| 1 | 1 | SITC of underground M.S Pipes (B class) including excavation,cutting, screwing, welding etc. and providing all fittings e.g flanges, bends, tees, elbows reducers, clamps, hinges etc. Underground pipes shall be wrapped & coated by providing twin coating of Bitumen wrapping with first coating bitumen coating Wrapping with bitumen Hessian cloth & finishing with Bitumen paint and re-filling the trenches etc of following sizes:\n\na) 150 mm dia | | 170 | Mtr |
|---|
| 2 | 2 | b) 100 mm dia | | 80 | Mtr |
|---|
| 3 | 3 | c) 80 mm dia | | 26 | Mtr |
|---|
| 4 | 4 | Same as above but for over ground M.S Pipes (B class) including cutting holes & chases in bricks or RCC wall/slab & Making good the same. Painting with one coat of primer and two coats of synthetic enamel of approved shade of following sizes:\n\na) 200 mm dia | | 6 | Mtr |
|---|
| 5 | 5 | b) 150 mm dia | | 30 | Mtr |
|---|
| 6 | 6 | c) 100 mm dia | | 60 | Mtr |
|---|
| 7 | 7 | d) 80 mm dia | | 50 | Mtr |
|---|
| 8 | 8 | e) 65 mm dia | | 30 | Mtr |
|---|
| 9 | 9 | f) 32 mm dia | | 120 | Mtr |
|---|
| 10 | 10 | g) 25 mm dia | | 170 | Mtr |
|---|
| 11 | 11 | SITC of single headed oblique pattern hydrant Landing valve with 80mm dia flanged inlet and 63mm dia Instantaneous type female outlet complete with cap and all Accessories ISI marked. | | 4 | Each |
|---|
| 12 | 12 | Supply of non-percolated flexible hose RRL 63mm dia x 15 mtr long complete with instantaneous type 63mm dia male and female ISI marked coupling and Riverted to hose pipe with riverts and copper wire.& ISI marked | | 8 | Each |
|---|
| 13 | 13 | Supply & installation of gunmetal 63mm dia short branch pipe with 20mm dia nozzle , ISI marked. | | 4 | Each |
|---|
| 14 | 14 | SITC of First aid hose reel wall mounting swinging type complete with drum & brackets, 25 mm dia ball valve & 20 mm dia 30 mtr long high pressure pad hose with shut off nozzle complete as req. | | 4 | Each |
|---|
| 15 | 15 | SITC of cast iron double flanged ISI marked Butterfly valve complete with rubber insertion, nuts, bolts, washers etc. of following sizes:\n\n a) 150 mm dia | | 2 | Each |
|---|
| 16 | 16 | b) 100 mm dia | | 1 | Each |
|---|
| 17 | 17 | c) 80 mm dia | | 6 | Each |
|---|
| 18 | 18 | SITC of following accessories:\n\n a) 25mm dia spring loaded air release valve with isolation cork. | | 2 | Each |
|---|
| 19 | 19 | b) Pressure Guage | | 3 | Each |
|---|
| 20 | 20 | c) Pressure Switch | | 2 | Each |
|---|
| 21 | 21 | d) 25 mm dia gate valve | | 1 | Each |
|---|
| 22 | 22 | SITC of cast iron double flanged ISI marked NRV complete with rubber insertion, nuts, bolts, washers etc. of following sizes:\n\na) 150 mm dia | | 1 | Each |
|---|
| 23 | 23 | b) 100 mm dia | | 1 | Each |
|---|
| 24 | 24 | SITC of gunmetal Fire Brigade connection with collecting head 63mm,4 way instantaneous type male couplings with flanged outlet complete with blank caps nuts, bolts & rubber insertions, conforming IS:904-1983 | | 1 | Each |
|---|
| 25 | 25 | Supplying & laying of 4 core 10 sqmm Aluminum cable from motor to electrical panel for automation of the system. | | 12 | Mtr |
|---|
| 26 | 26 | Supplying & lying of 3.5 core 35 sqmm Aluminum cable frommotor to electrical panel for automation of the system. | | 18 | Mtr |
|---|
| 27 | 27 | S/f of Pendent type sprinkler | | 52 | Each |
|---|
| 28 | 28 | SITC of installation of control valve of CI body,brass/bronze working parts, comprising of water motor alarm,bronze seat clapper,arm and hydraulically operated mechanical gong bell to sound continous alarm when the system activates, alongwith pressure gauge,emergency release,stainer,pressure switch,cock valve complete with drain valve and bypass,test control box and requisite flanges for 100mm dia pipe | | 1 | set |
|---|
| 29 | 29 | SITC of Air vessel 250mm dia and 1.5 mtr high withdished top, made of 6mm thick MS pipe complete with 25 NB dia gun metal air release valve, 20mm dia stop valve,25Nb gun metal pressure release valve,49NB drain valve , pressure guage & all accessories as req and painted. | | 1 | Each |
|---|
| 30 | 30 | Earthing with G.I earth plate (600 x 600x 6) mm thick including accessories & providing masonry enclosure with M.S cover plate & Watering pipe of 40 mm dia etc. as required with charcoal and Salt including excavation and back filling complete as required. | | 1 | Each |
|---|
| 31 | 31 | SITC of diesal Engine driven main fire Pump suitable for automatic operation with broze impeller capacity 1620 LPM with 56mtr head with Diesel Engine of suitable HP,12V/24V starting equipment water cooled with 125 mm suction and 100 mm delivery ; with Base frame, coupling, battery fuel tank, AVM pads etc. complete as required. The pump shall be provided with mechanical seal complete as req. | | 1 | Each |
|---|
| 32 | 32 | SITC of horizontally centrifugal end suction pump complete for delivery 1620 ltr/ min against a total head of 56mtrs. With 40 HP three phase motor with speed of 2900 rpm with bronze impeller and coupling, base frame and AVM pads complete as required. The pump shall be provided with mechanical seal. | | 1 | Each |
|---|
| 33 | 33 | SITC of horizontally mounted centrifugal pump complete for delivery 180 ltr/ min against a total head of 56mtrs. With 10 HP three phase motor with speed of 2900 rpm with bronze impeller and coupling, base frame and AVM pads complete as required. The pump shall be provided with mechanical seal. | | 1 | Each |
|---|
| 34 | 34 | Design, manufacturer, supply, installing testing and commissioning of following MV switchgear panels suitable for 415V, 3 phase, 4 wire, 50 Hz power distribution system. The panel should be indoor , free standing, floor mounting, sheet metal clad, cubicle, dead front, dust and vermin proof conforming to IP-55 enclosure, compartmentalized design, fabricated out of 14 SWG sheet steel complete with AC busbars, seperate earth bus bar to be provided through out the length of the panel. the incoming and outgoing feeders shall be accommodated in a modular multitier arrangement, adequate size cable alley painting earthing numbering, damper plate etc. as required as per specifications and drawings. the panel shall withstand a fault level of 50 MVA.\nIncoming Section: \n1 No. 250 A TP & N MCCB 50 KA \nSet of 4 strip 415 V copper bus bars of 300 A capacity and suitable length \n2 No. Current transformer (300/5A.) \n1No. ammeter 0-500 Amps with selector switch. \n1No. 0-500 V voltmenter with selector switch. \n1 set ( Nos.) of phase indication lamps with HRC fuses \nOutgoing Section (Main Fire Pump) \n2nos. 200 Amps TP &N MCCB 50 KA 1 spare) \n1No. Automatic Star/ Delta Starters complete with over load relay and single phasing \npreventor feature. ON/OFF TRIP, indication lamp, contactors etc. Suitable for 50HP motor \n(1no. Main fire pump + 1no. Sprinkler pump). \n3 Nos. Current transformers (250/5 A). \nAmmeter 0-250 A \nWiring from pressure switch to starter. Lot \nJockey pump \n1 No. DOL starter with over load and single phase preventor feature. ON/OFF & TRIP, indicator lamp, contactors etc. Suitable for 20 KW motor with 1 no. 63 A TP &N MCCB, Ammeter (0-63 A) with selctor switch. Set of control system to make the system automatic as per functional requirements 3 no. Pressure switch Wiring from pressure switch to starter. Lot | | 1 | Each |
|---|
| 35 | 35 | Diesel Control Panel \nProvision for starting the diesel engine fire pump. The diesel engine driven fire pump shall start automatically in the event of pressure drop beyond preset limit on mains failure or failure of electrical driven pumps to start and logic necessary for automatic start of diesel engine alongwith battery charger for the diesel engine set \nseparate neutral link to be provided whereaver TP MCCB are used. \nAll MCCB shall have breaking capacity of 50 KA unless otherwise specified. Necessary cabling, wiring, earthing from panel to individual equipment whll be included in the quoted price.\nFollowing provisions to be made in the fire panel: \nAudio visual alarm & indications having disconnect/ reset facility with a range of 1/2 km.. The indication shall come on when electrical driven pump set fails to start on pressure drop or when there is power failure during pressure drop. Facility for mode selection ie auto or manual. Protection failure & control cabling disconnect/ reset facility with a range of 1/2 km. The indication shall come on when electrical driven pump set fails to start on pressure drop or when there is power failure during pressure drop.Facility for mode selection ie auto or manual.Protection failure & control cabling | | | |
|---|
| 36 | 36 | Supply & installation of weather proof hose cabinetsfabricated from 18 swg MS sheet/section with full front glass door and suitable to accommodate 2 nos 15 mtr long hoses and 1 no branch pipes as req. | | 4 | Each |
|---|
| 37 | 37 | P/f 25 mm x 5 mm G.I strip from earth electrode, on surface or in recess for earth connections as required. | | 25 | Mtr |
|---|
| 38 | 38 | SITC of gunmetal suction coupling for Fire Brigade drawal of water from fire tank of 100 mm dia. | | 1 | Each |
|---|
| 39 | 39 | S.I.T.C of Analog Addressable Photo smoke detector. | | 40 | Each |
|---|
| 40 | 40 | S.I.T.C of Analog Addressable ROR Heat detector. | | 5 | Each |
|---|
| 41 | 41 | S.I.T.C of Response Indicator with suitable 16 SWG cover of acrylic sheet minimum 2 mm thick & LED as req. | | 30 | Each |
|---|
| 42 | 42 | S.I.T.C of Analog Addressable resetable type Manual call box complete as req. | | 4 | Each |
|---|
| 43 | 43 | S.I.T.C of Analog Addressable hooter with audible range of 25-30mtr with suitable output wattage as req. | | 4 | Each |
|---|
| 44 | 44 | SITC of Analog Addressable Fire Alarm main control panel with battery backup for 4 hour complete. | | 1 | Each |
|---|
| 45 | 45 | S/l of 2 x 1.5 sqmm dia PVC insulated copper conductor armoured cable directly on the surface complete as req. | | 600 | Mtr |
|---|
| 46 | 46 | S/F of following sizes of PVC conduit along with accessories on surface i/c painting as req.\n\na) 20 mm dia | | 20 | Mtr |
|---|
| 47 | 47 | b) 25 mm dia | | 10 | Mtr |
|---|
| 48 | 48 | NOTE:-\n1. The measurable quantities may vary at the time of execution of work at site and shall be allowed as per actuals within the estimated cost. | | | |
|---|