| 1 | 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | | 109.93 | Cum |
|---|
| 2 | 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stoneaggregate 40 mm nominal size) | | 4.44 | Cum |
|---|
| 3 | 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). | | 8.48 | Cum |
|---|
| 4 | 4 | Reinforced cement concrete work in walls (any thickness), including ttached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up tofloor five level, excluding cost of centering, shuttering, finishing and reinforcement : | | 45.49 | Cum |
|---|
| 5 | 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | | 67.79 | Qtl. |
|---|
| 6 | 6 | Centering and shuttering including strutting, propping etc. and removal of form for all eights:Foundations, footings, bases of columns, etc. for mass concrete | | 9.12 | Sqm |
|---|
| 7 | 7 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Lintels, beams, plinth beams, girders, bressumers and cantilevers | | 113.26 | Sqm |
|---|
| 8 | 8 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Columns, Pillars, Piers, Abutments, Posts and Struts | | 127.99 | Sqm |
|---|
| 9 | 9 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : uspended floors, roofs, landings, balconies and access platform | | 182.09 | Sqm |
|---|
| 10 | 10 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes. | | 540 | Kg |
|---|
| 11 | 11 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shadeTwo or more coats on new work complete. | | 36 | Sqm |
|---|
| 12 | 12 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) | | 20.24 | Cum |
|---|
| 13 | 13 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m | | 209.84 | Cum |
|---|
| 14 | 14 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) | | 35.38 | Sqm |
|---|
| 15 | 15 | Stone work (machine cut edges Veneer work) for wall lining upto 10 m height, backing filled with a grout of 12 mm thick cement mortar 1:3 (1 Cement : 3 coarse sand) and jointed with Cement mortar 1:2 (1 cement : 2 stone dust), including rubbing and polishing complete. (To be secured to the backing and the sides by means of cramps and pins which shall be paid for separately) Kota stone slabs exposed face dressed and rubbed. 25 mm thick | | 57.22 | Sqm |
|---|
| 16 | 16 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) | | 42.86 | Cum |
|---|
| 17 | 17 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : \"1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | | 88.28 | Cum |
|---|
| 18 | 18 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand), including pointing with cement mortar 1:2 (1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone. | | 320.4 | Sqm |
|---|
| 19 | 19 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | | 5023.91 | Kg |
|---|
| 20 | 20 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 1.00 mm thick with zinc coating not less than 275 gm/m² | | 208.62 | Sqm |
|---|
| 21 | 21 | Providing ridges or hips of width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete. 0.80 mm thick with zinc coating not less than 275 gm/m² | | 36.6 | Rmt |
|---|
| 22 | 22 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete | | 7255.35 | Rmt |
|---|
| 23 | 23 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | | 21700 | Rmt |
|---|
| 24 | 24 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction ofEngineer-in-charge. | | 360 | Sqm |
|---|
| 25 | 25 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | | 96.32 | Cum |
|---|
| 26 | 26 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | | 510 | Cum |
|---|
| 27 | 27 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | | 34.52 | Cum |
|---|
| 28 | 28 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications | | 184.5 | Cum |
|---|
| 29 | 29 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4 (Hand mixed) | | 9 | Cum |
|---|
| 30 | 30 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete butment,wingwall,returnwallwith100mmdiaACpipeextendingthrough thefull width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 | | 400 | Rmt |
|---|
| 31 | 31 | Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. In 1:4 cement mortar | | 6.8 | Cum |
|---|
| 32 | 32 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed rubble masonry (1st sort) In 1:4 cement mortar | | 8.08 | Cum |
|---|
| 33 | 33 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m) R.C.C grade M 20. | | 3.29 | Cum |
|---|
| 34 | 34 | Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002,1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6) | | 413.22 | Kg |
|---|
| 35 | 35 | Providing fitting and fixing mild steel railing complete as per drawing and technical specifications Clause 1208.2 | | 184.32 | Rmt |
|---|