Periodical Maintenance Of The Road For The Year 2020-21 From Link Road To Village Ashapuri Under ( Village Road ) ( Drrp No . Vr0024 ) Providing And Laying 25Mm Thick Bitumen Concrete Including Profile Correction Laying With Paver Finisher In Km 2/
Tender Overview
Project Description
Periodical Maintenance Of The Road For The Year 2020-21 From Link Road To Village Ashapuri Under ( Village Road ) ( Drrp No . Vr0024 ) Providing And Laying 25Mm Thick Bitumen Concrete Including Profile Correction Laying With Paver Finisher In Km 2/0 To 3/0
BOQ
| Name of Work: Periodical Maintenance Of The Road For The Year 2020-21 From Link road to Village Ashapuri under (Village Road) (DRRP No. VR0024) (SH:Providing and Laying 25mm Thick Bitumen Concrete I/C Profile Correction Laying With Paver Finisher In Km 2/0 to 3/0) | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Providing, laying, spreading and compacting stone aggregate size 53mm to 22.4mm ( fifty three millimeter to twenty two point four millimeter) Grading-III 75mm (seventy five millimetre) thickness to water bound Macadam specification including spreading in uniform thickness using template, hand packing, rolling with three wheel 80-100 K.N. static roller in stages to proper grade and camber, applying and brooming, stone screening type-B of size 11.2 mm (eleven point two millimetre) nominal size at the rate of 0.18 cyn (zero point eighteen cubic metre) per ten square metre to fill up the interstices of coarse aggregate, watering and compacting to the required density as per M.O.R.D. technical specifications clause No. 405 including carriage of materials within all leads , lifts and other incidentals or as per the directiones of Engineer-In-Charge. The rate including of octroi, royality, GST, Malkana, toll tax, Sale tax or other taxes imposed by the Government. | 24 | Per Cubic metre | |
| 2 | 2 | Providing, laying and rolling of built-up spray grout over prepared base consisting of single Layer composite construction of crushed coarse aggregates using motor grader for aggregates, key stone chips spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the layer to serve as a base, conforming to the line, grade and cross-section specified, the compacted layer thickness being 75 mm (seventy five millimetre) as per technical spacification clause 505 by manual mean bitumen-VG-10 (VG ten) including carriage of materials within all leads , lifts and other incidentals or as per the directiones of Engineer-In-Charge. The rate including of octroi, royality, GST, Malkana, toll tax, Sale tax or other taxes imposed by the Government. | 320 | Per square metre | |
| 3 | 3 | Providing and applying tack coat with Bitument emulsion (RS-I) using emulsion pressure distributor at the rate 0.275 kg (zero point two seven five kilograme) per/ Square metre on the prepared granular surface treated with primer coat cleaned with hydraulic broom as per M.O.R.D. technical specifications section No. 503 or as per the entire satisfaction and direction of Engineer - in- Charge including carriage of materials within all leads, lifts and other incidentals. The rate including of octroi, royality, GST, Malkana, toll tax, Sale tax or other taxes imposed by the Government. | 3200 | Per square metre | |
| 4 | 4 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.50%(five point fifty) per cent by weight of total of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects or as per the direction by the Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including of octroi, royality, GST, Malkana, toll tax, Sale tax or other taxes imposed by the Government. | 80 | Per Cubic metre |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender