}

Job Order Maintenance And Operation Of Air Conditioner Plants At Mewr , Bgrp , Wed , Nsd And Inhs Patanjali And Dg Set At Inrhs Patanjali Under Ge Sb Karwar, GE (Seabird), Naval Base, Karwar-Karnataka

Military Engineer Services-MES has published Job Order Maintenance And Operation Of Air Conditioner Plants At Mewr , Bgrp , Wed , Nsd And Inhs Patanjali And Dg Set At Inrhs Patanjali Under Ge Sb Karwar. Submission Date for this Tender is 03-03-2020. Diesel Generators Tenders in GE (Seabird), Naval Base, Karwar Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

23762952
Job Order Maintenance And Operation Of Air Conditioner Plants At Mewr , Bgrp , Wed , Nsd And Inhs Patanjali And Dg Set At Inrhs Patanjali Under Ge Sb Karwar
Open Tender
Indian
Karnataka
GE (Seabird), Naval Base, Karwar
03-03-2020

Tender Details

Job Order Maintenance And Operation Of Air Conditioner Plants At Mewr , Bgrp , Wed , Nsd And Inhs Patanjali And Dg Set At Inrhs Patanjali Under Ge Sb Karwar

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 2.15 Lakhs /-

BOQ Items

Name of Work ;MAINTENANCE & OPERATION OF AC PLANTS AT MEWR, BGRP, WED, NSD AND INHS PATANJALI AND DG SET at INRHS PATANJALI UNDER GE (SB) KARWAR 18 days
Sl. No. Item Description Item Code / Make Quantity Units
1 1 MAINTENANCE & OPERATION OF AC PLANTS AT MEWR, BGRP, WED, NSD AND INHS PATANJALI AND DG SET at INRHS PATANJALI UNDER GE (SB) KARWAR 18 days\nThe maintenance works as mentioned below is proposed to be carried out for provisioning of services for operation and routine maintenance of AC installations:- (For 18 days).\n1. Maintenance & operation of central AC plant at MEWR condensing unit complete of 3 Nos. 150 TR capacity ( 2 x 150 TR running and 1 x 150 TR standby) (Make :-BLUE STAR , Model No. LCWR2-150 at MEWR complete with cooling tower AHU & other accessories each for 24 hrs 3 shifts around the clock run daily.\na) Water cooled package chiller unit model LCWR-2-150 -03Nos. \nb) Chiller water pump motor Model ND-180 M capacity 25 HP, Make - Crompton Greaves -03Nos \nc) Chiller water pump set Model SDC 100/125 capacity 82 CMH at 40 Mtr head , Make Becon Weir Ltd -03Nos \nd) Condeser water pump set Model BWC 100/125 capacity102 CMH at 25 Mtr head , Make Becon Weir Ltd -03Nos \ne) Condeser water pump motor Model ND-160 L capacity 20 HP, Make - Crompton Greaves -03Nos \nf) Air handling unit with blower motor-07 No. Make - Blue Star\ng) FRP Cooling tower capacity 563 USGPM, Model AQ 3872 with CT fan-03No. Make Paharpur\nh) Electrical control panel cubical type floor mounted with maint switch MCB's voltmeter, Ammeter, Starter Condenser etc. complete-01Set.\ni) Control devices such as expansion valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.\nj) Digit type thermometer-01 Set\nk) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.\nl) Condenser piping MS 100/80/50mm dia with valves pressure gauge temperature gauge complete -1Set.\n2. Maintenance & operation of package type AC plant at BGRP of capacity of 7.5 ton-03 Nos. ( 2 x 7.5 TR working and 1x 7.5 TR standy) Make : Blue Star, Model DPW-1322 S running daily 8 hrs. 01 shift for smooth functioning of entire system and to maintain specific temperature as directed complete. AC plants consists of the following accessories:- \na) Package type Air conditioning Plant sealed compressor condenser Model DPW 1322S-02 Nos. (1 W,1S) \nb) Condenser water pump motor Model BWC-40 capacity 102 CMH at 25 mtr head Make Becon Weir Ltd- 03 Nos\nc) Condenser water pump motor Model ND-90L capacity 3 HP Make- Crompton Greaves-03 Nos\nd) FRP type Cooling tower with blower motor Model AQ 3810, capacity 30 USGPM, Make Paharpur-03 Nos.\ne) Electric control panel cubical type main switches, starter voltmeter, ammeter contractors -01Set.\nf) Control devices such as expansive valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.\ng) Sealed AHU with cooling coil and blower motor-02Set.\nh) Ducting for supply air with grills diffusers dampers per and re heater etc.-01Set.\n3. Maintenance & operation of central AC plant DX Unit at WED, (2x30 TR working and 01 x 30 TR stand by) (Make: - BLUE STAR, Model No. WCUS2-030 condensing unit complete of 3 Nos. complete with cooling tower AHU & other accessories each for 24 hrs 3 shifts around the clock run daily\na) Water cooled unit model WCUS2-30 -03Nos. \nb) Condeser water pump set Model BWC 80/100 capacity 102 CMH at 25 Mtr head , Make -Becon Weir Ltd -03Nos \nc) Condeser water pump motor Model ND-112 M capacity 5 HP, Make - Crompton Greaves -03Nos \nd) Air handling unit with blower motor-01 No. Make - Blue Star Model ESHX 4-420 of 41000 cmh\ne) FRP Cooling tower capacity 113 USGPM, Model AQ 3822 with CT fan-03No. Make Paharpur\nf) Electrical control panel cubical type floor mounted with maint switch MCB's voltmeter, Ammeter, Starter Condenser etc. complete-01Set.\ng) Control devices such as expansive valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.\nh) Digit type thermometer 01 Set\ni) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.\nj) Condenser piping MS 100/80/50mm dia with valves pressure gauge temperature gauge complete -1Set.\n\n\n 1 JOB
2 1.01 4. Maintenance & operation of Central AC Plant DX unit of capacity 3X30 TR (2x30 TR working and 01 x 30 TR stand by) (Make: - BLUE STAR, Model No. WCUS 2-030 at NSD complete with cooling tower, AHU & other accessories in 03 shifts as per timings decided by Engineer in charge for efficient and continuous running / operation of central AC Plant and its electrical panel board with other installation / equipment’s as mentioned below:-\n (a) Water cooled DX unit model LCUS2-030 - 03 Nos\n (b) Condenser water pump model 2U1 capacity of 17 CMH at 25 Mtr head, \n Make-Becon Weir Ltd - 03 Nos.\n (c) Contenser water pump motor Model ND-112 m CAPACITY 5 HP, Make-Crompton Greaves -03 Nos \n (d) Air handling unit with blower motor heater bank, cooling coil, electric control panel, complete, \n Installed in AHU room-01 No. Make-Blue star Model ESHWX 6-160 of 17000 CMH\n(e) FRP Cooling tower capacity 75 USGPM, Model AQ 3831 with CT fan-03 Nos Make Paharpur (2 No working and 1 No standby)\n(f) Electrical control panel cubical type floor mounted with maint switch MCB's volmeter, Ammeter, Starter Condenser etc. complete-01 set\n(g) Control devices such as expansive valve thermostat solenoid valve HP/LOP/CP cut outs with panel board installed gauges-01 set.\n(h) Digit type thermometer - 01 set\n(j) Air supply duct with grill diffusers dampers and heater etc complete - 01 set\n(k) Condenser piping MS 100/80/50 mm dia with valves pressure gauge temperature gauge complete -1 set.\n5. Maintenance & operation of central AC plant at INHS Patanjali condensing unit complete of 3 Nos. 90 TR capacity ( 2 x 90 TR running and 1 x 90 TR standby) (Make :-BLUE STAR , at Patanjali complete with cooling tower AHU & other accessories each for 24 hrs 3 shifts around the clock run daily \na) Water cooled unit model LCWR1-90-03Nos. \nb) Condenser Pump set of 15HP motor capacity - 03 Nos (Condenser water pump with 3 phase induction motor Make Kirloskar , butterfly valve NRV valve strainer etc with head 30 meter discharge 102 cum / hr make Beacon Weir)\nc)Chiller pump set of 15 HP motor capacity - 03Nos (Chiller water pump with 3 phase induction motor make Kirloskar including butterfly valve NRV valve strainer etc with pump head 30 meter discharge 82 cm/hr)\nd) Induced draft cross flow Cooling Tower (FRP) capacity 300 USGPM each fitted with 1.5 HP, 415V/3ph/50 Hz driving 6 blade fan - 03 Nos (Cooling Tower with 2x10000 liters PVC syntex tank (make up tank) capacity Make :- Paharpur Cooling Tower Ltd.)