Construction Of Mini Secretariat Building At Sujanpur , Distt Hamirpur Hp Sh Providing A . C There In .
Tender Value
12.59 Lakhs
Estimated cost
Bid Submission
12 Mar 2020
0 days left
EMD
25200
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Sujanpur → Punjab
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Mini Secretariat Building At Sujanpur , Distt Hamirpur Hp Sh Providing A . C There In .
BOQ
| Name of Work:C/O Mini Secretariate Building at Sujanpur ,Distt Hamirpur (HP)(SH:- Providing A.C there in) | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Supplying and fixing 1.5 ton invertor split type air conditioner Hot and Cold,three star, advanced filter ,E saver mode , quit mode, dual display ,auto clean ,anti bacteria filter jet Cool on/off timer sleep mode compressor cord less remote complete in all respect as per comprising to ISI with latest amendment suitable to operate on 230 volt /240 volt +_ 10 % AC supply capable to perform the function of cooling dehumidification air circulation ventilation and fitting in size of nominal cooling capacity and drain pipe 20 mm dia approximately 3mrs long 2 nos copper pipe with insulator for inlet and outlet approximatey 3 mtrs long and M.S power coated frame /stand for erection of out door unit of split type A.,C including carrigae of material with in all leads and lift.Make -Daikin (model:FTHP50/FTHT50), O Genral/Mitsubsi.as approoved by the Engineer incharge. | 4 | EACH | |
| 2 | 2 | Supplying and fixing 1.8 ton invertor split type air conditioner Hot and Cold,three star, advanced filter ,E saver mode , quit mode, dual display ,auto clean ,anti bacteria filter jet Cool on/off timer sleep mode compressor cord less remote complete in all respect as per comprising to ISI with latest amendment suitable to operate on 230 volt /240 volt +_ 10 % AC supply capable to perform the function of cooling dehumidification air circulation ventilation and fitting in size of nominal cooling capacity and drain pipe 20 mm dia approximately 3mrs long 2 nos copper pipe with insulator for inlet and outlet approximatey 3 mtrs long and M.S power coated frame /stand for erection of out door unit of split type A.,C including carrigae of material with in all leads and lift.Make -Daikin (model:FTHP60/FTHT60), O Genral/Mitsubsi.as approoved by the Engineer incharge. | 11 | EACH | |
| 3 | 3 | Providing, laying and fixing of PVC round sheathed 3 core 1.5 sqmm copper conductor flexible cable for voltage grade up to 1100 volt , on surface/recess PVC conduit as required complete in all respect. Make :-Finolex/Havell/Polycab/KEI or it equivalent as approoved by the Engineer incharge.. | 95 | Meter | |
| 4 | 4 | Providing, laying and fixing of interconnecting copper piping with Nitrile tublar insulation AC indoor to outdoor for split type AC 1.5 ton and 1.8 AC as required complete in all respect. | 95 | Meter | |
| 5 | 5 | Providing, laying and fixing of drian condensate drain water pipe with all necessary fitting for alll type A.C as required complete in all respect. | 30 | Meter | |
| 6 | 5.01 | Making of hole for copper piping in brick | 15 | EACH | |
| 7 | 5.02 | Making of hole for drain piping | 15 | EACH | |
| 8 | 6 | Supplying and fixing of DLP U PVC adaptable trunking on the exiting wall at required height from lower level for power connection, light connection and net working connection including partition chip flexible cover end cap .Make:-Legrand ,MK as approoved by the Engineer incharge. | 60 | EACH | |
| 9 | 7 | Supplying and fixing flat angle 90 degree on the DLP U PVC adaptable trunking for making compect joint .Make:-Legrand ,MK or its equivalent as required complete in all respect . | 3 | EACH | |
| 10 | 8 | Supplying and fixing end cap on the DLP U PVC adaptable trunking,size 105x50 mm .Make :-Legrand ,MK as required complete in all respect . | 8 | EACH | |
| 11 | 9 | Supplying and fixing flat junction for tap -off to an 105 mm vide branch equipped with an 85 mm cover .Make :-Legrand ,MK or its equivalent as required complete in all respect . | 2 | EACH | |
| 12 | 10 | Supplying and fixing body joint of DLP U PVC adpaptable trunking 105x50 mm for aligining during installation .Make :-Legrand ,MK or its equivalent as required complete in all respect . | 28 | EACH | |
| 13 | 11 | Supplying and fixing cover joint for 85-mm widt .Make :-Legrand ,MK or its equivalent as required complete in all respect . | 28 | EACH | |
| 14 | 12 | Supplying and fixing clip for holding the cable in DLP System .Make :-Legrand ,MK or its equivalent as required complete in all respect . | 180 | EACH | |
| 15 | 13 | Steel work welded in builtup sections trusses and frame work including cutting hoisting fixing in position and applying a priming of red lead paint In beams joists chennels angles tee flats with connecting plates or angle ckeats as in main and cross beams hip and jack rafters purlins connecting to common rafters and the like. | 3.5 | Per Qtl. | |
| 16 | 14 | Providing comprehensive maintenance for a period of Five years from the date of commissioning & handing-over of the equipment to the owner as certified by the Engineer-in-charge. The contractor shall guarantee the equipment against all defects of materials and workmanship for the period of Five years, including the compressor. Any defects arising during this comprehensive maintenace period shall be rectified and made good by the vendor at his own risk & cost to the satisfaction owner. The contractor will provide sufficient no. of service/ operator team along with the service spares during the guarantee (defect) period at site. Any defects, including drain, arising will be attended within 24 hours.The rates quoted by the contractor shall be complete including cost of all labour & material etc. | 1 | JOB | |
| 17 | 15 | Note:All the rates quoted by the contractor shall be complete finished work including cost of all labour, material, scaffolding, finishing as required with tools, plants, lead, lift, taxes, tollage, octroi, royalties etc. except those specially excluded in the description of the individual items. All works shall be executed as per drawings, specification and instructions of Site incharge and shall include the supply and installation at site of all the equipment, ancillary materials as specified and all such items what-so-ever which may be required to fulfill the intent and purpose as laid down in the specification and/or the drawings. All materials shall be as per ISI specification and with IS certification marked wherever applicable. The material shall be duly approved by Site incharge before incorporation in the actual work. |
AI Tender Summary
Tender Timeline
Feb 27, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedMar 12, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMar 13, 2020
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender