAGAR UNDER GE (AF) FARIDABAD | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | M&L for servicing of split type AC's of capacity 1.5 TR and 2 TR comprising of the following tasks installed at different locations including refixing, commissioning and testing complete all as specified and directed by Engineer-in-Charge. \n(a) Inspecting and checking the Indoor/outdoor units for noise free operation.\n(b) Checking the electrical connection for tightness\n(c) Cleaning the condenser with cleaning agent followed with pressurized water and cleaning the cooling coil with air blower.\n(d) Greasing/Oiling of condenser fan motor and blower motor.\n(e) Checking for any refrigerant leakage.\n(f) Checking for serviceability of remote control unit. | 10 | Each Job | |
2 | 2 | M&L for servicing and Maintenance of window type AC's of capacity 1.5 TR comprising of the following tasks at different locations including Refixing, commissioning and testing complete all as specified and directed by Engineer-in-Charge. \n(a) Inspecting, taking down, brushing cleaning with blower including acid/detergent wash of condenser and cooling coil.\n(b) Carry out operation of blower and compressor and ensure that satisfactory functioning of all parts.\n(c) Inspecting the leakage in the system.\n(d) Checking of the earth continuity of electrical parts.\n(e) Checking the functioning of thermostat.\n(f) Inspection of all electrical parts. | 10 | Each Job | |
3 | 3 | M&L for Servicing & maintenance of water coolers of any capacity comprising of the following tasks at different location complete all as specified and directed by Engineer-in-Charge.\n(a) Inspection, taking down, opening, dismantling, descaling, brushing cleaning of storage tanks\n(b) Examination water tightness, leak proof of storage tank after cleaning.\n(c) Carry out operation of all stop cock, push cock, float valve etc.\n(d) Inspect overflow and remove blockage if any.\n(e) Check and correct earth continuity of electric items\n(f) Check thermostat and test its functioning\n(g) Inspect drain pipe and remove blockage if any\n(h) Check and correct all electrical wiring & test its functioning\n(j) Testing of water cooler after repair. | 20 | Each Job | |
4 | 4 | S&F in replacement of starting relay for split type AC units of capacity 2 TR as required at site complete all as specified and directed by Engineer-in-Charge. \nMake-Sriram/Hi-Tech/Classic | 3 | Each | |
5 | 5 | S&F in replacement of starting capacitor 80-100/100-120 mfd for split type A/C's of capacity 2 TR complete all as specified and directed by Engineer-in-Charge.\nMake-Telsa | 5 | Each | |
6 | 6 | S&F in replacement of running capacitor 30/36 mfd for split type AC unit as required at Site and complete all as specified and directed by Engineer-in-Charge. | 5 | Each | |
7 | 7 | S&F in replacement of contactor, as per existing model, coil voltage 230V installed in split type AC units complete all as specified and directed by Engineer-in-Charge. \nMake- L&T/Siemen | 3 | Each | |
8 | 8 | Taking out and replacement of condenser fan motor incl bush/bearings of split type AC units capacity 1.5/2 TR complete all as specified and directed by Engineer-in-Charge. | 3 | Each Job | |
9 | 9 | All as per item No 8 above but for blower motor complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | |
10 | 10 | M&L for repair to PCB of split AC for remote operation complete testing and installation and all electrical connections complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | |
11 | 11 | Disconnecting and taking down old burnt compressor of capacity 2TR from split type AC unit and replacing the same with new one from the company as per existing model (suitable for CFC free refrigerent) complete all as specified and directed by Engineer-in-Charge. | 1 | Each Job | |
12 | 12 | Disconnecting and taking down old burnt compressor of capacity 1.5 TR from split type AC unit and replacing the same with new one from the company as per existing model (suitable for CFC free refrigerent) complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | |
13 | 13 | S&F in replacement of condensing coil of copper tubing suitable for 1.5 TR Spilt AC recharging of refrigerent as required making all necessary connection and testing for smooth funtioning complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | |
14 | 14 | S&F in replacement of condensing coil of copper tubing suitable for 2 TR Spilt AC recharging of refrigerent as required making all necessary connection and testing for smooth funtioning complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | |
15 | 15 | M&L for repair to leaking area of split type AC unit of capacity 2 /1.5 TR capacity including pressure testing, dehydration and gas charging complete all as specified and directed by Engineer-in-Charge. | 8 | Each Job | |
16 | 16 | S&F in replacmemt remote control unit (cordless) as per existing model for 2/1.5 TR split type A/C unit complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
17 | 17 | S&F in replacement of air filter for split type A/C units of capacity upto 2/1.5 TR as per sample complete all as specified and directed by Engineer-in-Charge. | 3 | Each | |
18 | 18 | M&L for providing insulation to copper tubing’s from Indoor to outdoor units with foam insulation followed with PVC flexible pipe 50mm with clamps complete all as specified and directed by Engineer-in-Charge. | 25 | RM | |
19 | 19 | S&F in replacement 3 core copper PVC insulated of size 70/.0076 complete all as specified and directed by Engineer-in-Charge. \nMake: Plaza/Kalinga | 30 | RM | |
20 | 20 | Supply and charging gas CFC free to AC 1.5/2 TR capacity complete all as specified and directed by Engineer-in-Charge. | 5 | Kg | |
21 | 21 | S&F in replacement of copper tubing 3/8” outer dia suitable for 1.5/2 TR AC including nitril rubber thermal insulation capacity complete all as specified and directed by Engineer-in-Charge. | 30 | RM | |
22 | 22 | All as per item above but here in before 5/8” outer dia complete all as specified and directed by Engineer-in-Charge. | 20 | RM | |
23 | 23 | S&F in replacement of thermostat switch as required at site complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
24 | 24 | S&F 3.15 mfd for fan motor capacitor complete all as specified and directed by Engineer-in-Charge. | 5 | Each | |
25 | 25 | S&F in replacement of overload protector for compressor as reqd at site complete as specified and directed by Engineer-in-charge. | 5 | Each | |
26 | 26 | S&F in replacement of starting relay as required at site for water coolers complete including connecting, testing complete all as specified and directed by Engineer-in-Charge. | 5 | Each | |
27 | 27 | S&F in replacement of waste water tray as required at site made out of 20 gauge GI sheet complete with PVC drain pipe including painting with PVC drain pipe including painting with aluminum paint complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
28 | 28 | S&F in replacement of brass float valves accessories 15mm size as required at site complete all as specified and directed by Engineer-in-Charge. | 3 | Each | |
29 | 29 | Disconnecting & taking out compressor ('R' type) from water cooler and refixing the same after repair including flushing dehydration and gas charging complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | |
30 | 30 | Disconnecting and taking down water cooler of any make and size for repairs including detection of leakage in the system rectifying the same, dehydration & recharging of gas testing the water cooler for smooth & satisfactoryworking complete all as specified and directed by Engineer-in-Charge. | 3 | Each | |
31 | 31 | S&F in replacement of CP push cock ISI marked 15mm base complete all as specified and directed by Engineer-in-Charge. | 5 | Each | |
32 | 32 | S&F in replacement of CP Bib taps, cast copper alloy with crutch or butterfly handle, screwed down, screwed for iron pipe or for brass ferrule and fixed complete all as per specified and directed by Engineer-in-Charge. | 10 | Each | |
33 | 33 | S&F in replacement of starting capacitor 100/120 mfd for compressor complete all as specified and directed by Engineer-in-Charge. | 5 | Each | |
34 | 34 | S&F in replacement of new condenser motor single phase of 1/16 HP as required at site for water cooler with clamps, bolts, nuts & rubber bushes complete including connecting testing complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
35 | 35 | S&F in replacement of Mini DP MCB with enclosure including MCB 06-32 Amps complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
36 | 36 | M&L for repair to rusted body of water cooler as directed at site by replacing M.S sheet 18 SWG and fixing new sheet by remitting/gas welding and replacement of angle iron complete all as specified and directed by Engineer-in-Charge. | 12 | Each Job | |
37 | 37 | Taking down desert cooler of any size by disconnecting electrical supply, cleaning, oiling of all moving part of pumps and fans, Replacing PVC pipes, nozzles, distributors, , checking electrical connections complete all as specified and directed by Engineer-in-Charge. | 100 | Each | |
38 | 38 | S&F in replacement of wood pads (set of three) as per sample complete all as specified and directed by Engineer-in-Charge.\nMake KHAITAN/CROMPTON | 100 | Each | |
39 | 39 | S&F in replacement the new desert cooler pump including testing for proper functioning complete all as specified and directed by Engineer-in-Charge.\nMake KHAITAN/CROMPTON | 45 | Each | |
40 | 40 | S&F Desert cooler motor copper wound complete all as specified and directed by Engineer-in-Charge. | 45 | Each | |
41 | 41 | S&F in replacement the new exhaust fan with kit 450mm sweep complete all as specified and directed by Engineer-in-Charge.\nMake: Khaitan/Elpar | 45 | Each | |
42 | 42 | S&F in replacement new body of desert cooler as per sample duly painted of 20 SWG sheet with 22 SWG flops, front grill, PVC pipe, nozzle, distributor and nut bolts washers for fixing fan clamps, complete all as specified and directed by Engineer-in-charge. | 10 | Each | |
43 | 43 | Supply and fixing front grill of desert cooler as per sample complete all as specified and directed by Engineer-in-Charge. | 45 | Each | |
44 | 44 | S&F in replacement plug top 5 Amps complete all as specified and directed by Engineer-in-Charge. | 30 | Each | |
45 | 45 | M&L Scrapping old paint and painting of desert cooler with one coats of red oxide inside and two coat of synthetic enamel paint( in/ou tside) complete all as specified and directed by Engineer-in-Charge. | 100 | Each | |
46 | 46 | M&L for fixing plastic laminated sheet milky 3mm thick for closing window opening hole for fixing of desert cooler at any floor level complete all as specified and directed Engineer-in-charge. | 4 | Each | |
47 | 47 | S&F in replacement of running capacitor 6 mfd for blower motor as required at site complete all as specified and directed by Engineer-in-Charge.\nMake -EPCOS/Asian/Havells | 15 | Each | |
48 | 48 | S&F in replacement selector switch as required at site and complete all as specified and directed by Engineer-in-Charge. | 5 | Each | |
49 | 49 | S&F in replacement of rotary switch as requirement at site complete all as specified and directed by Engineer-in-Charge. | 7 | Each | |
50 | 50 | S&F in replacement of new blower motor 1/6 HP as required at site single phase 230 volts double shaft with clamp bolts, nuts and rubber bushes including testing & commissioning complete all as specified and directed by Engineer-in-Charge. | 3 | Each | |
51 | 51 | S&F in replacement of thermostats as required at site complete for window type AC 1.5 /2 TR complete all as specified and directed by Engineer-in-Charge. | 6 | Each | |
52 | 52 | Disconnecting and taking down the'R' type compressor 1.5 TR for window /split AC as per existing make and Refixing the same with new one KARNA/Shri Ram industries including flushing, dehydration and gas changing complete all as specified and directed by Engineer-in-Charge. | 5 | Each | |
53 | 53 | Disconnecting & taking down of window type AC of any make and Refixing the same after replacement of copper condenser coil including soldering/welding and commissioning complete all as specified and directed by Engineer-in-Charge. | 3 | Each | |
54 | 54 | M&L for dismantling refrigerator/Deep freezer any capacity for servicing/ repair work dusting, thoroughly cleaning of interiors and components, lubrication of moving parts, providing proper insulation to peeled out/damaged portion, replacement of unserviceable parts/components, reassembling and testing complete all as specified and directed by Engineer-in-Charge.\nNote:- Components reqd to be replaced will be measured and paid separately | 8 | Each Job | |
55 | 55 | Supply only the following parts/components of refrigerator/Deep Freezer of 165/190/215/315/450 Ltr capacity complete all as specified and directed by Engineer-in-Charge of the following items from 55.01 to 55.11\n | |||
56 | 55.01 | (a) Box type relay(Make: Ondfodd/Ranutrol) complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
57 | 55.02 | (b) Thermostat with control knob complete all as specified and directed by Engineer-in-Charge.\nMake: Ondfodd/Ranutrol | 3 | Each | |
58 | 55.03 | (c) Drier complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
59 | 55.04 | (d) Condenser complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
60 | 55.05 | (e) Copper capillary Tube complete all as specified and directed by Engineer-in-Charge. | 10 | RM | |
61 | 55.06 | (f) Magnetic door gasket complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
62 | 55.07 | (g) Chiller tray complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
63 | 55.08 | (h) Chiller tray PVC complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
64 | 55.09 | (j) Vegetable tray PVC complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
65 | 55.1 | (k) Aluminium grill rack PVC Coated) complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
66 | 55.11 | (l) Pigmy lamp 15W with screwed/Bayonet Cap complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
67 | 56 | Supply only hermitically sealed compressor unit comprising of the compressor coupled with inbuilt AC single phase 230V motor and other standard compressor accessories complete for refrigerator of 165 ltr capacity complete all as specified and directed by Engineer-in-Charge.\nMake: Shriram/Kirloskar/Usha/Voltas/Godrej | 1 | Each | |
68 | 57 | All as per item No. 56 here-in-above but refrigerator of 265/290 Ltr capacity complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
69 | 58 | All as per item No 56 here-in-above but refrigerator of 315 to 450 Ltr capacity complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
70 | 59 | M&L for flushing out refrigerant pipes, vacuuming the hermitically sealed compressor, charging of refrigerant in adequate quantity, connecting suction and discharge lines and conducting leakage test for refrigerator/deep freezer of any capacity complete all as specified and directed by Engineer-in-Charge. | 3 | Each Job | |
71 | 60 | M&L for rewiring of refrigerator/Deep Freezer of any capacity using PVC insulated single core multistranded copper conductor cable of suitable size including thimbles complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | |
72 | 61 | M&L for carrying out ‘B’ check including replacement of Fuel filter, Lube oil filter, Air filter, coolant and Engine oil for DG sets complete all as specified and directed by Engineer-in-Charge of following capacities:-\nNote: Engine oil will be paid in relevant item\n(a) DG set of capacity 200 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Greaves Cotton | 1 | Each | |
73 | 61.01 | (b) DG set of capacity 110 KVA complete all as specified and directed by Engineer-in-Charge. \nMake Cummins | 2 | Each | |
74 | 61.02 | (c) DG set of capacity 75 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar | 2 | Each | |
75 | 61.03 | (d) DG set of capacity 62.5 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar | 2 | Each | |
76 | 61.04 | (e) DG set of capacity 15 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar | 2 | Each | |
77 | 62 | M&L for Replacement of U/S fan belt with new fan belt for DG set of following capacity as per manufacturer cat part.\n(a) DG set of capacity 200 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Greaves Cotton | 1 | Each | |
78 | 62.01 | (b) DG set of capacity 110 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Cummins | 1 | Each | |
79 | 62.02 | (c) DG set of capacity 75 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar | 1 | Each | |
80 | 62.03 | (d) DG set of capacity 62.5 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar | 1 | Each | |
81 | 62.04 | (e) DG set of capacity 15 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar | 1 | Each | |
82 | 63 | S&F in replacement of solenoid switch suitable including all necessary arrangement for kirloskar CUMMINS Gen set of capacity 15 to 200 KVA complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
83 | 64 | Supply only distilled water of best quality in 05 litrs sealed gallon packing complete all as specified and directed by Engineer-in-Charge. | 35 | Ltr | |
84 | 65 | M&L for repairing of self starter of DG set capacity 15 KVA including transporting upto workshop to carry out necessary replacement of burnt copper winding with new copper winding/ coil of existing gauge from rotor and stator coil, cleaning of slots, dryings varnishing and proper insulating to winding complete all as specified and directed by Engineer-in-Charge.\nNote : (a) Necessary repair will be carry out within time period given by Engr-in-Charge otherwise a penalty of 500/- per day will be deducted from contractor due. \n(b) Contractor have to make temporary arrangement of starter for running of DG set of defective starter. | 1 | Each Job | |
85 | 66 | All as per item No 65 above herein but DG Set of capacity 62.5 KVA complete all as specified and directed by Engineer-in-Charge. | 1 | Each Job | |
86 | 67 | All as per item No 65 above herein but DG Set of capacity 75 KVA and upto 200 KVA complete all as specified and directed by Engineer-in-Charge. | 1 | Each Job | |
87 | 68 | M&L for servicing of AMF panel of DG set of capacity upto to 75 KVA cleaning of AMF panel, rectification of defect rewiring replacement of D/S indicator with new indicator of complete AMF panel and replacement of U/S relays under respective item of this schedule complete all as specified and directed by Engineer-in-Charge. | 1 | Each Job | |
88 | 69 | All as per item No 68 above herein but DG Set of capacity above 75 KVA and upto 200 KVA complete all as specified and directed by Engineer-in-Charge. | 1 | Each Job | |
89 | 70 | M&L for Replacement to unserviceable batteries of 12 volts 180 AH with new batteries of 12 volts 180 AH maintenance free complete all as specified and directed by Engineer-in-Charge.\nMake Exide/Amaron \nNote: Rate for initial charging are included in unit rate | 2 | Each | |
90 | 71 | Supply only Automatic voltage regulator relay 415V AC suitable for 15 KVA to 62.5 KVA DG Set complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
91 | 72 | Supply only Automatic voltage regulator relay 415V AC suitable for 75 KVA to 200 KVA DG Set complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
92 | 73 | Supply only Electronic timer 240V AC, adjustment time 6-120Sec complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
93 | 74 | Supply only reverse power relay, 415V AC complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
94 | 75 | S&F PVC insulate copper heavy duty 1 mtr long as battery lead suitable for batteries of capacity 24V 180AH complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
95 | 76 | S&F in replacement of digital multi function meter to read voltage current and power factor including set of CT-1 each complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
96 | 77 | S&F in replacement of indicating lamp RYB complete all as specified and directed by Engineer-in-Charge. | 12 | Each | |
97 | 78 | S&F in replacement of Auto manual switch complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
98 | 79 | S&F in replacement of push button switch red with element complete all as specified and directed by Engineer-in-Charge. | 4 | Each | |
99 | 80 | S&F in replacement of push button switch green with element complete all as specified and directed by Engineer-in-Charge. | 4 | Each | |
100 | 81 | S&F in replacement of four pole power contactor 415 Volts AC, 250 amps 2 NO-2 NC Make L&T/GE/Scgnider/ABB/Legrand complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
101 | 82 | S&F in replacement of four pole power contactor 415 Volts AC,80 to 160 amps 2 NO-2 NC Make L&T/GE/Scgnider/ABB/Legrand complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
102 | 83 | Supply and filling in sump/topping up engine oil, multi grade 20w40 in engine or relpacement of engine oil complete all as specified and directed by Engineer-in-Charge.\nMake :- Indian oil / Hindusthan petrolium / Castrol / Pride /Servo | 45 | Ltr | |
103 | 84 | S&F in repair of Autocut Electrical Battery Charger 12V DC, 5 Amp Unit SMPS with Constant Voltage Output with Battery Charging Transformer and Moulded Type Rectifier Unit etc complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
104 | 85 | All as per item No 83 above but Battary Charger 24V DC, 10 Amp complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
105 | 86 | M&L for carrying out repair of complete DG set by taking each and every parts carefully carrying out necessary repairs in workshop including machining work of parts like of pump nozzle, turbo charger (reconditioning and servicing), head of DG set, cleaning and repairing of radiator, oil pump and refilling of coolant , engine oil as per requirement and guidelines of respective OEMs and replacement of following spares suitable for diesel engine (prime mover) of DG set of capacity 110 KVA to 200 KVA including testing complete all as specified and directed by Engineer-in-Charge of the following items from Ser No 86.01 to 86.16\n | 1 | Each Job | |
106 | 86.01 | (a) Piston ring | 6 | Each | |
107 | 86.02 | (b) Main Bearing | 7 | Each | |
108 | 86.03 | (c) Piston | 6 | Each | |
109 | 86.04 | (d) Packing Kit | 1 | Each | |
110 | 86.05 | (e) 'O' ring | 18 | Each | |
111 | 86.06 | (f) Liner | 6 | Each | |
112 | 86.07 | (g) Exhaust valve | 1 | Each | |
113 | 86.08 | (h) Inlet valve | 1 | Each | |
114 | 86.09 | (j) Head gasket kit | 6 | Each | |
115 | 86.1 | (k) CR Bearing | 6 | Each | |
116 | 86.11 | (l) Diesel filter | 2 | Each | |
117 | 86.12 | (m) Mashroom taper | 6 | Each | |
118 | 86.13 | (n) Diesel pipe complete set | 1 | Set | |
119 | 86.14 | (o) Air filter | 1 | Each | |
120 | 86.15 | (p) Water pump | 1 | Each | |
121 | 86.16 | (q) Fly wheel ring gear | 1 | Each |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail