Tender For Oh Of Two Units- Boiler Pressure Parts -250Mw Bhel Boiler At Brbcl .
Tender Overview
Project Description
Tender For Oh Of Two Units- Boiler Pressure Parts -250Mw Bhel Boiler At Brbcl . , Oh Of Two Units- Boiler Pressure Pa , Boiler ( Pass-1 ) Cleaning , Boiler ( Pass-2 ) Cleaning , Boiler ( Pass-1 ) Inspection , Boiler ( Pass-2 ) Inspection , Boiler Drum ( <> ) Inspection , Penthouse / Dead Chamber ( <> ) Inspection , Boiler Pressure Parts Thickness Survey , Boiler ( Refract ) & Removal / Apply , Misc Works ( <> ) Repair , Boiler ( Segmntshield ) Repair , Boiler ( Cassetbaffle ) Remove& Apply , Structures ( <> ) Inspection , Matl ( Sky Climber ) Erection , Matl ( Sky Climber ) Connection , Scaffolding ( <> ) Laying , Deptt <> Man . Dep-Sw , Blr Pp Weld Jts ( <> ) Welding , Boiler ( Fins ) Welding , Eco ( Coils ) Lowering , Ltsh ( <=250 Mw# ) Lifting , Hanger ( <> ) Oh , Burner Tilt ( <> ) Serv , Wind Box ( <> ) Oh , Pf Burner ( <> ) Serv , Safety Valve ( <> ) -Serv , Hp Valves ( Dia<=6 ) Serv , Hp Valves ( 50Nb ) Oh , Hp Valves ( Dia<1 ) Oh , Hp Valves 50 Nb Replacement , Hp Valves 100 Nb Replacement , Hp Valve ( Dia>4To 12 ) Replacemen T , Boiler ( <> ) Stress Releiving , Boiler <=250Mw# Stress Releiving , Deployment Of Safety Supervisor , Truck ( Mini ) -Depl / Hiri , Scaffolding ( <> ) Instal / Remove , Amount Linked To Safety Aspects , Amount Linked To Safety
BOQ
| Name of Work: OH OF TWO UNITS- BOILER PRESSURE PARTS -250MW BHEL BOILER AT BRBCL. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 10 | OH OF TWO UNITS- BOILER PRESSURE PA | |||
| 2 | 10.0001 | BOILER (PASS-1)Cleaning | 10.00010_ | 2 | BOI |
| 3 | 10.0002 | BOILER (PASS-2)Cleaning | 10.00020_ | 2 | BOI |
| 4 | 10.0003 | BOILER (PASS-1)Inspection | 10.00030_ | 2 | NO |
| 5 | 10.0004 | BOILER (PASS-2)Inspection | 10.00040_ | 2 | NO |
| 6 | 10.0005 | BOILER DRUM(<>) Inspection | 10.00050_ | 2 | NO |
| 7 | 10.0006 | Penthouse/ Dead Chamber (<>) Inspection | 10.00060_ | 2 | NO |
| 8 | 10.0007 | Boiler Pressure Parts thickness survey | 10.00070_ | 60000 | NO |
| 9 | 10.0008 | BOILER(REFRACT)& Removal/ Apply | 10.00080_ | 25 | MT |
| 10 | 10.0009 | Misc Works (<>)Repair | 10.00090_ | 20 | MT |
| 11 | 10.001 | BOILER (SEGMNTSHIELD)Repair | 10.00100_ | 1500 | NO |
| 12 | 10.0011 | BOILER (CASSETBAFFLE)Remove& Apply | 10.00110_ | 1500 | NO |
| 13 | 10.0012 | Structures (<>)INSPECTION | 10.00120_ | 2 | NO |
| 14 | 10.0013 | MATL (SKY CLIMBER) Erection | 10.00130_ | 2 | NO |
| 15 | 10.0014 | MATL (SKY CLIMBER)Connection | 10.00140_ | 4 | NO |
| 16 | 10.0015 | SCAFFOLDING(<>) Laying | 10.00150_ | 3000 | PC |
| 17 | 10.0016 | DEPTT <> MAN.DEP-SW | 10.00160_ | 300 | NO |
| 18 | 10.0017 | Blr PP Weld JTS (<>) WELDING | 10.00170_ | 1500 | NO |
| 19 | 10.0018 | BOILER (FINS) WELDING | 10.00180_ | 200 | RMT |
| 20 | 10.0019 | Eco (COILS) LOWERING | 10.00190_ | 16 | NO |
| 21 | 10.002 | LTSH (<=250 MW#) LIFTING | 10.00200_ | 16 | NO |
| 22 | 10.0021 | HANGER (<>) OH | 10.00210_ | 2 | LPU |
| 23 | 10.0022 | Burner Tilt (<>)Serv | 10.00220_ | 2 | LPS |
| 24 | 10.0023 | Wind Box (<>) OH | 10.00230_ | 2 | SET |
| 25 | 10.0024 | PF Burner (<>)Serv | 10.00240_ | 2 | SET |
| 26 | 10.0025 | Safety Valve(<>)-Serv | 10.00250_ | 34 | NO |
| 27 | 10.0026 | HP Valves (Dia<=6\") Serv | 10.00260_ | 100 | NO |
| 28 | 10.0027 | HP Valves (50NB) OH | 10.00270_ | 150 | NO |
| 29 | 10.0028 | HP Valves (Dia<1\")OH | 10.00280_ | 200 | NO |
| 30 | 10.0029 | HP VALVES 50 NB REPLACEMENT | 10.00290_ | 20 | NO |
| 31 | 10.003 | HP VALVES 100 NB REPLACEMENT | 10.00300_ | 6 | NO |
| 32 | 10.0031 | HP VALVE(dia>4to 12\")REPLACEMEN T | 10.00310_ | 2 | NO |
| 33 | 10.0032 | BOILER (<>) STRESS RELEIVING | 10.00320_ | 4 | NO |
| 34 | 10.0033 | BOILER <=250MW# STRESS RELEIVING | 10.00330_ | 4 | NO |
| 35 | 10.0034 | Deployment of Safety Supervisor | 10.00340_ | 250 | MD |
| 36 | 10.0035 | Truck(Mini)-Depl/Hiri | 10.00350_ | 60 | NO |
| 37 | 10.0036 | SCAFFOLDING (<>) Instal/Remove | 10.00360_ | 2 | NO |
| 38 | 20 | Amount linked to safety Aspects | |||
| 39 | 20.0001 | Amount linked to Safety | 20.00010_ | 1 | LPS |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender