| 1 | 1 | Survey including preparation of schedule of materials marking of location ( route length) gps survey of line with co ordinates of each tower | BI01010001010000000000000515BI0100001119 | 1 | Job |
|---|
| 2 | 2 | Survey & check survey & peg marking | BI01010001010000000000000515BI0100001120 | 1 | Job |
|---|
| 3 | 3 | Cost of excavation of 132kv Tower foundation pits including all earth work, back filling ,watering and leveling for DA+5 - 01Nos, DB+05 – 02No, DC+15 – 02No. | BI01010001010000000000000515BI0100001121 | 841 | M3 |
|---|
| 4 | 4 | Cost of concreting for following 132kv FS foundation including cost of cement dewatering shoring and shuttering, forming, curing but excluding cost of reinforcement bars with 1:2:4 mix concrete DA+5 - 01Nos, DB+05 – 02No, DC+15 – 02No. | BI01010001010000000000000515BI0100001122 | 185 | M3 |
|---|
| 5 | 5 | Installation of steel reinforcement bars in RCC foundation including cost of cutting,bending,binding and placing them in foundation pits DA+5 - 01Nos, DB+05 – 02No, DC+15 – 02No. | BI01010001010000000000000515BI0100001123 | 0.9 | MT |
|---|
| 6 | 6 | Setting of stubs including all foundation work but excluding the cost of concreting and excavation.The job includes providing templates/probseting arrangement by the contractor. | BI01010001010000000000000515BI0100001124 | | |
|---|
| 7 | 6.1 | (I) DA+0/DA+5 | BI01010001010000000000000515BI0100001125 | 1 | Nos |
|---|
| 8 | 6.2 | (II) DB+0/DB+5 | BI01010001010000000000000515BI0100001126 | 2 | Nos |
|---|
| 9 | 6.3 | (III)DC+15 | BI01010001010000000000000515BI0100001127 | 2 | Nos |
|---|
| 10 | 6.4 | De-stringing of old conductor from tower location 50–51 of all 3 phases and earth wire. | BI01010001010000000000000515BI0100001128 | 2.65 | Km. |
|---|
| 11 | 7 | Dismantling of 04 Nos of A/B/C type tower& Gantry of 132kv Bharthana-Auriaya line | BI01010001010000000000000515BI0100001129 | 12 | MT |
|---|
| 12 | 8 | Erection superstructure of 132 tower as below and there extensions wherever required including all work above ground level excluding hoisting of insulator hardwares & accessories but including fitting of danger number phase plate and fixing & punching DA+5 - 01Nos, DB+05 – 02No, DC+15 – 02No. | BI01010001010000000000000515BI0100001130 | 44 | MT |
|---|
| 13 | 9 | Tack welding of all the bolts up to the height of bottom of the tower from ground level for DA+0- 02 Nos, DA+5 - 02 Nos ,DB+0- 02 Nos, DB+05 – 04 Nos, DC+0 - 03 Nos, DC+5 – 05 Nos, DC+15 – 02 Nos, BTM- 12 Nos. | BI01010001010000000000000515BI0100001131 | 1400 | Nos |
|---|
| 14 | 10 | Laying, stringing, tensioning, clamping, jointing etc to ACSR panther conductor including hoisting of insulators fitting of all necessary hardwares and accessories i.e. fittings, armor rods, vibration damper etc on all phase betweentower location no 82-110 | BI01010001010000000000000515BI0100001132 | 1.8 | Km. |
|---|
| 15 | 11 | Laying, stringing, tensioning, clamping, jointing etc to ACSR panther conductor including hoisting of insulators fitting of all necessary hardwares and accessories i.e. fittings, armor rods, vibration damper etc on all 06 phasesbetweentower location no 86-86A | BI01010001010000000000000515BI0100001133 | 0.24 | Km. |
|---|
| 16 | 12 | Laying stringing, tensioning, clamping, jointing etc 7/10 SWG of E/Wire including fitting of all necessary hardwares and accessories between tower location no82-110 | BI01010001010000000000000515BI0100001134 | 1.8 | Km. |
|---|
| 17 | 13 | Earthing of new towers/Gantry including earth work etc for pipe type earthing including cost of coke and salt as per technical specifications | BI01010001010000000000000515BI0100001135 | 10 | Nos |
|---|
| 18 | 14 | Shifting of all dismantalled material(i.e tower parts,conductor,earthwire and its accessories etc.) from site to store using private vehicle including loading unloading and proper stacking of material. The job includes all man, material & T&P required to complete the job satisfactorily. | BI01010001010000000000000515BI0100001136 | 1 | Job |
|---|