| 1 | 1 | Providing, laying, spreading and compacting stone aggregates by manual means of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN (eighty-hundred kilo newton) static roller in stages to proper grade and camber applying and brooming, stone screening/ binding materials to fillup the interstics of course aggregate watering and compacting to the required density Grading-2 (two) as per technical specification clause 405 complete within all leads, lifts, carriage of material and other incidentials charges. | BI01010001010000000000000515BI0100001113 | 210.16 | Per cubic metre |
|---|
| 2 | 2 | Providing and applying primer coat medium porosity with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road srurface and spraying primer at the rate of 0.90 - 1.2 (zero point nine zero - one point two) kilogram per square metre using mechnical means as per technical specification cluase 502 complete within all leads, lifts, carriage of material and other incidentials charges. | | 2756.25 | Per square metre |
|---|
| 3 | 3 | Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor @ 0.20 to 0.30 kg/sqm (at the rate of zero point two zero to zero point three zero kilogramme per square metre) on the prepared bitumenous surface cleaned with Hydraulic broom as per technical specification clause 503 including haulage of material in all leads and lifts by all modes of transportation. | | 5969.25 | Per square metre |
|---|
| 4 | 4 | Providing, laying, spreading and rolling of built-up spray grout layer using bitumen (S-90)/ VG-10 over prepared base by manual means consisting of a two layer composite construction of crushed coarse aggregates using motor grader for aggregates. Key stone chips spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the second layer to serve as a base, conforming to the line, grades and cross-section specified, the compacted layer thickness being 75mm (Seventy five millimetre) as per Technical Specification Clause 505 including haulage of material in all leads and lifts by all modes of transportation. | | 787.5 | Per square metre |
|---|
| 5 | 5 | Providing and Laying 25 mm ( Twenty five millimetre) thick bituminous concrete with 100-120 (Hundred - one hundred twenty) TPH batch type HMP producing an average output of 75 (Seventy five) tonne per hour using crushed aggregate of specified grading, premixed with bituminous binder VG-30 @ 5.50 (at the rate of five point five zero) per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per job mix formula and MORTH specification Cluase 509 including haulage of material in all leads and lifts by all modes of transportation. | | 179.08 | Per cubic metre |
|---|
| 6 | 6 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement mecnically mixed and vibrated and curign complete, thickness as per design, over a prepared sub base, with 43 (forty three) grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 20mm, mixed in a concrete mixer of not less than 0.2 cum (zero point two cubic metre) capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 (one hundred twenty five) micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovles, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 complete within all leads, lifts, carriage of material and other incidentials charges. | | 57.88 | Per cubic metre |
|---|
| 7 | 7 | Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto any lead, dressing of sides and bottoms and back filling in trenches with excavated suitable materials complete within all leads, lifts carriage of material and other incidentials. | | 72 | Per cubic metre |
|---|
| 8 | 8 | Construction of V-Shape Drain with cement concrete 1:3:6 (one cement : three sand : six graded stone aggregate 20mm (twenty millimeter) nominal size) with thickness of concrete as 10cm (ten centimeter) and size of drain 45X25cm (forty five into twenty five centimeter) and curing complete including cost of form work consisting as per standard drawing and HP.PWD. specification as per the direction of Engineer-In-Charge complete in all respect including carriage of material within all leads and lifts and other incidentals. | BI01010001010000000000000515BI0100001114 | 800 | Per running metre |
|---|