Cc Construction Work In Vill Kaili On Dadri To Rardhna Momeen Faridpur Kheda Through Rardhna Bridge
Tender Overview
Project Description
Cc Construction Work In Vill Kaili On Dadri To Rardhna Momeen Faridpur Kheda Through Rardhna Bridge
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 16-Mar-2020 | date extend | Date | 25-Mar-2020 |
| 2 | 25-Mar-2020 | date change | Date | 15-Apr-2020 |
BOQ
| Name of Work: ????? ?? ??????? ????? ??????? ????? ???? ??? ??????? ??? ?? ????? (?0??0??0) ?? ????? ???? ??? ??0??0 ??????? ?? ?????? | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Construction of un-reinforced, excluding dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clausev1501.2.2 (1:1.5:3) coarse and fine aggregate confirming to IS 383 maximum size of coarse aggregate not exceeding 25mm, mixed i a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates icluding levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrator and finished in continous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, dowel bars, near approaches to bridge/ culvert and construction, joint, admixture as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and Dowel bar and also including complete shifting of materials & Concrete etc. S.I. New Item 9 (including cost of all material, labour, T&P, royality, labourcess etc complete but excluding GST). | BI01010001010000000000000515BI0100001113 | 412 | Cum |
| 2 | 2 | (a) Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. (Royality removed by Govt) for small works/ Abadi area. (where machine can not move ) As per SI No. 253 (including cost of all material, labour, T&P, royality, labourcess etc complete but excluding GST). | BI01010001010000000000000515BI0100001114 | 300 | Cum |
| 3 | 3 | Excavation in foundation in ordinary soil including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M.As per SOR Sl.No. 251 (including cost of all material, labour, T&P, royality, labourcess etc complete but excluding GST). | BI01010001010000000000000515BI0100001115 | 99 | Cum |
| 4 | 4 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. \nBut in proportion of 8:4:1 stone ballast coarse sand and cement As per SI No. 281 (including cost of all material, labour, T&P, royality, labourcess etc complete but excluding GST). | BI01010001010000000000000515BI0100001116 | 18 | Cum |
| 5 | 5 | M-150 Brick Work in 1:4 (One cement & four coarse sand) mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. As per SOR SI.No. 305 (a) (including cost of all material, labour, T&P, royality, labourcess etc complete but excluding GST). | BI01010001010000000000000515BI0100001117 | 41 | Cum |
| 6 | 6 | Cement Concrete with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. As per SOR SI.No. 279(a) (including cost of all material, labour, T&P, royality, labourcess etc complete but excluding GST). | BI01010001010000000000000515BI0100001118 | 5 | Cum |
| 7 | 7 | 12 mm thick plaster with cement and fine sand of 1.25 fineness modules in 1:3 over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. As per SOR SI.No. 582 (including cost of all material, labour, T&P, royality, labourcess etc complete but excluding GST). | BI01010001010000000000000515BI0100001119 | 180 | Sqm |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender