Removal Of Request-E And Installation Of Cms And Sdn Onboard Ins Mumbai:-1 Request- E ( Ops Room ) -Degutting And Removal Of Existing Dev 171-A Qty-03 ( Dimension 1230*12130*1575Mm ) Request- E Equipment Room- Degutting And Removal Of Existing Converter Att-20-400 ( Dimension 700*1220*590Mm ) ( Includes Removal From Onboard Location To Jetty Or Upper Deck Of Ship As Specified By Ship ) 2 Services – Request- E Control Post- Degutting And Removal Of Existing Dev-198 ( Dimension 665*433*868Mm ) Dev-119 ( B ) Qty-03 ( Dimension 665*434*868Mm ) , Dev-119Ж ( Dimension 665*434*1103Mm ) , Request- E ( Ops Room ) -Degutting And Removal Of Existing Dev-26A-1 ( Dimension 1270*331*588Mm ) , Dev-26-1 ( Dimension 994*331*585Mm ) , Dev T-75 ( Dimension 665*433*868Mm ) ( Includes Removal From Onboard Location To Jetty Or Upper Deck Of Ship As Specified By Ship ) 3 Services – Request- E ( Ops Room ) - Degutting And Removal Of Existing Dev-125 Qty-03 ( Dimension 738*260*360Mm ) Dev26 ( B ) -1 ( Dimension 695*287*585Mm ) , Dev 193-1 ( Dimension 626*393*360Mm ) , Dev T-9 ( Dimension 402*235*429Mm ) Request- E Control Post- Degutting And Removal Of Existing Dev-175-2 ( Dimension 520*235*796Mm ) , Db T- ( P ) ( Dimension 235*354*92Mm, Weight- ) , Db T- ( Y ) ( Dimension 520*235*796Mm ) , Db T- ( Y ) -5 ( Dimension 564*235*986Mm. ) Riu Unit ( Dimension 500*300Mm ) Request- E Equipment Room-Degutting And Removal Of Existing Voltage Contro Unit Ph-43P ( Dimension 307*257*130Mm ) Switching Unit Y ( B ) P-13P ( Dimension 428*488*224Mm ) , Rectifier ( Dimension 550*366*292Mm ) , Filter ( Dimension 449*390*276Mm ) Magnetic Starter ( Dimension 300*182*394Mm ) , Transformer ( Dimension 175*190*182Mm ) , Resistance Box ( Dimension 530*390*200Mm ) , Starter ( P ) T-3232 ( Dimension 485*535*204Mm ) , T ( Y ) -10 ( Dimension 573*235*720Mm ) , T- ( Y ) -8 Qty-02 ( Dimension 589*235*986Mm. ) ( Includes Removal From Onboard Location To Jetty Or Upper Deck Of Ship As Specified By Ship ) 4 Services – Request- E ( Ops Room ) - Degutting And Removal Of Existing Dev T-98 Qty-03 ( Dimension 800*1070*1700Mm ) , Request- E Control Post- Degutting And Removal Of Existing Dev T-162A ( Dimension 665*433*868Mm ) , Dev T-155 ( Dimension 665*529*1103Mm ) , Dev-181A ( Dimension 665*439*1103Mm ) ( Includes Removal From Onboard Location To Jetty Or Upper Deck Of Ship As Specified By Ship ) 5 Degutting Of Existing Cable 6 Removal Of In Way Electrical Equipment Like Starter, Junction Boxescontrol Panel And Light Fittings Etc. 7 Removal Of In Way Equipment Like Ducting, Air Pipe Tool Rack, Fire Box, Pre-Wetting System Etc. 8 Service - Fitments Of 20 Standard Nodes And 08 Dmfcs Of Cms And Sdn At Various Locations Onboard. 9 Service -Shifting Of 20 Cms 16A Sub Units ( Weight 15-25 Kgs Each ) From Shop Floor To Ship. 10 Service -7 In Nos Dmfcs To Be Installed In Ops Room 11 Service - Installation Of Following In Ops Room -Pds / Chart Server, Network Health Monitoring System, Switching Unit For Remote Display ( Surd ) , Vertical Remote Display. 12 Service - 03 In Nos. Concentrators, 02-Interphones / Intercoms, 05 Jbs To Be Relocated In The Ops Room 13 Service - All Icm Module ( Qty-08 ) Stands Are Required To Be Installed In A Separate Stand Besides Dmfc. 14 Service - A Communication Rack Required To Be Fabricated To House One Oc Of Link Ii And One Itu Besides Dmfc. Material To Be Catered By Vendor. 15 Service -A 72 Display Need To Be Installed In Ops Room. A Customized Bracket With Foldable Hinges And Securing Arrangement To Be Fabricated. 16 Service -One Dmfc To Be Installed In Bridge. ( Refer To Bps For Dimensions And Weight ) 17 Service -A Customized Rack For Link Ii Needs To Be Fabricated And Installed Next To Dmfc In Bridge. Material To Be Catered By Vendor. 18 Service - Laying Of Cable In Channel Tray For Cms 19 Service -Trunking To Be Fabricated ( 200Mm*300Mm & 5 Mtrs Length ) And Bulkhead Piercing Is Required For The Same. Material For Trunking To Be Catered By Vendor 20 Service -Laying Of New Pipe For Connection Of Fireman System ( Approx 30Mtrs ) With Marine Ac. Pipe And End Connections To Be Catered By Vendor. 21 Service -One Dmfc To Be Installed In Flag Bridge. 22 Service -A Customized Rack For Link Ii Needs To Be Fabricated And Installed Next To Dmfc In Flag Bridge Bridge. Material Required For Fabrication To Be Catered By Vendor 23 Service -Trunking To Be Fabricated ( 200Mm*300Mm & 5 Mtrs Length ) And Bulkhead Piercing Is Required For The Same. Material Required For Trunking To Be Catered By Vendor. 24 Service -Installation Of Two In Nos. Computer Complex, Two In Nos. Esis, One In Nos. Rddu And Switching Unit For Cctv Camera. 25 Service -Installation Of Power On Control Module ( Pocm ) , Remote Power On Module ( Rpom ) , Colour Printer And Plotter. 26 Service -Installation Of Ups Battery And Isolation Transformer. 27 Service -Laying Of Cable In Channel Trays For Sdn 28 Service -02 Ees , 03 Lius, Gateway Switch-B, Battery Rack, Ups-3Kva Installation. 29 Service -Relocation Of Power Panel Jb, Fabrication Of Supporting Platform In Order To Locate Lius Ees And Gateway Switches. 30 Service -Installation Of Mpio, Ctp, Ups-3Kva, Battery Rack, Liu Type-B. 31 Service -Relocation Of Two Junction Boxes With Associated Cabling And Fabrication Of Supporting Platform For Fitment On Bulkhead. 32 Service -Installation Of Core Switch-B, Distribution Switch-B, Server Rack, 3- Battery Rack, 10-Liu Type-B. 33 Service -Installation Of Core Switch, Distribution Switch, Server Rack, Mpio, Ctp, 9-Liu Type-B & 3- Ees. 34 Service -Installation Of 4-Ups-3Kva 4-Battery Rack. 35 Service -Installation Of Mpio –I, Ctp, Ups-3Kva, 2-Battery Rack, 2-Liu Type-B, Gateway Switch, Ehfs #1, Ups-1Kva, Step Down Transformer For 1Kva Ups, Pdp. 36 Service -Installation Of 04-Gateway Switch, 06-Ups-1Kva , 06-Step Down Transformer, 06-Battery Rack, 10- Liu Type-B. 37 Service -Installation Of 2- Ees, 1-Liu Type-B, Ups-1Kva , Step Down Transformer & Ups-3Kva ( Refer To Bps For Dimensions And Weight ) 38 Services -Installation Of Gateway Switch, Ees, 3-Liu Type-B, 2-Ups-1Kva , 2-Step Down Transformer ( Refer To Bps For Dimensions And Weight ) 39 Service -He Starter Panel In Rx Room To Be Relocated As Per The Specified Position To Accommodate Step Down Transformer. 40 Service -Installation Of Ees, Liu Type-B, Ups-1Kva , Step Down Transformer , Battery Rack. 41 Service -Relocation Of 15 Kva Transformer, Main Broadcast Speaker, Signal Intercom Including Fabrication Of Mounting, Shock Mounts 42 Service -Sdn Units To Be Shited In As Per The Shipping Route. 43 Service -Laying Of Cable In Channel Trays 44 Service -Laying And Manufacture Of 300 Mtrs Channel Tray 45 Service -Laying Provisioning And Fitment Of Cable Conduit 60 Sq Mm 46 Service -Fitment Of New Mct Gland Coming With Penetrations Of Bulk Heads 47 Service -Manufacture And Fitment Of Cable Tallies 6X3x0.5 Mm - Aluminum ( Punched ) 48 Service -Termination Of Old / Unused Cables By Terminating The Shield Circumferentially And Grounding The Core At Both Ends. Proper Bonding And Grounding Of All Units Ar Per Necstd 1101 49 Service -Manufacture And Fitment Of Clamps For Mounting Of The Channel Trays And Bulkhead Mounted Devices, As Required 50 Service -Resiting / Blanking Of The Existing Ventilation Trunking Feeding The Cabinets At All Locations Along With Removal And Refitment Of The Ac Trucking For Shipping In And Installation Of Cabinets. 51 Service -Resiting Of The Existing Light Fixtures And Manufacturing Of Additional Cable Trays In All Compartments During Installation And Associated Regutting And Hot Work 52 Service -Provisioning Of All Tools, Equipment Slings , Vehicles Or Any Other Item Required For Undertaking The Above Mentioned Work 53 Removal Of Microtech Tiling 54 Removal Of Lagging For Fabrication Job