Manufacturing And Supply Of Glass Gauge Draft Indicator For Grse Yard Nos . 3025-3028 ( Svl Project ) , ships glass gauge draught indicator 1 . scope of supply as per sor no . gt421400001 rev . 2 2 . inspection , tests and certification: ( i ) inspection is to be carried out by grse ( qa ) /tpi . production schedule and quality assurance plan will be submitted by the equipment manufacturer to the inspecting authority for approval . equipment will be manufactured as per approved qap . for valves , dampers etc . firm to furnish iacs type approved certificates . ( ii ) factory acceptance trial the equipment will be tested after assembly at oems premises and will be inspected and stamped upon successful trials by inspection authority . inspection certificate and factory acceptance trial duly certified by inspection authority are to be furnished along with equipment . the ihq/mod ( n ) and grse reserve the right to depute representatives to witness factory acceptance trials of equipment conducted in india or abroad . firm should intimate schedule of fats at least ten weeks in advance to grse . fat protocol shall be made in line with all tests/trials as per approved graq protocol for hats . ( iii ) weighed weight record of weighed weight duly certified by the inspecting authority shall be furnished by the equipment manufacturer at the time of delivery of the equipment . ( iv ) receipt inspection of the equipment shall be done by grse ( ric ) . ( v ) onboard test and trial onboard test and trial will be conducted as per the format ( graq ) approved by inspecting authority and in presence of representatives of oem , grse , inspection authority and owners authorized rep . ships draught level indicating system consists of glass gauge level indicators , inlet sea valves , first stage hydraulic damper , sec ond stage hydraulic damper , pipelines for delivery , blowing down and discharge , air pipes and stop valves etc . draught readings with scale in mm . at 3 locations in a ship . as per sotr no . gt421400001 rev . 2 , all working drg including dimensionl drg all working drawings including dimensional drawings , maintenance space , fixing arrangement , schematic diagrams etc . as per sotr no . gt421400001 rev . 2 , installatn procedure/manual/ specificatn installation procedure/ manual / specification . as per sotr no . gt421400001 rev . 2 , instructn , operation&maintenance manuals instruction , operation and maintenance manuals , cpl & pil . as per sotr no . gt421400001 rev . 2 , preservatn procedure&maintence schedule preservation procedure and maintenance schedule for equipment . as per sotr no . gt421400001 rev . 2 , onboard test and trial format i . e . graq . onboard test and trial format i . e . graq . as per sotr no . gt421400001 rev . 2 , inspection and test certificate inspection and test certificate as per sotr no . gt421400001 rev . 2 , iacs type approved certificate iacs type approved certificate for valves , dampers etc . as per sotr no . gt421400001 rev . 2 , onboard spares for two years onboard spares for two years as per sotr no . gt421400001 rev . 2 , service of engineers for installation service of engineers for installation ( if applicable ) of glass gauge draft indicator . , service of engineers for connectorisatn service of engineers for connectorisation ( if applicable ) of glass gauge draft indicator . , service of setting to work service of setting to work of glass gauge draft indicator . , service of engineers for hat service of engineers for hat of glass gauge draft indicator . , service of engineers for sat service of engineers for sat of glass gauge draft indicator . , operational and maintenance training operational and maintenance training of glass gauge draft indicator . , freight & insurance charges for delivery at grse , submission of design & binding data , ships glass gauge draught indicator 1 . scope of supply as per sor no . gt421400001 rev . 2 2 . inspection , tests and certification: ( i ) inspection is to be carried out by grse ( qa ) /tpi . production schedule and quality assurance plan will be submitted by the equipment manufacturer to the inspecting authority for approval . equipment will be manufactured as per approved qap . for valves , dampers etc . firm to furnish iacs type approved certificates . ( ii ) factory acceptance trial the equipment will be tested after assembly at oems premises and will be inspected and stamped upon successful trials by inspection authority . inspection certificate and factory acceptance trial duly certified by inspection authority are to be furnished along with equipment . the ihq/mod ( n ) and grse reserve the right to depute representatives to witness factory acceptance trials of equipment conducted in india or abroad . firm should intimate schedule of fats at least ten weeks in advance to grse . fat protocol shall be made in line with all tests/trials as per approved graq protocol for hats . ( iii ) weighed weight record of weighed weight duly certified by the inspecting authority shall be furnished by the equipment manufacturer at the time of delivery of the equipment . ( iv ) receipt inspection of the equipment shall be done by grse ( ric ) . ( v ) onboard test and trial onboard test and trial will be conducted as per the format ( graq ) approved by inspecting authority and in presence of representatives of oem , grse , inspection authority and owners authorized rep . ships draught level indicating system consists of glass gauge level indicators , inlet sea valves , first stage hydraulic damper , sec ond stage hydraulic damper , pipelines for delivery , blowing down and discharge , air pipes and stop valves etc . draught readings with scale in mm . at 3 locations in a ship . as per sotr no . gt421400001 rev . 2 , all working drg including dimensionl drg all working drawings including dimensional drawings , maintenance space , fixing arrangement , schematic diagrams etc . as per sotr no . gt421400001 rev . 2 , installatn procedure/manual/ specificatn installation procedure/ manual / specification . as per sotr no . gt421400001 rev . 2 , instructn , operation&maintenance manuals instruction , operation and maintenance manuals , cpl & pil . as per sotr no . gt421400001 rev . 2 , preservatn procedure&maintence schedule preservation procedure and maintenance schedule for equipment . as per sotr no . gt421400001 rev . 2 , onboard test and trial format i . e . graq . onboard test and trial format i . e . graq . as per sotr no . gt421400001 rev . 2 , inspection and test certificate inspection and test certificate as per sotr no . gt421400001 rev . 2 , iacs type approved certificate iacs type approved certificate for valves , dampers etc . as per sotr no . gt421400001 rev . 2 , onboard spares for two years onboard spares for two years as per sotr no . gt421400001 rev . 2 , service of engineers for installation service of engineers for installation ( if applicable ) of glass gauge draft indicator . , service of engineers for connectorisatn service of engineers for connectorisation ( if applicable ) of glass gauge draft indicator . , service of setting to work service of setting to work of glass gauge draft indicator . , service of engineers for hat service of engineers for hat of glass gauge draft indicator . , service of engineers for sat service of engineers for sat of glass gauge draft indicator . , operational and maintenance training operational and maintenance training of glass gauge draft indicator . , freight & insurance charges for delivery at grse , submission of design & binding data , ships glass gauge draught indicator 1 . scope of supply as per sor no . gt421400001 rev . 2 2 . inspection , tests and certification: ( i ) inspection is