Airports Authority Of India has published Environmental Monitoring I . E . Analysis Of Water And Waste Water Samples , Ambient Air Samples , Noise Level Monitoring And Dg Stack Monitoring For The Year ( 2020-21 ) At S . V . P . I Airport , Ahmedabad. Submission Date for this Tender is 21-02-2020. Environmental Monitoring Service Tenders in AAI, SVPI Airport, Ahmedabad Gujarat. Bidders can get complete Tender details and download the document.
Name of Work: Environmental Monitoring i.e. Analysis of water and waste water samples, Ambient air samples, Noise level monitoring and DG stack monitoring for the year (2020-21) at S.V.P.I Airport, Ahmedabad. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code | Quantity | Units | |
1 | 1 | Bore well water tests.\n(PH, Dissolved Oxygen, Biochemical Oxygen Demand, Chemical Oxygen Demand, Total Dissolved Solids, Total Hardness, Calcium, Magnesium, Iron, Manganese, Chlorides, Sulphates, Nitrates, Fluorides). | item 1 | 4 | each |
2 | 2 | Ambient air monitoring -24 hourly basis as per MOEF regulation dated 18th November 2009.\n(Particulate matter PM10, Particulate Matter PM2.5, Ozone, CO, Lead, SO2, NO2, Ammonia, Benzene, Benzo(a)pyrene, Aresenic, Nickel, HC) | item 2 | 104 | each |
3 | 3 | Noise monitoring- for 24 hours at one hour interval.\n(Instantaneous dB (A) , providing Leq, Lday, Lnight, Ldn, etc. using Type-1 sound level meter). | item 3 | 104 | each |
4 | 4 | DG stack monitoring .\n(SPM, SO2, NOX). | item 4 | 56 | each |
5 | 5 | DG source noise monitoring during on/off condition as per GPCB guidelines . | item 5 | 112 | each |
6 | 6 | Sewage water sampling and analysis including microbiological analysis as per GPCB guidelines. | item 6 | 24 | each |
7 | 7 | Providing monthly consultancy services to carry out the following activities for complying with Gujarat pollution control Board (GPCB) CCA (Consent) requirements.\nA. Data management for hazardous waste generation and disposal of all used oil generated and auctioned by MSTC.\nB. Study on water consumption and waste water generation and submission of timely returns to competent authority including CGWA and SGWA.\nC. Management filing of all returns due for submission to GPCB.\nD. Answers and technical guidance to all GPCB related consent issues and other problems faced with STP , DG sets and Environmental management systems.\nE. Submission of Annual Environment Statement , Form-IV, Form-V and Monthly Patrak on GPCB XGN. | item 7 | 12 | each |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail