Rural Development Government Departments Closing in 0 days TDR #23782933

Construction Of Slab Culvert On Pedhi Kurum Road Vr-119 At Ch 0/700 Tq . Bhatkuli ( Third Call )

Issued by Government Departments · BHATKULI, Maharashtra
Tender Value
3.89 Lakhs
Estimated cost
Bid Submission
03 Mar 2020
0 days left
EMD
4000
Bank guarantee accepted
Document Fee
560
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
BHATKULI → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Slab Culvert On Pedhi Kurum Road Vr-119 At Ch 0/700 Tq . Bhatkuli ( Third Call )

BOQ

Name of Work: Construction of Slab Culvert on Pedhi Kurum Road VR-119 at Ch 0/700 Tq.Bhatkuli
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete.\n(SSR 19-20 Item No.12.02) BR.3 Page No. 102\na) Upto 1.50m lift Normal RateBI01010001010000000000000515BI010000111340.04Cum
22Providing rubble filling of trap/ granite/ quartzite gneiss stones for foundations including hand packing filling gravel / sand in the voids etc. complete.\n(SSR 19-20 Item No.11.01) CD.1 Page.No. 159BI01010001010000000000000515BI01000011148.01Cum
33Providing and laying in situ / ready mix cement concrete of M-10 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum type mixer with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc )\n(SSR 19-20 Item No.11.02) CD.-3 Page.No. 160BI01010001010000000000000515BI01000011158.01Cum
44Providing and laying in situ / ready mix M-15 plain cement concrete of trap /granite/quartzite/ gneiss metal for cast in citu piers, abutment, returns, wings etc. including provision of \"V\" shaped false joints to form suitable panels on the faces to approve design with compacting by vibrating and curing complete, including plywood/steel form work centering ( excluding dewatering by means of pump) and including bailling out water and curing finishing in CM 1:3 etc. complete. as directed by engineer in charge basic rate shall be increased for height above 5.00 m in followinh manners \na) Height upto 5 M. (With Concrete Mixer)With Natural / VSI standard Artificial Sand \n( A) Depth to 10 m percent extra for rate\n( B ) Depth upto 15 m Add 40 percent extra for rate\n( C ) Depth upto 20 m Add 60 percent extra for rate\n( D ) Depth upto 20 m Add 100 percent extra for rate\ni) M-15\n(SSR 19-20 Item No.17.38) MORT&H (5th Rev.) 1700, 2204BI01010001010000000000000515BI010000111627.92Cum
55Providing and laying in situ / ready mix M-25 controlled cement concrete of trap/ granite/ quartzite/ gneiss metal for RCC work in solid/ deck slab etc. including ramming, vibrating, curing, formwork, centering and finishing in cement plaster excluding reinforcement etc. complete. (with fully automatic micro processor based PLC with SCADA enabled concrete batch mix plant / pan mixer and fine agreegates of required specifications (Natural sand / VSI sand finely washed etc )\ni) Height up to 5 m, normal rate. \nii) Height 5 to 7.50 m, add 5 percent extra over basic rate.\niii) Height 7.50 to 10 m, 7.50 percent extra.\niv) Over 10 m Height, add 10 percent extra for every 2.50m rise.\n(SSR 19-20 Item No.14.15) BR.38(b and c) Page No. 135 and B. 7, Page No.38BI01010001010000000000000515BI01000011173.95Cum
66Providing, cutting, bending, hooking, tying and laying in position TMT FE 500 steel bars for reinforcement for all RCC works as per detailed drawings etc. complete.\n(SSR 19-20 Item No.14.01) BR.35 Page No. 134BI01010001010000000000000515BI01000011180.4MT
77Back filling behind abutment, wing wall and return wall as per drawings and technical specifications etc. complete. (by granular material)\n(SSR 19-20 Item No.12.70) MORT and H 2200 &-710.1.4 of iRC 78BI01010001010000000000000515BI01000011192.87Cum
88Providing and laying 0.90 meter thick metal mat consisting of rubble, oversize metal and normal size metal in specified thickness as per detailed drawing including supplying all materials, hand packing of rubble, spreading metal in layers and hard murum including watering and compaction with power roller etc. complete.\n(SSR 19-20 Item No.14.88) As directed by Engineer in chargeBI01010001010000000000000515BI010000112011.26Sqm
99Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed.\n(SSR 19-20 Item No.2.11) MORTH 301BI01010001010000000000000515BI010000112145Cum
1010Watering and compacting the embankment formed ofmaterials obtained from the road cutting, departmental landsor other sources within a lead of 50 m. after laying them inlayers of 20 cm to 30 cm with 3% Camber and designsuperelevation etc. complete. (Compaction with Power roller).\nRate as Per S.E. Correrendum 3604 Dt. 17-07-19 It No.11BI01010001010000000000000515BI01000011229Cum
1111Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)\na) 80 mm Metal, By breaking Boulders (Hand broken)\n(SSR 19-20 Item No.50.56) As directed by Engineer-in-chargeBI01010001010000000000000515BI01000011231.2Cum
1212Supplying hard murum/ kankar at the road site, including conveying and stacking complete.\n(SSR 19-20 Item No.2.29a)BI01010001010000000000000515BI01000011255.1Cum
1313Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)\nb) 40 mm Metal, By breaking Boulders (Hand broken) \n(SSR 19-20 Item No.50.57) As directed by Engineer-in-chargeBI01010001010000000000000515BI01000011261.2Cum
1414Supplying soft murum at the road site, including conveying and stacking complete.\n(SSR 19-20 Item No.2.29b)BI01010001010000000000000515BI01000011270.4Cum
1515Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge .\n(SSR 19-20 Item No.50.58) As directed by Engineer-in-chargeBI01010001010000000000000515BI01000011283.6Cum
1616Spreading hard murum/ soft murrum/ gravel or kankar for side width complete\n(SSR 19-20 Item No.2.30)BI01010001010000000000000515BI01000011295.5Cum
1717Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.\n(SSR 19-20 Item No.50.59) As directed by Engineer-in-chargeBI01010001010000000000000515BI010000113012.16Sqm
1818Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.\n(SSR 19-20 Item No.50.61) As directed by Engineer-in-chargeBI01010001010000000000000515BI010000113124.32Sqm
1919Surface Dressing -- Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller. --\nb) 13 mm nominal chippling size (bitumen 10.00 kg/10 Sq.M -- Bitumen of specified grade (VG-30 bulk bitumen rates are considered to arrive at rates)\n(SSR 19-20 Item No.4.05) MORTH 510BI01010001010000000000000515BI010000113212Sqm
2020Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete.\n(SSR 19-20 Item No.2.31)BI01010001010000000000000515BI010000113310.58Sqm
2121Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge \n(SSR 19-20 Item No.6.36) MORTH 801BI01010001010000000000000515BI01000011341No
2222CEMENT\nStandard ConsistancyBI01010001010000000000000515BI01000011351No
2323FinenessBI01010001010000000000000515BI01000011361No
2424Specific GravityBI01010001010000000000000515BI01000011371No
2525Initial Setting Time, Final Setting TimeBI01010001010000000000000515BI01000011381No
2626Compressive StrengthBI01010001010000000000000515BI01000011391No
2727Soundness by Lechatelier ApparatusBI01010001010000000000000515BI01000011401No
2828Aggregate\nWater AbsorptionBI01010001010000000000000515BI01000011411No
2929Impact ValueBI01010001010000000000000515BI01000011421No
3030Gradation (Sieve Analysis)BI01010001010000000000000515BI01000011431No
3131Flakiness Index & Elongation IndexBI01010001010000000000000515BI01000011441No
3232Mix Design\nConcrete Mix Design M-25BI01010001010000000000000515BI01000011451No
3333Fine Aggregate\nFineness Modulus (Sieve Analysis)BI01010001010000000000000515BI01000011461No
3434Silt and Clay ContentBI01010001010000000000000515BI01000011471No
3535Concrete\nCompressive Strength of C.C. cube (set of 3 cubes)BI01010001010000000000000515BI010000114816No
3636Rubble\nWater AbsorbtionBI01010001010000000000000515BI01000011491No
3737Impact ValueBI01010001010000000000000515BI01000011501No
3838Hard & Soft Murum\nLiquid limit & plastic limitBI01010001010000000000000515BI01000011511No
3939Steel\nTensile Strength, Elongation, Yield Stress, Weight Per Meter, Bend / Rebend Test, Proof StressBI01010001010000000000000515BI01000011525No
4040Royalty ChargesBI01010001010000000000000515BI010000115348.41Cum

AI Tender Summary

OUR REF NO 23782933
AUTHORITY Government Departments
TENDER VALUE 3.89 Lakhs
LAST DATE 03-03-2020
Authority
Authority Name Rural Development Department
Work Description Construction Of Slab Culvert On Pedhi Kurum Road Vr-119 At Ch 0/700 Tq . Bhatkuli ( Third Call )
Basic Detail
Tender No NO/EE/ZP /AMT/E-TENDER/NIT13/ 2019_20
Bidding Type Tender
Location
City BHATKULI
State Maharashtra
Key Dates
Publish Date 26 Feb 2020
Submission Date 03 Mar 2020
Open Date 04 Mar 2020
Finance
Tender Value 3.89 Lakhs
Tender Fee 560
EMD 4000
Exemption Not Available
Document List
Tendernotice_1.pdf
BOQ_969581.xls
D6A08A8E-8D11-4DBF-A969-C4124BB1AEBD.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 26, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 03, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 04, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

xls

BOQ_969581.xls

html

D6A08A8E-8D11-4DBF-A969-C4124BB1AEBD.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders