Wb-Hmc/Tn/Ed/Dm/20/2019-2020 Estimate For Beautification , Triangular Park On Foreshore Road , Under Nabanna Zone .
Tender Value
20.71 Lakhs
Estimated cost
Bid Submission
04 Mar 2020
0 days left
EMD
41427
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
UNDER HMC AREA → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Wb-Hmc/Tn/Ed/Dm/20/2019-2020 Estimate For Beautification , Triangular Park On Foreshore Road , Under Nabanna Zone .
BOQ
| Name of Work: Estimate for Beautification, Triangular Park on Foreshore Road, Under Nabanna Zone. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | BI01010001010000000000000515BI0100001113 | 45.65 | %cum |
| 2 | 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | BI01010001010000000000000515BI0100001115 | 31.955 | %cum |
| 3 | 3 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) C.(iv) With carried earth arranged by the contractor within a radius exceeding 5 km. but not exceeding 10 km. including the cost of carried earth. | BI01010001010000000000000515BI0100001117 | 186.94 | %cum |
| 4 | 4 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | BI01010001010000000000000515BI0100001119 | 10.53 | %cum |
| 5 | 5 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | BI01010001010000000000000515BI0100001120 | 52.909 | sqm |
| 6 | 6 | Cement concrete with graded jhama khoa (30 mm size)\nexcluding shuttering In ground floor and foundation. (a) 1:3:6 proportion | BI01010001010000000000000515BI0100001122 | 5.3 | cum |
| 7 | 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety | BI01010001010000000000000515BI0100001123 | 54.804 | cum |
| 8 | 8 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and\nbending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and\nupto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel | BI01010001010000000000000515BI0100001126 | 4.302 | MT |
| 9 | 9 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams\nand columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction ofEngineer-In-Charge. | 295.254 | sqm | |
| 10 | 10 | Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth | 50.418 | cum | |
| 11 | 11 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary\n(Ground floor).[Excluding cost of chipping\nover concrete surface] (ii) With 1:4 cement mortar (a) 20 mm thick plaster | 186.353 | sqm | |
| 12 | 12 | Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @\n0.20kg/Sq.m. (b) Area of each tile above 0.09 Sq.m (i) Coloured decorative | 219.833 | sqm | |
| 13 | 13 | (a) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. | 83.738 | sqm | |
| 14 | 14 | (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface :\nWith super gloss (hi-gloss) - (iv) Two coats (with any shade except white) | 83.738 | sqm | |
| 15 | 15 | Supplying, fitting and fixing Stainless Steel railing consist of 38mm dia and 900mm height vertical balustrade at every two alternative steps, 50mm dia top rail, 3 (three ) nos 19mm dia horizontal Strainless steel pipe and base/cover plate with Strainless Steel GRADE 304 containing 7.5% nickle (Interior Grade) Brushed/Mat finish, complete as per direction of the Engineer-incharge. Weight of Strainless Steel railing per metre 6.5 Kg (approx) | 47.85 | Mtr | |
| 16 | 16 | Supplying and fixing grasses tiles of grass Maxican Carpet/Selection No. 1 Healthy & fresh grasses (size 1'x1' or bigger) including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from wees and fit for mowing including supplying good earth as required by Engineer-In Charge.(Rate includes supply of labour, tool & plants including materials) | 124.2 | % Sqm | |
| 17 | 17.1 | Planting hedge plants in two rows at 30 cm apart xii) Ficus infectoria (Pilikhan) of height 135cm-150cm in big polybag of size 25cm-30cm | 203 | Nos | |
| 18 | 17.2 | xi) Ficus elastica Decora ( Rubber plant ) of height 90cm-60cm in each earthen pot of size 25cm. | 200 | Nos | |
| 19 | 17.3 | ii) Rangon chineese of size not less than 20cm | 38 | Nos | |
| 20 | 17.4 | iii) Rangon chineese polythene pack | 47 | Nos | |
| 21 | 18 | Add 12% GST | 1 | each | |
| 22 | 19 | Add 1 % LWC | 1 | each |
AI Tender Summary
Tender Timeline
Feb 17, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedMar 04, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMar 07, 2020
Bid Opening Date
Technical bids will be opened and evaluated.