| 1 | SWD | 0.0 | 10.90 | Cum | 201.10 | 2192.00 |
| Carting the excavated earth to a lead of 15 KMS including Labour chargess for loading and unlosding, Transportation etc. complete as per specification |
| 2 | SWD | 0.0 | 4.92 | Cum | 5012.04 | 24659.00 |
| Supply and placing of the M-20 Design Mix Concrete by ready mix, mixed in a batching and mixing plant as per approved mix design, for sub base over a prepared subgrade, cement content not to be less than 350Kg/Cum with crushed stone coarse aggregate of 25 mm and 12.5 mm nominal sizes graded as per table 600-1, with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, concrete strength not to be less than 10 Mpa at 7 days, including cost and conveyance of all materials like cement, sand, coarse aggregate, water, centering etc., to site, all labour charges for mixing, transported to site by transit mixer, pumping and laying concrete, centering and vibrating, curing and finishing etc. excluding centering charges complete, for finished item of work, as per Technical Specification 601 MORTH etc., complete for finished item of work- For CC Roads. |
| 3 | SWD | 0.0 | 3.88 | Cum | 5746.94 | 22298.00 |
| PCC Grade M20 - Nominal Mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, shuttering curing exculding centering, etc.,complete for finished item of work. |
| 4 | SWD | 0.0 | 12.00 | Each | 3800.00 | 45600.00 |
| Supply and placing of frc hd covers with frames including cc and lc of all materials etc complete. |
| 5 | SWD | 0.0 | 33.72 | Cum | 32.19 | 1085.00 |
| Refilling of excavated earth soils including cost and conveyance of all material charges as per specification |
| 6 | SWD | 0.0 | 49.14 | 10 sqm | 899.33 | 4419.00 |
| Flush pointing with CM (1:3) to RR Masonary, including cost and conveyance of all materials to site, on all materials, labour charges on all materials, curing etc. complete for finished item of work. |
| 7 | SWD | 0.0 | 21.45 | Cum | 3816.55 | 81865.00 |
| Construction of RR masonary in CM(1:6) prop including Cost & conveyance of all materials like Cement, Sand , Water, Granite Stones, Etc., including cost of seigniorage charges on all Materials all required size and shape mixing of Cement Mortor Construction, Scaffolding charges Curing, Etc., complete for finished item of work.(As per SS 615). per 1 cum (New stone ) |
| 8 | SWD | 0.0 | 9.19 | Cum | 2947.86 | 27091.00 |
| Construction of RR masonary in CM(1:6) prop including Cost & conveyance of all materials like Cement, Sand , Water, Granite Stones, Etc., including cost of seigniorage charges on all Materials all required size and shape mixing of Cement Mortor Construction, Scaffolding charges Curing, Etc., complete for finished item of work.(As per SS 615). per 1 cum (Dept stone ) |
| 9 | SWD | 0.0 | 10.00 | Each | 348.00 | 3480.00 |
| Manufacture Supply and Delivery of 450mm dia collors RCC collors conforming to BIS 458/2002,450 mm dia RCC NP2 class pipe including cost & conveyance of all material and labour charges etc. |
| 10 | SWD | 0.0 | 50.00 | Rmt | 236.00 | 11800.00 |
| Lowering the RCC plain ended 450mm dia NP2 pipes carefully into the trench laying them true to alignment and gradient jointing RCC pipes with cement joints including curing the cost of joining material i.e cement mortor(1:1:5) hemp yarn an testing including filling with water with lead up to 500 meters excluing cost of rubber rings as per BIS no.783/85 |
| 11 | SWD | 0.0 | 50.00 | Rmt | 845.29 | 42265.00 |
| Manufacture, Supply and delivery of RCC plain ended pipes conforming to B.I.S 458/2003 NP2 450mm class pipe complete as per standard specification including cost and conveyance of all material charges as per specifications |
| 12 | SWD | 0.0 | 4.90 | Cum | 3713.59 | 18197.00 |
| Plain Cement concrete in (1:5:10) prop. Using 40 mm Hard Granite Machine Crushed metal including cost and conveyance of materials to site including curing, Machine mixing, concrete laying tamping, vibrating, watering curing and all labour charges, hire and operational charges of machinery, water lead charges and including curing etc. complete for finished item of work for catchpit. |
| 13 | SWD | 0.0 | 31.10 | Cum | 254.81 | 7925.00 |
| Dismantling of RR masonary including all charges complete |
| 14 | SWD | 0.0 | 82.47 | Cum | 226.77 | 18702.00 |
| Earthwork excavation and depositing on bank with an initial lead of 10m and initial lift of 2m in case of head load only in loamy and clay soils like black cotton soil red earth of ordinary gravel SS 20-B as per specification. |
| 15 | SWD | 0.0 | 15.70 | Cum | 2277.00 | 35749.00 |
| Cutting open C.C. road surface including stacking of excavated materials including hire charges of all tools and plants and all labour charges for finished item of work as directed by the Engineer - in - Charge. |