| 1 | Periodical Renewals to Wanaparthy to Pebbair road from Km 8/0 to 19/7 in Wanaparthy District | as per MoRT&H (5th Revision) Specn. No.305.4.3 | 1558.00 | Sqm | 8.80 | 13710.00 |
| Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3 |
| 2 | Periodical Renewals to Wanaparthy to Pebbair road from Km 8/0 to 19/7 in Wanaparthy District | as per MoRT&H specification 406 (5th revision) | 278.00 | Cum | 2133.00 | 592974.00 |
| Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work. |
| 3 | Periodical Renewals to Wanaparthy to Pebbair road from Km 8/0 to 19/7 in Wanaparthy District | as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge. | 1953.00 | Sqm | 37.20 | 72652.00 |
| Providing and aplying Prime coat with bitumen emulsion (Slow setting SS1) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge. |
| 4 | Periodical Renewals to Wanaparthy to Pebbair road from Km 8/0 to 19/7 in Wanaparthy District | as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge | 11907.50 | Sqm | 9.80 | 116694.00 |
| Providing and applying tack coat with VG-10 (Bulk) using Bitumen pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge. |
| 5 | Periodical Renewals to Wanaparthy to Pebbair road from Km 8/0 to 19/7 in Wanaparthy District | as per MoRT&H Specification 507 (5th revision) | 357.00 | Cum | 8022.00 | 2863854.00 |
| Providing 30 mm thick compacted Bituminous Concrete with 100-120 TPH batch type hot mix plant/40-60 TPH Drumtype HMP using HBG crushed aggregates of Grading ? 2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and filler, transporting the hot mix to work site, laying with Mechnical Paver to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge |
| 6 | Periodical Renewals to Wanaparthy to Pebbair road from Km 8/0 to 19/7 in Wanaparthy District | as per MoRT&H specification 305 | 395.00 | Cum | 226.00 | 89270.00 |
| Forming shoulders with borrowed useful earth from outside road boundary having MDD not less than 1.75 gm/cc by mechanical means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and (excluding seigniorage) charges, complete for finished item of work as per MoRT&H specification 305 |