| 1 | 1 | Operation and maintenance services (preventive & breakdown) of Sewage Treatment Plant (STP); of capacity 50KLD working on the principle of Fludized Aerobic Bio- Reactor process based on the FAB Process comprising of all machinery equipments installed in STP building including, FAB Reactor, bar screen chambers, Blowers and Aeration System, Air-Diffuser, Multigrad/Activated Carbon Filter, Filter Press, Sewage Relift Pumps, Sludge return pumps, Filter Feed Pumps, soft water supply Pump, FAB Tank, softners, hydropneumetic system, U.V. SYSTEM, electrical panel and all accessories etc. Job also includes to provide the adequate manpower services for operation in three shift of 8 hours each as per special condition including Sundays and holydays and including preventive maintenance of all equipments to ensure the plant in good serviceable condition etc as per special conditon of Contract. 1.TECHNICIAN(SKILLED) = 3NOS. \n | BI01010001010000000000000515BI0100001120 | 12 | Months |
|---|
| 2 | 2 | CMC of 2 x 4.0 KW VFD based Hydro-Pneumatic Panel PLC system (it covers replacement of defective spare parts during contract period and the agency shall be panelised in case of non functioning of system as per SCC of agreement).(Make Kirloskar-KCIL 20/4) | BI01010001010000000000000515BI0100001121 | 1 | Year |
|---|
| 3 | 3 | Supply of following materials for carryout smooth operation and maintenance as per requirement as per site. | | | |
|---|
| 4 | 3.01 | 1) Hypochloride Solution (For Dosing ) | BI01010001010000000000000515BI0100001124 | 150 | Litre |
|---|
| 5 | 3.02 | 2) Gear oil for air compressor (Make: BLOWVACC) | BI01010001010000000000000515BI0100001125 | 20 | Litre |
|---|
| 6 | 4 | Charging of media like anthracite, plain sand, silex etc of multimedia filter etc complete as required. | BI01010001010000000000000515BI0100001126 | 1 | Job |
|---|
| 7 | 5 | Charging of media like activated carbon, plain sand, silex etc. of activated carbon filter etc complete as required. | BI01010001010000000000000515BI0100001127 | 1 | Job |
|---|
| 8 | 6 | Testing of effluent water before and after treatment from Lab and submission of test Certificate every month and test certificate must be obtained from the state pollution board Control Board authorized laboratories for :\ni) pH\nii) Oil & Grease\niii) B.O.D\niv) C.O.D\nv) Total Suspended Solids\nvi) Total Dissolved Solids\nvii) E-Coil | BI01010001010000000000000515BI0100001128 | 12 | Job |
|---|
| 9 | 7 | In House testing of effluent water before and after treatment on daily basis and submission of test report to EIC for the following: 1) PH 2) Permanganate vale 3) B.O.D 4)C.O.D 5) T.O.C ( Testing facility to be set up at the STP Plant) | BI01010001010000000000000515BI0100001129 | 12 | Months |
|---|