Indian Oil Corporation Limited-IOCL has published Modification Of Top Crown Of 1400 Mt Horton Spheres For Installation Of Radar Gauge And Temperature Transmitter At Indane Bottling Plant , Budge Budge. Submission Date for this Tender is 14-05-2020. Temperature Transmitters Tenders in Budge Budge LPG Bottling PLant West Bengal. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 28-Mar-2020 | Bid submission date extension | Date | 16-04-2020 |
2 | 15-Apr-2020 | Bid submission time extension | Date | 05-05-2020 |
3 | 02-May-2020 | Tender submission Time extension | Date | 14-05-2020 |
Name of Work:Modification of top crown of Horton Spheres for Installation of Radar Gauge and Temperature Transmitter at Indane Bottling Plant, Budge Budge | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Supply ,TPI and Installation of 6” SA 333 Gr6\nSch 80 Pipe with 300# WNRF Flange and\nStud Nuts with Gasket | BI01010001010000000000000515BI0100001113 | 1 | Nos |
2 | 2 | Supply, TPI and Installation of 3” SA 333 Gr 6\nSch 80 Pipe with 300# WNRF SA 350 LF2\nFalnge with stud nuts and gasket | BI01010001010000000000000515BI0100001118 | 1 | Nos |
3 | 3 | Supply , TPI and Installation of 4” SS 304 Sch\n10S Perforated Pipe along with internal\narrangement for holding Pipe at the\nbottom of the Sphere | BI01010001010000000000000515BI0100001122 | 18 | Mtr |
4 | 4 | Supply , TPI and Installation of 3” SS 304 Sch\n10S Perforated Pipe along with internal\narrangement for holding Pipe at the\nbottom of the Sphere | BI01010001010000000000000515BI0100001123 | 18 | Mtr |
5 | 5 | Supply and Installation of Scaffolding\nMaterial and GI Sheets for Fire Screen\nArrangement and Internal Scaffolding for\nHot work | BI01010001010000000000000515BI0100001125 | 1 | SU |
6 | 6 | PESO Approval for start of Hot work and\nCommissioning Approval after successful\ncompletion of Hot Work | 1 | SU | |
7 | 7 | Supply of Consumables and Machinery\nalong with Electrical cables and FLP lights\nfor successful completion of the hot work\njob. | 1 | SU | |
8 | 8 | NDT of Hot work area for modification of\nSphere including UT, RT and SR or newly\nweld joints. | 1 | SU | |
9 | 9 | Third Party Inspection agency expenses\nfor Drawing Appraisal and Witness of Hot\nwork job and related NDT including\nRadiography and Stress Relieving and\nwitnessing hydrotest of Sphere and\nproviding general certificate to that\neffect. | BI01010001010000000000000515BI0100001126 | 1 | SU |
10 | 10 | Labor Charges for the above work\nincluding Modification (hot work),Degassing,Disconnection of inlet,Outlet,Cleaning,\nScaffolding,Inspection, Hydro testing and\nCommissioning | BI01010001010000000000000515BI0100001128 | 1 | SU |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail