Rural Development Department has published Tender For Special Repairs Of P T At Kamathi 1 Tal . Karad Dist Satara. Submission Date for this Tender is 27-02-2020. Percolation Tank Tenders in Special Repairs Of P T At Kamathi 1 Tal.Karad Di Maharashtra. Bidders can get complete Tender details and download the document.
Name of Work: S.R. To P.T at Kamthi 1 Tal Karad Dist Satara | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1.01 | Clearing,Cutting thorney shrubs and bushes in nalla drain and embandment including all lead and lift comp.(Rate as per R.A.) | BI01010001010000000000000515BI0100001113 | 3190 | SQM |
2 | 1.02 | Removing Surface boulders incl. necessary excavation if reqd.and stacking them neatly incl.all lead and lift complete. (Rate as per R.A.) | BI01010001010000000000000515BI0100001114 | 530.74 | Cum |
3 | 1.03 | Excavation inall types of strata excedding 1.50 mts. In width including deposting the material as dierected with lead up to 50 m and lift up to 1.5 m etc. complete in Soil | BI01010001010000000000000515BI0100001115 | 2725.47 | Cum |
4 | 1.04 | Excavation inall types of strata excedding 1.50 mts. In width including deposting the material as dierected with lead up to 50 m and lift up to 1.5 m etc. complete In Hard Murum | 1848.86 | Cum | |
5 | 1.05 | Excavation inall types of strata excedding 1.50 mts. In width including deposting the material as dierected with lead up to 50 m and lift up to 1.5 m etc. complete In Soft Rock | BI01010001010000000000000515BI0100001116 | 108.46 | Cum |
6 | 1.06 | Dewatering of foundation during construction including diversion of stream etc… | 20 | Hrs | |
7 | 1.07 | Filling cut off trench with selected hearting material from borrow area incl. transporting material as directed with all lead and lift incl. laying in layers, leveling,watering and consolidation comp.(Rate as per R.A.) | 625.29 | Cum | |
8 | 1.08 | Construction of embankment for Hearting Zone with selected material from all sources including transporting the material with all lead & lift, laying in layers, leveling, breaking clods and dressing the bank work including watering & consolidation etc. complete From Avilable Material | 700 | Cum | |
9 | 1.09 | Construction of embankment for Hearting Zone with selected material from all sources including transporting the material with all lead & lift, laying in layers, leveling, breaking clods and dressing the bank work including watering & consolidation etc. complete From Borrow Material | 403.39 | Cum | |
10 | 1.1 | Construction of embankment for Casing zone with selected material from all sources including transporting the material with all lead & lift, laying in layers, leveling, breaking clods and dressing the bank work including watering & consolidatio etc. complete From Avilable Material | 1980.4 | Cum | |
11 | 1.11 | Construction of embankment for Casing zone with selected material from all sources including transporting the material with all lead & lift, laying in layers, leveling, breaking clods and dressing the bank work including watering & consolidatio etc. complete From Borrow Material | 785.131 | Cum | |
12 | 1.12 | Providing & laying dry stone pitching 23 cm thick to side slops of embankment including dressing the bank (Rubble 30 to 45 kg) with all lead & lift excluding pointing comp. ( Material From Avilable.) | 1615.3 | SQM | |
13 | 1.13 | Providing & laying dry stone pitching 23 cm thick to side slops of embankment including dressing the bank (Rubble 30 to 45 kg) with all lead & lift excluding pointing comp. ( Material From Borrow) | 1031.58 | SQM | |
14 | 1.14 | Providing & laying in situ cement concrete of following grade of trap/granit/ quartzite/graded quartzite graded metal compacting and curing with all lead & lift complete.M-- 150 (1:2:4) (20 MSA) | 13.19 | Cum | |
15 | 1.15 | Providing and laying polythene film of 031 properly manufactured from 100% virgin granules confirming to I.S. 2508-1984 with 1.5 to 2.5 m. package in rolls as per specifications. C) 500 Microns | 3335 | SQM | |
16 | 1.16 | Providing & fixing M.S.Bar reinforcement for RCC work as per design, drawing and schedule including cutting, bending, hooking laying and binding with wire or tack welding with all lead & lift complete. | 0.198 | M.Ton | |
17 | 1.17 | Cutting down trees including cutting trunks & branches and stacking the material as directed with all lead & lift complete.(Rate as per R.A.) | 25 | Nos | |
18 | 1.18 | Provding and Fixing Name Board as Per Speciafication including painting & Lettering Complete. | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail