| 1 | 1 | ATCS (Adaptive Traffic Control System) for 50 Junction | | | |
|---|
| 2 | 1.01 | ATCS (Adaptive Traffic Control System) for a 3 arm -\nJunction with complete hardware and software including 4D forwarding Radar with proper certification, traffic controller, Pedestrain Walk Man, Disabled Friendly Audio Tactile Device, Pedestrain Stop Man, Detector, Network Switch, mounting infrastructure, UPS, Outdoor Cabinet with suitable mounting, earthing, surge protection arrangement, accessories etc. as required. | item61 | 10 | Junction |
|---|
| 3 | 1.02 | ATCS (Adaptive Traffic Control System) for a 4 arm -\nJunction with complete hardware and software including 4D forwarding Radar with proper certification, traffic controller, Pedestrain Walk Man, Disabled Friendly Audio Tactile Device, Pedestrain Stop Man, Detector, Network Switch, mounting infrastructure, UPS, Outdoor Cabinet with suitable mounting, earthing, surge protection arrangement, accessories etc. as required. | item1 | 35 | Junction |
|---|
| 4 | 1.03 | ATCS (Adaptive Traffic Control System) for a 5 arm -\nJunction with complete hardware and software including 4D forwarding Radar with proper certification, traffic controller, Pedestrain Walk Man, Disabled Friendly Audio Tactile Device, Traffic Signals , Pedestrain Stop Man, Detector, Network Switch, mounting infrastructure, UPS, Outdoor Cabinet with suitable mounting, earthing, surge protection arrangement, accessories etc. as required. | item2 | 5 | Junction |
|---|
| 5 | 2 | TRAFFIC ENFORCEMENT COMPONENTS | | | |
|---|
| 6 | 2.01 | Traffic Enforcement System for 3 arm junction:\nRed Light Violation Detection (RLVD) , ANPR cameras, IR , Local Processing Unit, with cabling, accessories & Mounting Infrastructure with Pole, Switches, Junction boxes, UPS, software licenses etc. as required | item3 | 3 | Junction |
|---|
| 7 | 2.02 | Traffic Enforcement System for 4 arm junction:\nRed Light Violation Detection (RLVD) , ANPR cameras, IR , Local Processing Unit, with cabling, accessories & Mounting Infrastructure with Pole, Switches, Junction boxes, UPS, software licenses etc. as required | item4 | 22 | Junction |
|---|
| 8 | 2.03 | Traffic Enforcement System for 5 arm junction:\nRed Light Violation Detection (RLVD) , ANPR cameras, IR , Local Processing Unit, with cabling, accessories & Mounting Infrastructure with Pole, Switches, Junction boxes, UPS, software licenses etc. as required | item5 | 3 | Junction |
|---|
| 9 | 2.04 | SVD: Speed Detection System for covering 2 lanes in one direction with complete subcomponents including ANPR camera, sensors, wide angle evidence camera, IR illuminator, non-intrusive speed. Sensor, with cabling & mounting etc. as required | item6 | 6 | Lane |
|---|
| 10 | 2.05 | ASVD: Average Speed Detection System for covering 2 lanes in one direction with complete subcomponents including ANPR camera, sensors, wide angle evidence camera, IR illuminator, non-intrusive speed. Sensor, with cabling & mounting etc. as required | item7 | 4 | Lane |
|---|
| 11 | 2.06 | PA system including hardware, software mounting\ninfrastructure, accessories etc. at junctions | item8 | 50 | Nos |
|---|
| 12 | 2.07 | ECB system including hardware, software mounting\ninfrastructure, accessories etc. at junctions | item9 | 50 | Nos |
|---|
| 13 | 2.08 | RLVD (including Speed, No Helmet, Triple Ridding etc.)\nApplication Software at ICCC | item10 | 1 | License |
|---|
| 14 | 2.09 | ANPR Software Application at ICCC | item11 | 1 | License |
|---|
| 15 | 2.1 | SVD Software Application at ICCC | item12 | 1 | License |
|---|
| 16 | 2.11 | PA System Software Application at ICCC | item13 | 1 | License |
|---|
| 17 | 2.12 | ECB System Software Application at ICCC | item14 | 1 | License |
|---|
| 18 | 2.13 | Integration of existing ITMS control room system (including E-Challan software Application) at ICCC, including integration with Variable Messaging Sign boards, State/ RTO/ Vahan & Sarathi, Payment Portal/Mobile App / Payment Gateway etc. | item66 | 1 | Lumpsum |
|---|
| 19 | 3 | Surveillance | | | |
|---|
| 20 | 3.01 | Surveillance - Bullet Cameras | item15 | 218 | Nos |
|---|
| 21 | 3.02 | Surveillance - Outdoor PTZ Camera | item16 | 20 | Nos |
|---|
| 22 | 4 | ICCC AND ITMS CONTROL CENTRE | | | |
|---|
| 23 | 4.01 | Centralize traffic Information & Management Software at ICCC (Including ITMS Software) | item17 | 1 | License |
|---|
| 24 | 4.02 | Video Management and Video Analytics software (500 Cameras) | item18 | 1 | License |
|---|
| 25 | 6 | Operation And Maintenance cost (OPEX) | | | |
|---|
| 26 | 6.01 | 1st Year | item22 | 1 | Lumpsum |
|---|
| 27 | 6.02 | 2nd year | item23 | 1 | Lumpsum |
|---|
| 28 | 6.03 | 3rd Year | item24 | 1 | Lumpsum |
|---|
| 29 | 6.04 | 4th Year | item25 | 1 | Lumpsum |
|---|
| 30 | 6.05 | 5th Year | item26 | 1 | Lumpsum |
|---|
| 31 | 6.06 | Network Connectivity and Bandwidth Cost for 5 years | item27 | 1 | Lumpsum |
|---|
| 32 | 7 | INDIVIDUAL COMPONENT LIST\n (Note: Bidders are advised to give Individual Component cost for below from S.No. 7.01 to 7.15 , however this cost will not be considered for evalution of financial bid ) | | | |
|---|
| 33 | 7.01 | ATCS Controller with cabinet and other accessories | item28 | 1 | Numbers |
|---|
| 34 | 7.02 | Traffic Signal Aspects | item29 | 1 | Numbers |
|---|
| 35 | 7.03 | Vehicle Countdown Timer | item30 | 1 | Numbers |
|---|
| 36 | 7.04 | Pedestrian Walk Man | item31 | 1 | Numbers |
|---|
| 37 | 7.05 | Pedestrian Stop Man | item32 | 1 | Numbers |
|---|
| 38 | 7.06 | Detector (4D forwarding Radar with proper certification) | item33 | 1 | Numbers |
|---|
| 39 | 7.07 | Cantilever Poles along with foundation | item34 | 1 | Set |
|---|
| 40 | 7.08 | Straight Pole along with foundation | item35 | 1 | Set |
|---|
| 41 | 7.09 | Network Switch Ruggedized, and civil work | item36 | 1 | Numbers |
|---|
| 42 | 7.1 | Red Light Violation Detection (RLVD) sensors | item37 | 1 | Numbers |
|---|
| 43 | 7.11 | Camera with ANPR capability | item38 | 1 | Numbers |
|---|
| 44 | 7.12 | Local processing unit | item39 | 1 | Numbers |
|---|
| 45 | 7.13 | UPS | item40 | 1 | Numbers |
|---|
| 46 | 7.14 | Mounting structure with pole, junction boxes etc. | item41 | 1 | Set |
|---|
| 47 | 8 | KEY RESOURCES\n (Note: Bidders are advised to give Man Month cost for below from S.No. 8.01 to 9.04 , however this cost will not be considered for evalution of financial bid ) | | | |
|---|
| 48 | 8.01 | Team Leader-cum-Program Manager | item43 | 1 | Month |
|---|
| 49 | 8.02 | Solution Architect | item44 | 1 | Month |
|---|
| 50 | 8.03 | Database Expert | item45 | 1 | Month |
|---|
| 51 | 8.04 | Security Expert | item46 | 1 | Month |
|---|
| 52 | 8.05 | Intelligent Traffic Management Expert | item47 | 1 | Month |
|---|
| 53 | 8.06 | Network Expert | item48 | 1 | Month |
|---|
| 54 | 9 | OTHER RESOURCES | | | |
|---|
| 55 | 9.01 | Application Developer | item50 | 1 | Month |
|---|
| 56 | 9.02 | Software Test Lead | item51 | 1 | Month |
|---|
| 57 | 9.03 | Software Testing Engineer | item52 | 1 | Month |
|---|
| 58 | 9.04 | Integration Expert | item53 | 1 | Month |
|---|