Consultancy Services For Preparation Of Feasibility Study And Detailed Project Report For Proposed Barbil Bypass Or Ring Road In The Keonjhar District In The State Of Odisha . , Keonjhar-Odisha

Orissa Bridge And Construction Corporation Limited has published Consultancy Services For Preparation Of Feasibility Study And Detailed Project Report For Proposed Barbil Bypass Or Ring Road In The Keonjhar District In The State Of Odisha . . Submission Date for this Tender is 16-03-2020. Consultancy Service Tenders in Keonjhar Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

23859222
Consultancy Services For Preparation Of Feasibility Study And Detailed Project Report For Proposed Barbil Bypass Or Ring Road In The Keonjhar District In The State Of Odisha .
Open Tender
Indian
Odisha
Keonjhar
16-03-2020

Tender Details

Consultancy Services For Preparation Of Feasibility Study And Detailed Project Report For Proposed Barbil Bypass Or Ring Road In The Keonjhar District In The State Of Odisha . , Professional Staff , Sr . Highway Engineer-Cum-Team Leader , Highway Cum Pavement , Bridge Engineer , Road Safety Engineer , Traffic Engineer , Material-Cum-Geo-Technical Engineer , Senior Survey Engineer , Financial Analyst , Environmental Specialist , Quantity Surveyor/Documentation Expert , Rr Expert , Sub-Professional Staff , Quantity Surveyor , Survey Engineer , Lab Technician , Support Staff , Office Manager ( 1No ) , Accountant Cum Cashier ( 1No ) , Dataentry Operator ( 1No ) , Office Boy ( 1No ) , Transportation ( Fixed Costs ) , The Vehicles Provided By The Consultants Shall Include The Cost For Rental , Drivers , Operation , Maintenance , Repairs , Insurance , Etc . - 3 Nos , Duty Travel To Site ( Fixed Costs ) , Professional Staff , Sub-Professional Staff , Office Rent ( Fixed Costs ) , The Rent Cost Includes Maintenance , Cleaning , Repairs , Etc . , Office Supplies , Utilities And Communication ( Fixed Costs ) , Office Supplies Drafting , Supplies Computer , Running Costs , Domestic And InternationalCommunication , Office Furniture And Equipment ( Rental ) , Office Furniture And Equipment ( Rental/Hire ) , Reports And Document Printing , Monthly Report ( 3 Per Month For Four Months ) , Inception Report & Qap , Environment And Social ImpactScreening Report , Draft Feasibility Report , Final Feasibility Report , Strip Plan With L . A . Reports , Draft La And Clearances I Report , Final La And Clearances I Report , Draft Environmental AssessmentReport & Rap , Final Environmental AssessmentReport & Rap , Draft Detailed Design Report & Drawings Etc . , Draft Emp , Draft Bidding Documents , Final Detailed Project Report With Bill Of Quantities , CostEstimates , Updated Drawings Etc . , Final Emp , Final Bidding Documents , Schedules For Land Acquisition , La & Clearances Ii Report , Topographical Survey ( Fixed Rate ) , Topographic Survey Including Hire Charges For Equipment And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc . Inclusive Of Cost Of Materials , Labourer , Detailed Topographic Surveys Using Mobile/ Aerial Lidar Or Equivalent Technology , Investigation ( Fixed Cost ) , Road And Bridge Inventory , Bbd Test And Pavement Evaluation , Roughness Survey , Axle Load Survey , Material Survey And Investigation , Sub-Grade Investigation , Traffic Survey , Socio-Economic & Census Survey/Studies , Land Acquisition Studies , Any Other Investigations/Surveys , * Sub-Soil Investigation ( Boring ) , Boring In All Type Of Soils ( Other Than Hard Rock ) , Boring In Hard Rock

Key Value

Document Fees
INR 20000 /-
EMD
INR 500000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Consultancy Services for preparation of Feasibility Study and Detailed Project Report for proposed Barbil Bypass/Ring Road in the Keonjhar District in the State of Odisha.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Professional Staff
2 1.01 Sr. Highway Engineer-\ncum-Team Leader 4 Man Month
3 1.02 Highway cum Pavement 2 Man Month
4 1.03 Bridge Engineer 2 Man Month
5 1.04 Road Safety Engineer 1 Man Month
6 1.05 Traffic Engineer 1 Man Month
7 1.06 Material-cum-Geo-technical Engineer 1 Man Month
8 1.07 Senior Survey Engineer 2 Man Month
9 1.08 Financial Analyst 1 Man Month
10 1.09 Environmental Specialist 1 Man Month
11 1.1 Quantity Surveyor/\nDocumentation Expert 2 Man Month
12 1.11 RR Expert 1 Man Month
13 2 Sub-Professional Staff
14 2.01 Quantity Surveyor 4 Man Month
15 2.02 Survey Engineer 4 Man Month
16 2.03 Lab Technician 4 Man Month
17 3 Support Staff
18 3.01 Office Manager (1No) 4 Man Month
19 3.02 Accountant cum cashier (1No) 4 Man Month
20 3.03 Dataentry Operator (1No) 4 Man Month
21 3.04 Office Boy (1No) 4 Man Month
22 4 Transportation (Fixed costs)
23 4.01 The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.\n- 3 nos 12 Vehicle Month
24 5 Duty Travel to Site (Fixed Costs)
25 5.1 Professional Staff 16 Man-Days
26 5.2 Sub-Professional Staff 20 Man-Days
27 6 Office Rent (Fixed Costs)
28 6.1 The rent cost includes maintenance, cleaning, repairs, etc.\n 4 Month
29 7 Office Supplies, Utilities and Communication (Fixed Costs)
30 7.01 Office Supplies Drafting 4 Month
31 7.02 Supplies Computer 4 Month
32 7.03 Running Costs 4 Month
33 7.04 Domestic and International\nCommunication\n 4 Month
34 8 Office Furniture and Equipment (Rental)
35 8.01 Office Furniture and Equipment (Rental/Hire) 1 LS
36 9 Reports and Document Printing
37 9.01 Monthly Report (3 per month for four months) 12 Nos
38 9.02 Inception Report & QAP 3 Nos
39 9.03 Environment and Social Impact\nScreening Report 2 Nos
40 9.04 Draft Feasibility Report 1 Nos
41 9.05 Final Feasibility Report 3 Nos
42 9.06 Strip Plan with L.A. Reports 3 Nos
43 9.07 Draft LA and Clearances I Report 1 Nos
44 9.08 Final LA and Clearances I Report 3 Nos
45 9.09 Draft Environmental Assessment\nreport & RAP 1 Nos
46 9.1 Final Environmental Assessment\nreport & RAP 3 Nos
47 9.11 Draft Detailed Design Report & Drawings etc. 1 Nos
48 9.12 Draft EMP 1 Nos
49 9.13 Draft Bidding Documents 1 Nos
50 9.14 Final Detailed Project Report with Bill of Quantities, Cost\nEstimates, Updated Drawings etc. 3 Nos
51 9.15 Final EMP 3 Nos
52 9.16 Final Bidding Documents 3 Nos
53 9.17 Schedules for land acquisition 3 Nos
54 9.18 LA & Clearances II Report 3 Nos
55 10 Topographical Survey (Fixed Rate)
56 10.01 Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer 30 per Km
57 10.02 Detailed topographic surveys using mobile/ aerial LiDAR or equivalent technology 30 per KM
58 11 Investigation (Fixed cost)
59 11.01 Road and Bridge Inventory 1 LS
60 11.02 BBD Test and Pavement Evaluation 1 LS
61 11.03 Roughness Survey 1 LS
62 11.04 Axle Load Survey 1 LS
63 11.05 Material Survey and Investigation 1 LS
64 11.06 Sub-grade Investigation 1 LS
65 11.07 Traffic Survey 1 LS
66 11.08 Socio-economic & Census Survey/Studies 1 LS
67 11.09 Land Acquisition Studies 1 LS
68 11.1 Any other investigations/surveys 1 LS
69 12 * Sub-Soil Investigation (Boring)
70 12.01 Boring in all type of soils (other than hard rock) 1500 Rmt
71 12.02 Boring in hard rock 200 Rmt
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail