| 1 | 1 | Excavating trenches of required width for pipes , cables etc. including excavation for sockets and dressing of sides ramming of bottoms depth up to 1.5 m in/c getting out the excavated soil and trench returning the soil as required in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming watering etc. and disposing of surplus excavated soil with all required leads as per CPWD specification & as per direction of the Engineer-in-Charge .\nA. For UVCP pipes in new work: a) All kinds of soil : | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | ii) For Pipes not exceeding 90 mm dia | BI01010001010000000000000515BI0100001113 | 500 | Mtr |
|---|
| 3 | 2 | Providing, fixing and laying rigid UPVC pipes conforming to IS : 4985 jointing with couplers, of same class conforming to IS : 10124 ( Pt-II ) with solvent cement conforming to IS : 14182 including testing of joints complete ( but excluding the cost of specials like bend, tees etc. which will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge.\n(A)Class - 3 ( working pressure 6.0 kg / cm2) | BI01010001010000000000000515BI0100001114 | | |
|---|
| 4 | 2.01 | ii) 90 mm OD | BI01010001010000000000000515BI0100001115 | 500 | Mtr |
|---|
| 5 | 3 | Providing & fixing CI sluice valves (with cap) complete with bolts, nuts, rubber, insertions etc. (the tail pieces if required will be paid separately) as per chapter 20 of CPWD specification & direction of the Engineer-in-charge. | BI01010001010000000000000515BI0100001116 | | |
|---|
| 6 | 3.01 | i) 100 mm. dia (PN-1.6). | BI01010001010000000000000515BI0100001117 | 10 | Nos |
|---|
| 7 | 4 | Providing, fixing and laying fabricated UPVC bend of required degree conforming to IS : 10124 ( part 8 / 9 / 10 / 11 / 12 / 13 ) with solvent cement conforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge. | BI01010001010000000000000515BI0100001118 | | |
|---|
| 8 | 4.01 | i) 90 mm. OD | BI01010001010000000000000515BI0100001119 | 4 | Nos |
|---|
| 9 | 5 | Providing, fixing and laying fabricated UPVC end cap conforming to IS : 10124 ( Part 4 ) with solvent cement conforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge. | BI01010001010000000000000515BI0100001120 | | |
|---|
| 10 | 5.01 | i)90 mm. OD | BI01010001010000000000000515BI0100001121 | 2 | Nos |
|---|
| 11 | 6 | Providing, fixing and laying fabricated UPVC equal tee conforming to IS : 10124 ( Part 5 ) with solvent cement conforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge. | BI01010001010000000000000515BI0100001122 | | |
|---|
| 12 | 6.01 | i)90 x 90 mm dia | BI01010001010000000000000515BI0100001123 | 2 | Nos |
|---|