Overhauling Of Critical Pumps Of Power House , Cwph And Cooling Towers Of Unit-1 To 10, CPP, NALCO, ANGUL-Odisha

National Aluminium Company Limited-NALCO has published Overhauling Of Critical Pumps Of Power House , Cwph And Cooling Towers Of Unit-1 To 10. Submission Date for this Tender is 10-04-2020. Cooling Tower Tenders in CPP, NALCO, ANGUL Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

23970970
Overhauling Of Critical Pumps Of Power House , Cwph And Cooling Towers Of Unit-1 To 10
Open Tender
Indian
Odisha
CPP, NALCO, ANGUL
10-04-2020

Tender Details

Overhauling Of Critical Pumps Of Power House , Cwph And Cooling Towers Of Unit-1 To 10 , O/H Of 16Fc Valve Of Cooling Tower , As Per Scope Of Work . , Repl . Of Defective Weldment Of Sr-36 Gea , As Per Scope Of Work . , Repl . Of Ct 1-6 Fan Assy , As Per Scope Of Work . , Repl . Of Driveshaft Of Ct 1-6 Fan , As Per Scope Of Work . , Changing Of D . S . Rubber Bush ( 1-6 ) , As Per Scope Of Work . , Fan Blade End Clearance And Pitch ( 1-6 ) , As Per Scope Of Work . , Elimination Of Endplay Of Sr-36 Gearbox , As Per Scope Of Work . , Sr-36 Gearbox Input Shaft Oilseal Changi , As Per Scope Of Work . , Sr-36 Gearbox Output Shaft O Ring , As Per Scope Of Work . , Driveshaft Alignment Of Sr-36 Gearbox , As Per Scope Of Work . , Misc . Welding Jobs In Ct 1-6 , As Per Scope Of Work . , Misc . Cutting Jobs In Ct 1-6 , As Per Scope Of Work . , O/H Of Boiler Feed Pump , As Per Scope Of Work . , Mechanical Seal Replacement Of Bfp , As Per Scope Of Work . , Cartridge Repl . /Discharge O-Ring Replace , As Per Scope Of Work . , Alignment , Coupling & Trial Run Of The Pu , As Per Scope Of Work . , Bearing Inspection Of Bfp , As Per Scope Of Work . , O/H Of Booster Pump , As Per Scope Of Work . , M . Seal /S . Box Gasket Replacement Of Bp , As Per Scope Of Work . , Alignment , Coupling & Trail Run Of Bp , As Per Scope Of Work . , Bearing Inspection Of Bp , As Per Scope Of Work . , Dismantling Of B . Pump And Re-Assembly , As Per Scope Of Work . , O/H Condensate Extraction Pump , As Per Scope Of Work . , Stage Body Dismantling And Re-Assembly , As Per Scope Of Work . , Alignment , Coupling & Trail Run Of Cep , As Per Scope Of Work . , S . Box Sleeve Repl . And Brg . Inspection , As Per Scope Of Work . , Gland Replacement Of Cep , As Per Scope Of Work . , O/H Of Cw Pump , As Per Scope Of Work . , Tbh Inspection/Repl . Of Cw Pump , As Per Scope Of Work . , Stuf . Box Inspection/Repl . Of Cw Pump , As Per Scope Of Work . , Alignment , Coupling & Trail Run Of Cw Pum , As Per Scope Of Work . , Gland Replacement Oof Cw Pump , As Per Scope Of Work . , O/H Of Acw Pump , As Per Scope Of Work . , Tbh Inspection/Repl . Of Acw Pump , As Per Scope Of Work . , Stuf . Box Inspection/Repl . Of Acw Pump , As Per Scope Of Work . , Alignment , Coupling & Trail Run Of Acw Pu , As Per Scope Of Work . , Gland Replacement Of Acw Pump , As Per Scope Of Work . , O/H Of Fire Fighting Pump , As Per Scope Of Work . , Tbh Inspection/Repl . Of F/F Pump , As Per Scope Of Work . , Stuf . Box Inspection/Repl . Of F/F Pump , As Per Scope Of Work . , Alignment , Coupling & Trail Run Of F/F Pu , As Per Scope Of Work . , Gland Replacement Of F/F Pump , As Per Scope Of Work . , Stage Body Dismantling And Re-Assembly , As Per Scope Of Work . , O/H Of C . T . Pump , As Per Scope Of Work . , Tbh Inspection/Repl . Of Ct Pump , As Per Scope Of Work . , Alignment , Coupling & Trail Run Of Ct Pum , As Per Scope Of Work . , Gland Replacement Of Ct Pump , As Per Scope Of Work . , Dismantling And Re-Assembly Of Ct Pump , As Per Scope Of Work . , Synthetic Enamel Painting Of P . H . , As Per Scope Of Work . , Chloro Rubber Painting Of Ct 1-6 , As Per Scope Of Work . , Repl . Of Damaged Target Nozzles Of Ct , As Per Scope Of Work . , O/H Of Aux . Aop/Eop/Mop , As Per Scope Of Work . , Insp . /Repl . Of Coupling Bushes Of Aop/Eo , As Per Scope Of Work . , Insp/Repl . Of Bearings Aop/Eop/Mop , As Per Scope Of Work . , O/H Of Jacking Oil Pump , As Per Scope Of Work . , Repl . Of Cw/Acw Outlet Bfv , As Per Scope Of Work . , Overhauling Of Cw/Acw Bfv , As Per Scope Of Work . , Replacement Of 400Nb Pipe , As Per Scope Of Work . , Pm Of 20/5T Cwph Crane , As Per Scope Of Work . , Repl . Of Cw Inter-Connection Valve , As Per Scope Of Work . , O/H Of Sluice Gate At Ct Discharge , As Per Scope Of Work . , Repl . Of Cw/Acw R . E . Joint , As Per Scope Of Work . , Overhauling Of Dmcw/Boiler Fill Pump , As Per Scope Of Work . , O/H Of 18Fc Valve Of Cooling Tower ( Uni , As Per Scope Of Work . , Repl . Of Defective Weldment Of Gear Box , As Per Scope Of Work . , Repl . Of Cooling Tower Fan Assy . ( Unit 7 , As Per Scope Of Work . , Repl . Of Driveshaft Of Coolingtower Fan ( , As Per Scope Of Work . , Changing Of Neoprene Bonded Rubber ( Uni , As Per Scope Of Work . , Fan Blade End Clearance And Pitch ( Unit , As Per Scope Of Work . , Elimination Of End Play Of Gearbox Sr-3 , As Per Scope Of Work . , Gearbox Sr-32 Input Shaft Oilseal Changi , As Per Scope Of Work . , Gearbox Sr -32 Output Shaft O Ring ( U , As Per Scope Of Work . , Driveshaft Alignment At Gearbox Sr-32 ( U , As Per Scope Of Work . , Misc . Welding Jobs In Cooling Tower ( Un , As Per Scope Of Work . , Misc . Cutting Jobs In Cooling Tower ( Uni , As Per Scope Of Work . , O/H Of Cooling Water Pump At Rcph . , As Per Scope Of Work . , Tbh Inspection/Repl . Of Cw Pumps At Rcph , As Per Scope Of Work . , Stuf . Box Inspection/Repl . Rcph , As Per Scope Of Work . , Alignment , Coupling & Trail Run Of Cw Pum , As Per Scope Of Work . , Gland Replacement Of Cw P/P At Rcph , As Per Scope Of Work . , O/H Of Aux . Cooling Water Pump At Rcph . , As Per Scope Of Work . , Tbh Inspection/Repl . Of Acw P/P At Rcph , As Per Scope Of Work . , Stuf . Box Inspection/Repl . Rcph , As Per Scope Of Work . , Alignment , Coupling & Trail Run Of Acw P , As Per Scope Of Work . , Gland Replacement Of Acw P/P At Rcph , As Per Scope Of Work . , O/H Of Firefighting Pump At Rcph , As Per Scope Of Work . , Tbh Inspection/Repl . Of F/F Pump At Rcph , As Per Scope Of Work . , Stuf . Box Inspection/Repl . Of F/F Pump At , As Per Scope Of Work . , Alignment , Coupling & Trail Run Of F/F Pu , As Per Scope Of Work . , Gland Replacementof F/F Pump At Rcph , As Per Scope Of Work . , Stage Body Dismantling And Re-Assembly R , As Per Scope Of Work . , Synthetic Enamel Painting Cooling Tower , As Per Scope Of Work . , Chloro Rubber Painting At Cooling Tower , As Per Scope Of Work . , Repl . Of Damaged Target Nozzles Of Ct ( Un , As Per Scope Of Work . , Repl . Of Cw/Acw Outlet Bfv At Rcph . , As Per Scope Of Work . , Overhauling Of Cw/Acw Bfv At Rcph . , As Per Scope Of Work . , Replacement Of 400Nb Pipe Ct ( Unit 7 -10 , As Per Scope Of Work . , Pm , & Loadtesting Of 25/5T Crane At Rcph , As Per Scope Of Work . , Repl . Of Rcph Cw Inter-Connection Valve , As Per Scope Of Work . , O/H Of Sluice Gate At Ct Discharge Uni , As Per Scope Of Work . , Repl . Of Cw/Acw R . E . Joint At Rcph . , As Per Scope Of Work . , O/H Of Intake Pump , As Per Scope Of Work . , Tbh Inspection/Repl . Of Ip . , As Per Scope Of Work . , Stuf . Box Inspection/Repl . Of I . Pump . , As Per Scope Of Work . , Alignment , Coupling & Trail Run Of I . Pump , As Per Scope Of Work . , Gland Replacement Of I . Pump . , As Per Scope Of Work . , Overhauling Of Voithhydrocoupling Of Bfp , As Per Scope Of Work . , Servicing Of Nrv ( 600Nb ) Of Acw Pump , As Per Scope Of Work . , Servicing Of Nrv ( 1200Nb ) Of Cw Pump , As Per Scope Of Work . , Minor Overhauling Of Cooling Tower Fan , As Per Scope Of Work .

Key Value

Document Fees
INR 500 /-
EMD
INR 125000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: OVERHAULING OF CRITICAL PUMPS OF POWER HOUSE, CWPH AND COOLING TOWERS OF UNIT#1 TO #10.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 O/H of 16"FC valve of cooling tower, as per scope of work. 200 NO
2 2 Repl. of defective weldment of SR-36 Gea, as per scope of work. 2 NO
3 3 Repl. of CT 1-6 fan assy, as per scope of work. 2 NO
4 4 Repl.of driveshaft of CT 1-6 fan, as per scope of work. 1 NO
5 5 Changing of D.S. rubber bush(1-6), as per scope of work. 10 SET
6 6 Fan blade end clearance and pitch(1-6), as per scope of work. 10 NO
7 7 Elimination of Endplay of SR-36 Gearbox, as per scope of work. 10 NO
8 8 SR-36 Gearbox input shaft oilseal changi, as per scope of work. 10 NO
9 9 SR-36 Gearbox output shaft 'O' ring, as per scope of work. 6 NO
10 10 Driveshaft alignment of SR-36 Gearbox, as per scope of work. 2 NO
11 11 Misc. Welding jobs in CT 1-6, as per scope of work. 200 M
12 12 Misc.cutting jobs in CT 1-6, as per scope of work. 200 M
13 13 O/H of Boiler Feed Pump, as per scope of work. 1 NO
14 14 Mechanical Seal Replacement of BFP, as per scope of work. 8 NO
15 15 Cartridge Repl./Discharge O-Ring Replace, as per scope of work. 6 NO
16 16 Alignment,Coupling & Trial Run of the pu, as per scope of work. 34 NO
17 17 Bearing Inspection of BFP, as per scope of work. 56 NO
18 18 O/H of Booster Pump, as per scope of work. 6 NO
19 19 M. Seal /S. Box Gasket Replacement of BP, as per scope of work. 25 NO
20 20 Alignment,Coupling & Trail Run of BP, as per scope of work. 22 NO
21 21 Bearing Inspection of BP, as per scope of work. 56 NO
22 22 Dismantling of B.PUMP and Re-assembly, as per scope of work. 2 NO
23 23 O/H Condensate Extraction Pump, as per scope of work. 1 NO
24 24 Stage body dismantling and re-assembly, as per scope of work. 8 NO
25 25 Alignment,Coupling & Trail Run of CEP, as per scope of work. 28 NO
26 26 S. Box sleeve Repl. And Brg. Inspection, as per scope of work. 22 NO
27 27 Gland Replacement of CEP, as per scope of work. 20 NO
28 28 O/H of CW pump, as per scope of work. 10 NO
29 29 TBH inspection/repl. Of CW Pump, as per scope of work. 1 NO
30 30 Stuf.Box inspection/repl.of CW Pump, as per scope of work. 1 NO
31 31 Alignment,Coupling & Trail Run of CW pum, as per scope of work. 1 NO
32 32 Gland Replacement Oof CW Pump, as per scope of work. 2 NO
33 33 O/H of ACW Pump, as per scope of work. 4 NO
34 34 TBH inspection/repl.of ACW Pump, as per scope of work. 1 NO
35 35 Stuf.Box inspection/repl.of ACW Pump, as per scope of work. 1 NO
36 36 Alignment,Coupling & Trail Run of ACW Pu, as per scope of work. 1 NO
37 37 Gland Replacement of ACW Pump, as per scope of work. 2 NO
38 38 O/H of Fire Fighting Pump, as per scope of work. 4 NO
39 39 TBH inspection/repl.of F/F Pump, as per scope of work. 1 NO
40 40 Stuf.Box inspection/repl.of F/F Pump, as per scope of work. 1 NO
41 41 Alignment,Coupling & Trail Run of F/F pu, as per scope of work. 1 NO
42 42 Gland Replacement of F/F Pump, as per scope of work. 2 NO
43 43 Stage body dismantling and re-assembly, as per scope of work. 2 NO
44 44 O/H of C.T. pump, as per scope of work. 6 NO
45 45 TBH inspection/repl.of CT Pump, as per scope of work. 4 NO
46 46 Alignment,Coupling & Trail Run of CT pum, as per scope of work. 4 NO
47 47 Gland Replacement of CT Pump, as per scope of work. 10 NO
48 48 Dismantling and re-assembly of CT Pump, as per scope of work. 2 NO
49 49 Synthetic enamel painting of P.H., as per scope of work. 420 M2
50 50 Chloro rubber painting of CT 1-6, as per scope of work. 4200 M2
51 51 Repl.of damaged target nozzles of CT, as per scope of work. 9000 NO
52 52 O/H of Aux. AOP/EOP/MOP, as per scope of work. 1 NO
53 53 Insp./Repl. Of coupling bushes of AOP/EO, as per scope of work. 1 NO
54 54 Insp/Repl. of Bearings AOP/EOP/MOP, as per scope of work. 1 NO
55 55 O/H of Jacking Oil pump, as per scope of work. 1 NO
56 56 Repl.of CW/ACW outlet BFV, as per scope of work. 1 NO
57 57 Overhauling of CW/ACW BFV, as per scope of work. 2 NO
58 58 Replacement of 400NB pipe, as per scope of work. 3 NO
59 59 PM of 20/5T CWPH crane, as per scope of work. 2 NO
60 60 Repl. of CW Inter-connection Valve, as per scope of work. 1 NO
61 61 O/H of Sluice gate at CT discharge, as per scope of work. 34 NO
62 62 Repl. of CW/ACW R.E.Joint, as per scope of work. 3 NO
63 63 OVERHAULING OF DMCW/BOILER FILL PUMP, as per scope of work. 2 NO
64 64 O/H of 18"FC valve of cooling tower (Uni, as per scope of work. 124 NO
65 65 Repl. of defective weldment of Gear Box, as per scope of work. 1 NO
66 66 Repl. of cooling tower fan assy. (Unit 7, as per scope of work. 4 NO
67 67 Repl.of driveshaft of coolingtower fan (, as per scope of work. 1 NO
68 68 Changing of Neoprene bonded rubber (Uni, as per scope of work. 6 SET
69 69 Fan blade end clearance and pitch (Unit, as per scope of work. 24 NO
70 70 Elimination of End play of Gearbox SR-3, as per scope of work. 24 NO
71 71 Gearbox SR-32 input shaft oilseal changi, as per scope of work. 24 NO
72 72 Gearbox SR -32 output shaft 'O' ring (U, as per scope of work. 2 NO
73 73 Driveshaft alignment at Gearbox SR-32 (U, as per scope of work. 1 NO
74 74 Misc. Welding jobs in cooling tower (Un, as per scope of work. 140 M
75 75 Misc.cutting jobs in cooling tower (Uni, as per scope of work. 100 M
76 76 O/H of Cooling Water Pump at RCPH., as per scope of work. 4 NO
77 77 TBH inspection/repl.of CW pumps at RCPH, as per scope of work. 1 NO
78 78 Stuf.Box inspection/repl.RCPH, as per scope of work. 1 NO
79 79 Alignment,Coupling & Trail Run of CW pum, as per scope of work. 2 NO
80 80 Gland Replacement of CW p/p at RCPH, as per scope of work. 2 NO
81 81 O/H of Aux.Cooling Water Pump at RCPH., as per scope of work. 3 NO
82 82 TBH inspection/repl.of ACW p/p at RCPH, as per scope of work. 2 NO
83 83 Stuf.Box inspection/repl.RCPH, as per scope of work. 1 NO
84 84 Alignment,Coupling & Trail Run of ACW p, as per scope of work. 2 NO
85 85 Gland Replacement of ACW p/p at RCPH, as per scope of work. 2 NO
86 86 O/H of Firefighting pump at RCPH, as per scope of work. 3 NO
87 87 TBH inspection/repl.of F/F pump at RCPH, as per scope of work. 2 NO
88 88 Stuf.Box inspection/repl.of F/F pump at, as per scope of work. 2 NO
89 89 Alignment,Coupling & Trail Run of F/F pu, as per scope of work. 2 NO
90 90 Gland Replacementof F/F pump at RCPH, as per scope of work. 2 NO
91 91 Stage body dismantling and re-assembly R, as per scope of work. 1 NO
92 92 Synthetic enamel painting Cooling Tower, as per scope of work. 700 M2
93 93 Chloro rubber painting at Cooling Tower, as per scope of work. 4200 M2
94 94 Repl.of damaged target nozzles of CT (Un, as per scope of work. 8400 NO
95 95 Repl.of CW/ACW outlet BFV at RCPH., as per scope of work. 4 NO
96 96 Overhauling of CW/ACW BFV at RCPH., as per scope of work. 2 NO
97 97 Replacement of 400NB pipe CT (Unit 7 -10, as per scope of work. 1 NO
98 98 PM,& Loadtesting of 25/5T crane at RCPH, as per scope of work. 2 NO
99 99 Repl. of RCPH CW Inter-connection Valve, as per scope of work. 1 NO
100 100 O/H of Sluice gate at CT discharge Uni, as per scope of work. 36 NO
101 101 Repl. of CW/ACW R.E.Joint at RCPH., as per scope of work. 3 NO
102 102 O/H of Intake Pump, as per scope of work. 4 NO
103 103 TBH inspection/repl.of IP., as per scope of work. 4 NO
104 104 Stuf.Box inspection/repl.of I.pump., as per scope of work. 2 NO
105 105 Alignment,Coupling & Trail Run of I.Pump, as per scope of work. 2 NO
106 106 Gland Replacement of I.Pump., as per scope of work. 2 NO
107 107 Overhauling of VoithHydrocoupling of BFP, as per scope of work. 4 NO
108 108 Servicing of NRV(600NB) of ACW Pump, as per scope of work. 6 NO
109 109 Servicing of NRV(1200NB) of CW Pump, as per scope of work. 5 NO
110 110 Minor overhauling of Cooling Tower Fan, as per scope of work. 60 NO
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail