| 1 | 1 | Centralized Items : | | | |
|---|
| 2 | 1.01 | LT XLPE AB cable 3C×25+25 mm2 | item1 | 30000 | mtr. |
|---|
| 3 | 1.02 | LT PVC cable 2×6 mm2 | item2 | 3500 | mtr. |
|---|
| 4 | 1.03 | ST pole SP-21 ( hot dip galvanized | item3 | 42 | Nos |
|---|
| 5 | 1.04 | Stay rod 16×1800 mm2 | item4 | 40 | Nos |
|---|
| 6 | 1.05 | Stay wire 7/10 SWG | item5 | 200 | Kg. |
|---|
| 7 | 2 | Decentralized Item | | | |
|---|
| 8 | 2.01 | Dead end clamps with Eye hook ( insulated) SP-21 with clamp & N&B | item6 | 350 | Nos |
|---|
| 9 | 2.02 | Suspension clamp with Eye Hook( Insulated) with clamp & B&B | item7 | 750 | Nos |
|---|
| 10 | 2.03 | LT insulation piercing connectiors 25mm | item8 | 1000 | Nos |
|---|
| 11 | 2.04 | Mid span jointing sleeves | item9 | 250 | Nos |
|---|
| 12 | 2.05 | LT distribution box on LT pole with clamp and N&B | item10 | 245 | Nos |
|---|
| 13 | 2.06 | Stay clamp for SP-21 with N&B | item11 | 40 | Nos |
|---|
| 14 | 3 | Safe carriage of following stock material from upto road side . Approx distance upto 30 Km. | | | |
|---|
| 15 | 3.01 | ST pole SP-21 | item12 | 42 | Nos |
|---|
| 16 | 3.02 | Small line material | item13 | 183.1 | Qtl. |
|---|
| 17 | 4 | Head load cartage of following material road site to work site Avg. distance upto 0-1 Km. | | | |
|---|
| 18 | 4.01 | ST pole SP-21 | item14 | 42 | Nos |
|---|
| 19 | 4.02 | Small line material | item15 | 183.1 | Qtl. |
|---|
| 20 | 5 | Dismentling of existing 1 phase 2 W LT line | item16 | 22 | Km. |
|---|
| 21 | 6 | Dismentling of existing 3 phase 4 w LT line | item17 | 8 | Km. |
|---|
| 22 | 7 | Digging of pit Sz0.9×0.6×1/6 of full length of pole for pole in all type of soil | item18 | 42 | Nos |
|---|
| 23 | 8 | Errection of LT pole SP-21 including fitting of all accessories. | item19 | 42 | Nos |
|---|
| 24 | 9 | Muffing of pole Sz 0.45×0.6 cm with CC 1:3:6 Sz 45 cm height from ground level including cost of cement, stone and sand etc. | item20 | 42 | Nos |
|---|
| 25 | 10 | Digging of pit Sz 0.6×0.6×1.2 mtr. In all type of soil of full length of pole for pole in all type of soil. | item21 | 40 | Nos |
|---|
| 26 | 11 | Errection of LT stay rod along with all accessories | item22 | 40 | Nos |
|---|
| 27 | 12 | Re- nozelling and tightening of old stay set | item23 | 18 | Nos |
|---|
| 28 | 13 | Laying and sagging of LT XLPE AB cabe along with fitting of all accessories such as clamp, jointing sleeve etc. | item25 | 30000 | Rmt. |
|---|
| 29 | 14 | Supply & fixing of LT distribution box along with connection petty item such as clamp, N&B. | item26 | 250 | Nos |
|---|
| 30 | 15 | Restrainghtening of tilted ST pole SP-21 after opening both side LT span | item27 | 25 | Nos |
|---|
| 31 | 16 | Disconnection of LT service cable and reconnection it through distribution box after commissioning of ABC line. | item28 | 955 | Nos |
|---|
| 32 | 17 | Route clerance of LT line by looping chooping of tree branch along LT line. | item29 | 8 | Km. |
|---|
| 33 | 18 | Back H/L cartage of following material from work site to road side ( Avg. dist 0-1 Km.) | | | |
|---|
| 34 | 18.01 | conductotor scrap | item30 | 58.37 | Qtl. |
|---|
| 35 | 19 | Safe back cartage of following material from road side to store center Srinagar | | | |
|---|
| 36 | 19.01 | Conductor (scrap) | item32 | 58.37 | Qtl. |
|---|