\nh) Electrical control panel cubical type floor mounted with maint switch MCB's voltmeter, Ammeter, Starter Condenser etc. complete-01Set.\nj) Control devices such as expansion valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.\nk) Digit type thermometer-01 Set \nl) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.\nm) Condenser piping MS 100/80/50mm dia with valves pressure gauge temperature gauge complete -1Set. \n6. Maintenance & operation of DG set 2 Nos 320 KVA capacity each ( one working and one standby)\ninstalled at INHS Patanjali for three (03) shifts round the clock on all days including Sunday \nand holiday comprising the following equipment all as directed by Engineer -in -charge\n(a) Engine Model No 7BD2 V12 MKII HP-396 ,Alternator 320 KVA ,3 phase 415 Volts \n Make Crompton Greaves Ltd -02 Nos\n(b) AMF panel/Synchronise panel rating 2x320 KVA 415 Volts 3 phase with accessories such as ACB 800 Amps 50 KA -02 Nos Auto/main control relay -02 Nos and digital metering etc -01 Nos\n(c) LT distribution panel 3 phase 415 Volts with accessories such as ACB 1000 Amps 65 KA -02 Nos .MCCB 800 Amps -02 Nos MCCB 630 Amps -02 Nos MCCB 250 Amps -01 Nos.\n(d) DG Auxilary panel-01 Nos\nNOTE FOR Item No 6- \n(i) The unit rate quoted shall be deemed to be include for daily routine maintenance as detailed below for trouble free functioning of DG Set and equipment.\n(a)Checking /rectifing of loose connections.\n(b) Maintaing rhe general clearance of the installation\n(c) Check the water /coolent level in radiator & top up as and when required .check oil level & fuel and inform Engr-in-charge.\n(d) Check oil level & fuel and inform Engr-in-charge.\n(e) Check level of electrolyte in battery and top up if required.\n(f) Check battery terminal and if founf loose /tight properly.\n
3 1.02 7. Maintenance & operation of Central AC Plant DX unit of capacity 3X30 TR (2x30 TR working and 01 x 30 TR stand by) (Make: - BLUE STAR, Model No. WCUS 2-030 at NSD complete with cooling tower, AHU & other accessories in 03 shifts as per timings decided by Engineer in charge for efficient and continuous running / operation of central AC Plant and its electrical panel board with other installation / equipment’s as mentioned below:-\n (a) Water cooled DX unit model LCUS2-030 - 03 Nos\n (b) Condenser water pump model 2U1 capacity of 17 CMH at 25 Mtr head, \n Make-Becon Weir Ltd - 03 Nos.\n (c) Contenser water pump motor Model ND-112 m CAPACITY 5 HP, Make-Crompton Greaves -03 Nos \n (d) Air handling unit with blower motor heater bank, cooling coil, electric control panel, complete, \n Installed in AHU room-01 No. Make-Blue star Model ESHWX 6-160 of 17000 CMH\n(e) FRP Cooling tower capacity 75 USGPM, Model AQ 3831 with CT fan-03 Nos Make Paharpur (2 No working and 1 No standby)\n(f) Electrical control panel cubical type floor mounted with maint switch MCB's volmeter, Ammeter, Starter Condenser etc. complete-01 set\n(g) Control devices such as expansive valve thermostat solenoid valve HP/LOP/CP cut outs with panel board installed gauges-01 set.\n(h) Digit type thermometer - 01 set\n(j) Air supply duct with grill diffusers dampers and heater etc complete - 01 set\n(k) Condenser piping MS 100/80/50 mm dia with valves pressure gauge temperature gauge complete -1 set.\n8. Maintenance & operation of central AC plant at INHS Patanjali condensing unit complete of 3 Nos. 90 TR capacity ( 2 x 90 TR running and 1 x 90 TR standby) (Make :-BLUE STAR , at Patanjali complete with cooling tower AHU & other accessories each for 24 hrs 3 shifts around the clock run daily \na) Water cooled unit model LCWR1-90-03Nos. \nb) Condenser Pump set of 15HP motor capacity - 03 Nos (Condenser water pump with 3 phase induction motor Make Kirloskar , butterfly valve NRV valve strainer etc with head 30 meter discharge 102 cum / hr make Beacon Weir)\nc)Chiller pump set of 15 HP motor capacity - 03Nos (Chiller water pump with 3 phase induction motor make Kirloskar including butterfly valve NRV valve strainer etc with pump head 30 meter discharge 82 cm/hr)\nd) Induced draft cross flow Cooling Tower (FRP) capacity 300 USGPM each fitted with 1.5 HP, 415V/3ph/50 Hz driving 6 blade fan - 03 Nos (Cooling Tower with 2x10000 liters PVC syntex tank (make up tank) capacity Make :- Paharpur Cooling Tower Ltd.)\nh) Electrical control panel cubical type floor mounted with maint switch MCB's voltmeter, Ammeter, Starter Condenser etc. complete-01Set.\nj) Control devices such as expansion valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.\nk) Digit type thermometer-01 Set \nl) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.\nm) Condenser piping MS 100/80/50mm dia with valves pressure gauge temperature gauge complete -1Set. \n
4 1.03 4. Maintenance & operation of Central AC Plant DX unit of capacity 3X30 TR (2x30 TR working and 01 x 30 TR stand by) (Make: - BLUE STAR, Model No. WCUS 2-030 at NSD complete with cooling tower, AHU & other accessories in 03 shifts as per timings decided by Engineer in charge for efficient and continuous running / operation of central AC Plant and its electrical panel board with other installation / equipment’s as mentioned below:-\n (a) Water cooled DX unit model LCUS2-030 - 03 Nos\n (b) Condenser water pump model 2U1 capacity of 17 CMH at 25 Mtr head, \n Make-Becon Weir Ltd - 03 Nos.\n (c) Contenser water pump motor Model ND-112 m CAPACITY 5 HP, Make-Crompton Greaves -03 Nos \n (d) Air handling unit with blower motor heater bank, cooling coil, electric control panel, complete, \n Installed in AHU room-01 No. Make-Blue star Model ESHWX 6-160 of 17000 CMH\n(e) FRP Cooling tower capacity 75 USGPM, Model AQ 3831 with CT fan-03 Nos Make Paharpur (2 No working and 1 No standby)\n(f) Electrical control panel cubical type floor mounted with maint switch MCB's volmeter, Ammeter, Starter Condenser etc. complete-01 set\n(g) Control devices such as expansive valve thermostat solenoid valve HP/LOP/CP cut outs with panel board installed gauges-01 set.\n(h) Digit type thermometer - 01 set\n(j) Air supply duct with grill diffusers dampers and heater etc complete - 01 set\n(k) Condenser piping MS 100/80/50 mm dia with valves pressure gauge temperature gauge complete -1 set.\n5. Maintenance & operation of central AC plant at INHS Patanjali condensing unit complete of 3 Nos. 90 TR capacity ( 2 x 90 TR running and 1 x 90 TR standby) (Make :-BLUE STAR , at Patanjali complete with cooling tower AHU & other accessories each for 24 hrs 3 shifts around the clock run daily \na) Water cooled unit model LCWR1-90-03Nos. \nb) Condenser Pump set of 15HP motor capacity - 03 Nos (Condenser water pump with 3 phase induction motor Make Kirloskar , butterfly valve NRV valve strainer etc with head 30 meter discharge 102 cum / hr make Beacon Weir)\nc)Chiller pump set of 15 HP motor capacity - 03Nos (Chiller water pump with 3 phase induction motor make Kirloskar including butterfly valve NRV valve strainer etc with pump head 30 meter discharge 82 cm/hr)\nd) Induced draft cross flow Cooling Tower (FRP) capacity 300 USGPM each fitted with 1.5 HP, 415V/3ph/50 Hz driving 6 blade fan - 03 Nos (Cooling Tower with 2x10000 liters PVC syntex tank (make up tank) capacity Make :- Paharpur Cooling Tower Ltd.)\nh) Electrical control panel cubical type floor mounted with maint switch MCB's voltmeter, Ammeter, Starter Condenser etc. complete-01Set.\nj) Control devices such as expansion valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.\nk) Digit type thermometer-01 Set \nl) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.\nm) Condenser piping MS 100/80/50mm dia with valves pressure gauge temperature gauge complete -1Set. \n6. Maintenance & operation of DG set 2 Nos 320 KVA capacity each ( one working and one standby)\ninstalled at INHS Patanjali for three (03) shifts round the clock on all days including Sunday \nand holiday comprising the following equipment all as directed by Engineer -in -charge\n(a) Engine Model No 7BD2 V12 MKII HP-396 ,Alternator 320 KVA ,3 phase 415 Volts \n Make Crompton Greaves Ltd -02 Nos\n(b) AMF panel/Synchronise panel rating 2x320 KVA 415 Volts 3 phase with accessories such as ACB 800 Amps 50 KA -02 Nos Auto/main control relay -02 Nos and digital metering etc -01 Nos\n(c) LT distribution panel 3 phase 415 Volts with accessories such as ACB 1000 Amps 65 KA -02 Nos .MCCB 800 Amps -02 Nos MCCB 630 Amps -02 Nos MCCB 250 Amps -01 Nos.\n(d) DG Auxilary panel-01 Nos\nNOTE FOR Item No 6- \n(i) The unit rate quoted shall be deemed to be include for daily routine maintenance as detailed below for trouble free functioning of DG Set and equipment.\n(a)Checking /rectifing of loose connections.\n(b) Maintaing rhe general clearance of the installation\n(c) Check the water /coolent level in radiator & top up as and when required .check oil level & fuel and inform Engr-in-charge.\n(d) Check oil level & fuel and inform Engr-in-charge.\n(e) Check level of electrolyte in battery and top up if required.\n(f) Check battery terminal and if founf loose /tight properly.\n7. Maintenance & operation of Central AC Plant DX unit of capacity 3X30 TR (2x30 TR working and 01 x 30 TR stand by) (Make: - BLUE STAR, Model No. WCUS 2-030 at NSD complete with cooling tower, AHU & other accessories in 03 shifts as per timings decided by Engineer in charge for efficient and continuous running / operation of central AC Plant and its electrical panel board with other installation / equipment’s as mentioned below:-\n (a) Water cooled DX unit model LCUS2-030 - 03 Nos\n (b) Condenser water pump model 2U1 capacity of 17 CMH at 25 Mtr head, \n Make-Becon Weir Ltd - 03 Nos.\n (c) Contenser water pump motor Model ND-112 m CAPACITY 5 HP, Make-Crompton Greaves -03 Nos \n (d) Air handling unit with blower motor heater bank, cooling coil, electric control panel, complete, \n Installed in AHU room-01 No. Make-Blue star Model ESHWX 6-160 of 17000 CMH\n(e) FRP Cooling tower capacity 75 USGPM, Model AQ 3831 with CT fan-03 Nos Make Paharpur (2 No working and 1 No standby)\n(f) Electrical control panel cubical type floor mounted with maint switch MCB's volmeter, Ammeter, Starter Condenser etc. complete-01 set\n(g) Control devices such as expansive valve thermostat solenoid valve HP/LOP/CP cut outs with panel board installed gauges-01 set.\n(h) Digit type thermometer - 01 set\n(j) Air supply duct with grill diffusers dampers and heater etc complete - 01 set\n(k) Condenser piping MS 100/80/50 mm dia with valves pressure gauge temperature gauge complete -1 set.\n8. Maintenance & operation of central AC plant at INHS Patanjali condensing unit complete of 3 Nos. 90 TR capacity ( 2 x 90 TR running and 1 x 90 TR standby) (Make :-BLUE STAR , at Patanjali complete with cooling tower AHU & other accessories each for 24 hrs 3 shifts around the clock run daily \na) Water cooled unit model LCWR1-90-03Nos. \nb) Condenser Pump set of 15HP motor capacity - 03 Nos (Condenser water pump with 3 phase induction motor Make Kirloskar , butterfly valve NRV valve strainer etc with head 30 meter discharge 102 cum / hr make Beacon Weir)\nc)Chiller pump set of 15 HP motor capacity - 03Nos (Chiller water pump with 3 phase induction motor make Kirloskar including butterfly valve NRV valve strainer etc with pump head 30 meter discharge 82 cm/hr)\nd) Induced draft cross flow Cooling Tower (FRP) capacity 300 USGPM each fitted with 1.5 HP, 415V/3ph/50 Hz driving 6 blade fan - 03 Nos (Cooling Tower with 2x10000 liters PVC syntex tank (make up tank) capacity Make :- Paharpur Cooling Tower Ltd.)\nh) Electrical control panel cubical type floor mounted with maint switch MCB's voltmeter, Ammeter, Starter Condenser etc. complete-01Set.\nj) Control devices such as expansion valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.\nk) Digit type thermometer-01 Set \nl) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.\nm) Condenser piping MS 100/80/50mm dia with valves pressure gauge temperature gauge complete -1Set. \n9. Maintenance & operation of DG set 2 Nos 320 KVA capacity each ( one working and one standby)\ninstalled at INHS Patanjali for three (03) shifts round the clock on all days including Sunday \nand holiday comprising the following equipment all as directed by Engineer -in -charge\n(a) Engine Model No 7BD2 V12 MKII HP-396 ,Alternator 320 KVA ,3 phase 415 Volts \n Make Crompton Greaves Ltd -02 Nos\n(b) AMF panel/Synchronise panel rating 2x320 KVA 415 Volts 3 phase with accessories such as ACB 800 Amps 50 KA -02 Nos Auto/main control relay -02 Nos and digital metering etc -01 Nos\n(c) LT distribution panel 3 phase 415 Volts with accessories such as ACB 1000 Amps 65 KA -02 Nos .MCCB 800 Amps -02 Nos MCCB 630 Amps -02 Nos MCCB 250 Amps -01 Nos.\n(d) DG Auxilary panel-01 Nos\nNOTE FOR Item No 6- \n(i) The unit rate quoted shall be deemed to be include for daily routine maintenance as detailed below for trouble free functioning of DG Set and equipment.\n(a)Checking /rectifing of loose connections.\n(b) Maintaing rhe general clearance of the installation\n(c) Check the water /coolent level in radiator & top up as and when required .check oil level & fuel and inform Engr-in-charge.\n(d) Check oil level & fuel and inform Engr-in-charge.\n(e) Check level of electrolyte in battery and top up if required.\n(f) Check battery terminal and if founf loose /tight properly.\n(vii) Fuel will be issued by Department through issue voucher free for consumption only for DG Sets.\n\nNote for item No.1 to 6\n(a) Contractor has to employ following staff for manning & operation of the AC plants at each shifts of 8 hours \n(i) One No operator having minimum ITI qualification in Ref Mech/Electrician trade from Govt recognised institute with minimum 2 years’ experience in maintenance & operation of AC plants in each shift of 8 hrs (. The operator must be competent to caryout the routine maintenance & check of AC plant including maintenance/check/inspection of electrical panel board. for Sl Item No 1 to 5 \n\n(ii) One No operator having minimum ITI qualification in FGM/Electrician trade from Govt recognised institute with minimum 2 years experience in maintenance & operation of DG set in each shift of 8 hrs (. The operator must be competent to caryout the routine maintenance & check of DG set installation including maintenance/check/inspection of electrical panel board. for Sl Item No 6\n(b) Contractor will maintain proper records of all kinds of daily, weekly , monthly, quarterly, half yearly, yearly or whatsoever maintenance is carried out during contract period in a binded book/register and will obtain the signature of Engineer-in-Charge\n(c) The operator will ensure general cleanliness and upkeep of the installation on daily basis.\n\nTerms & conditions \n
5 1.04 Terms & conditions \n1. Rates quoted will deemed to have included all taxes like GST as applicable and no separate cost wise be paid on account of same. \n2. Unserviceable dismantled materials will be the property of the department.\n3. You will liable for completion of job works within 20 days of placing Job Order. \n4. 100% payment will be made on completion of job work against your bill.\n5. Job Order can be closed in short notice (i.e 24 hours in advance) on Acceptance of Tender and the payment will be made till the date of acceptance of tender.\n
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail