Tender For Civil Works - Roads :-Tarar Kali Asthan To Thigh Sanhaula The Road
Tender Value
70.18 Lakhs
Estimated cost
Bid Submission
13 Mar 2020
0 days left
EMD
1.40 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
KAHALGAON → Bihar
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Civil Works - Roads :-Tarar Kali Asthan To Thigh Sanhaula The Road
BOQ
| Name of Work: TARAR KALI ASTHAN TO THIGH SANHAULA THE ROAD | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Providing & Fixing of Working benchmark Pillars 2 nos. per km & 6 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I | 0.7 | Km | |
| 2 | 2 | Clearing and Grubbing Road Land (By manual means) including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of E/I | 0.245 | Ha | |
| 3 | 3 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 . (Including Royality & Labour Cess). | |||
| 4 | 4 | For 1000 m lead | 593.23 | Cum | |
| 5 | 5 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1. (Including Royality & Labour Cess). | 526.33 | Cum | |
| 6 | 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 198.84 | Cum | |
| 7 | 7 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 265.13 | Cum | |
| 8 | 8 | Construction of un-reinforcedplain cement thickness as perdesign , over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 grade coarse and fine aggregate maximum size of aggregate not exceding 25mm , mixed in a concrete of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design ,laid in approved fixed side formwork ( steel channel ,laying and fixing of 125 micron thick plythene film ,wedges ,steel plates including levelling the formwork as per drawing ) spreading the concrete with shovels , rakes , compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion , constrution joints ,applying debonding strips , primer , sealant , dowel bars , near approaches to bridge/ culvert and construction joints, admixtures as approved , curing of concrete slab for 14 days curing compound (where specified) and water finishing to lines and grade as per drawing and Technical specification clause 1501. | 424.2 | cum | |
| 9 | 9 | Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412 | 700 | sqm | |
| 10 | 10 | Reinforced cement concrete M15 grade kilometre local stone of standard design asper IRC:8 fixing in position including painting and printing , etc as per drawing and technical specification clause 1703. | |||
| 11 | 11 | Km stone | 2 | No | |
| 12 | 12 | 200 m stone | 3 | No | |
| 13 | 13 | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. | |||
| 14 | 14 | 600 mm equilateral & triangle, | 3 | No | |
| 15 | 15 | 600 mm circular , | 2 | No | |
| 16 | 16 | 800 mm x 600 mm rectangular, | 3 | No | |
| 17 | 17 | 600 mm x 450 mm rectangular, | 2 | No | |
| 18 | 18 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. | |||
| 19 | 19 | Road Marking On CC | 140 | Sqm | |
| 20 | 20 | Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704 | 4 | No | |
| 21 | 21 | Providing and erecting direction and place identification retro reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. | 3 | No | |
| 22 | 22 | Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year | 35 | EACH | |
| 23 | 23 | Half Brick circular tree guard, in 2nd class brick, internal diametre 1.25 metres, and height 1.2 metre, above ground 0.20 metre below ground, bottom two courses laid dry, and top three courses in cement mortar 1:6 (1 cement 6 sand and the intermediate courses being in dry honey comb masonry, as per design complete | 35 | EACH | |
| 24 | 24 | Providing and fixing of typical MMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 | 5 | No | |
| 25 | 25 | Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104 | 29.798 | cum | |
| 26 | 26 | Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | 4.595 | cum | |
| 27 | 27 | Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 | 35.711 | cum | |
| 28 | 28 | Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106 | 7.5 | m | |
| 29 | 29 | Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 | 20.64 | Sqm | |
| 30 | 30 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 76.64 | cum | |
| 31 | 31 | Providing granular sand filling below concrete in foundation. | 3.47 | cum | |
| 32 | 32 | Providing PCC Grade M15 for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | 24.05 | cum | |
| 33 | 33 | Brick masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203 | 114 | cum | |
| 34 | 34 | Brick masonry work in cement mortar (CM 1:4) in substructure and Kerb complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203 | 54.7 | cum | |
| 35 | 35 | Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 | 4.8 | cum | |
| 36 | 36 | Providing Bitumen painting over top surface of Abutment cap & inner vertical surface of Dirt Wall including Heating the bitumen & cost of painting brush etc. all complete. | 16.95 | Sqm | |
| 37 | 37 | RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5 | 18.58 | cum | |
| 38 | 38 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications | 2.175 | MT | |
| 39 | 39 | Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight | 15 | RM | |
| 40 | 40 | Brick masonry work in cement mortar 1:3 in parrapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4 | 6.24 | cum | |
| 41 | 41 | Plastering with cement mortar (1:4 ), 15 mm Thick on brick work in sub-structure as per Technical Specifications Clause 613.4 & 1204. | 112.85 | Sqm | |
| 42 | 42 | Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I | 42.56 | Sqm | |
| 43 | 43 | Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing | 36 | NOS | |
| 44 | 44 | ADD GST@12% | 1 | RS | |
| 45 | 45 | ADD LC@1% | 1 | RS | |
| 46 | 46 | Construction Seigniorage Fee | 1 | RS | |
| 47 | 47 | 1st Year Maintenance cost | 1 | YEAR | |
| 48 | 48 | 2nd Year Maintenance cost | 1 | YEAR | |
| 49 | 49 | 3rd Year Maintenance cost | 1 | YEAR | |
| 50 | 50 | 4th Year Maintenance cost | 1 | YEAR | |
| 51 | 51 | 5th Year Maintenance cost | 1 | YEAR | |
| 52 | 52 | ADD GST@12% | 1 | RS | |
| 53 | 53 | ADD LC@1% | 1 | RS |
AI Tender Summary
Tender Timeline
Mar 04, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedMar 13, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMar 13, 2020
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender