Military Engineer Services-MES has published Repairs Maintenance To Rrs Equipments Vehicles And Plants At Af Station Suratgarh. Submission Date for this Tender is 04-03-2020. Vehicle Maintenance Service Tenders in GE (AF) SURATGARH Rajasthan. Bidders can get complete Tender details and download the document.
Name of Work: REPAIRS / MAINT TO RRS EQUIPMENTS, VEHICLES AND PLANTS AT AF STATION SURATGARH | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 0.01 | BOQ (REPAIRS / MAINT TO RRS EQUIPMENTS, VEHICLES AND PLANTS AT AF STATION SURATGARH) | |||
2 | 1 | Supply & fixing in replacement of filter element (Fuel filter, oil filter, air filter, hydraulic filter) set with O ring of Make MICO / JCB / BHEM / L&T / Ashok Leyland /TATA / Eicher or as per sample for the following plants/vehicles , complete all as specified and directed by the Engineer-in-Charge. | |||
3 | 1.01 | Tractor HMT | 3 | Each Job | |
4 | 1.02 | Wheel Loader | 1 | Each Job | |
5 | 1.03 | Vibro Max | 1 | Each Job | |
6 | 1.04 | Crane | 1 | Each Job | |
7 | 1.05 | Mixing Pump Old | 1 | Each Job | |
8 | 1.06 | Mixing Pump New | 1 | Each Job | |
9 | 1.07 | JCB 3DX | 1 | Each Job | |
10 | 1.08 | JCB 4CX | 2 | Each Job | |
11 | 1.09 | JCB Tractor | 1 | Each Job | |
12 | 1.1 | Eicher TG 10.90 | 2 | Each Job | |
13 | 1.11 | Tipper TATA 8 Ton | 2 | Each Job | |
14 | 1.12 | Ashok Leyland flat Trailer | 3 | Each Job | |
15 | 1.13 | Water Lorry Ashok Leyland | 1 | Each Job | |
16 | 1.14 | Motor Cycle Royal Enfield | 2 | Each Job | |
17 | 1.15 | Hero Honda Motor Cycle | 1 | Each Job | |
18 | 1.16 | Tata 207 | 4 | Each Job | |
19 | 1.17 | Eicher 10.75 | 5 | Each Job | |
20 | 1.18 | Tata Xenon | 1 | Each Job | |
21 | 1.19 | Swift Dzire | 1 | Each Job | |
22 | 1.2 | Gypsy | 1 | Each Job | |
23 | 1.21 | Omni | 1 | Each Job | |
24 | 2 | Supply & fixing in replacement of fan belt Complete set of Finner / Dunlop / JCB / BHEML / L&T / Ashoka Leyland / TATA / Eicher or as per sample as required at site for the following plants/vehicles, complete all as specified and directed by the Engineer-in-Charge. \n | |||
25 | 2.01 | Tractor HMT | 3 | Each Job | |
26 | 2.02 | Wheel Loader | 1 | Each Job | |
27 | 2.03 | Vibro Max | 1 | Each Job | |
28 | 2.04 | Crane | 1 | Each Job | |
29 | 2.05 | Mixing Pump Old | 1 | Each Job | |
30 | 2.06 | Mixing Pump New | 1 | Each Job | |
31 | 2.07 | JCB 3DX | 1 | Each Job | |
32 | 2.08 | JCB 4CX | 2 | Each Job | |
33 | 2.09 | JCB Tractor | 1 | Each Job | |
34 | 2.1 | Eicher TG 10.90 | 2 | Each Job | |
35 | 2.11 | Tipper TATA 8 Ton | 2 | Each Job | |
36 | 2.12 | Ashok Leyland flat Trailer | 3 | Each Job | |
37 | 2.13 | Water Lorry Ashok Leyland | 1 | Each Job | |
38 | 2.14 | Tata 207 | 4 | Each Job | |
39 | 2.15 | Eicher 10.75 | 5 | Each Job | |
40 | 2.16 | Tata Xenon | 1 | Each Job | |
41 | 2.17 | Swift Dzire | 1 | Each Job | |
42 | 2.18 | Gypsy | 1 | Each Job | |
43 | 3 | Supply & fixing in replacement of lube oil SAE 15W - 40 for top up and filling up the oil in the sump after Completely flushing the old oil out of the tank and cleaning of the tank for fresh filling , complete all as specified and directed by the Engineer-in-Charge. \nMake : Castrol / HP | 250 | Litres | |
44 | 4 | Supply & fixing in replacement of transmission oil SAE 80W - 90 for top up and filling up the oil in the sump after Completely flushing the old oil out of the tank and cleaning of the tank for fresh filling , complete all as specified and directed by the Engineer-in-Charge. \nMake : Castrol / HP | 300 | Litres | |
45 | 5 | Supply only battery terminal heavy duty as per sample made of brass with bolts and washers , complete all as specified and directed by the Engineer-in-Charge. | 40 | Each | |
46 | 6 | Supply only distilled water to be filled in batteries , complete all as specified and directed by the Engineer-in-Charge. | 300 | Litres | |
47 | 7 | Supply only ignition switch with key for any vehicles/plants as required on site, complete all as specified and directed by the Engineer-in-Charge. | 15 | Each | |
48 | 8 | Supply & fixing in replacement of battery cable of 70 Sqmm PVC insulated multi standard copper conductor single core cable with necessary lugs , complete all as specified and directed by the Engineer-in-Charge. | 60 | Running Metre | |
49 | 9 | Supply only coolent for replacement of old coolent from plants/vehicles, complete all as specified and directed by the Engineer-in-Charge. | 220 | Litres | |
50 | 10 | Supply only hydraulic oil of suitable grade for replacement of old/unserviceable hydraulic oil from plants/vehicles, complete all as specified and directed by the Engineer-in-Charge. | 650 | Litres | |
51 | 11 | Taking down unserviceable fuel injection pump from plants/ vehicles, carrying to workshop for necessary repair including necessary spares and calibration, refixing the same duly repaired to its original position and testing for its serviceability at site , complete all as specified and directed by Engineer-in-Charge for the following vehicls/plants:-\n | |||
52 | 11.01 | Tata 207 | 2 | Each Job | |
53 | 11.02 | Eicher 10.75 | 3 | Each Job | |
54 | 11.03 | Wheel Loader | 1 | Each Job | |
55 | 11.04 | Tractor HMT | 1 | Each Job | |
56 | 11.05 | Ashok Leyland flat Trailer | 1 | Each Job | |
57 | 11.06 | Tipper TATA 8 Ton | 1 | Each Job | |
58 | 11.07 | Eicher TG 10.90 | 1 | Each Job | |
59 | 11.08 | Crane | 1 | Each Job | |
60 | 12 | Supply & fixing in replacement of self starter assembly for vehicles/plants 24 volts DC including, fixing & testing, complete all as specified and directed by the Engineer-in-Charge.\nMake : Lucus-TVS or as per sample | 6 | Each | |
61 | 13 | Supply & fixing in replacement of self starter assembly for vehicles/plants 12 volts DC including Complete fixing & testing, complete all as specified and directed by the Engineer-in-Charge.\nMake : Lucas - TVS or as per sample | 6 | Each | |
62 | 14 | Material and laboure for rewinding the self starter assembly 12/24 volts by taking out from the vehicles dismantling & cleaning, providing proper insulation rewinding with super enameled copper wire of existing size & insulating the field coil assembly & fixing back after repairs including testing complete all as specified and directed by the Engineer-in-Charge | 5 | Each Job | |
63 | 15 | Supply & fixing in replacement of unaerviceable rubber hose set for water circulation of various vehicles/plants as required on site, complete all as specified and directed by the Engineer-in-Charge. | 12 | Each Job | |
64 | 16 | Material and labour for dismantling of radiator assembly from the vehicle and transporting to the civil workshop to repair leakage, cleaning with suitable cleaning agent and filling coolent and fixing back to the vehicle, complete including testing and commissioning all as specified and directed by Engineer-in-Charge for the following vehicls/plants:- | |||
65 | 16.01 | Tractor HMT | 3 | Each Job | |
66 | 16.02 | Wheel Loader | 1 | Each Job | |
67 | 16.03 | Vibro Max | 1 | Each Job | |
68 | 16.04 | Crane | 1 | Each Job | |
69 | 16.05 | Mixing Pump New | 1 | Each Job | |
70 | 16.06 | JCB 3DX | 1 | Each Job | |
71 | 16.07 | JCB 4CX | 2 | Each Job | |
72 | 16.08 | Eicher TG 10.90 | 2 | Each Job | |
73 | 16.09 | Tipper TATA 8 Ton | 2 | Each Job | |
74 | 16.1 | Ashok Leyland flat Trailer | 2 | Each Job | |
75 | 16.11 | Water Lorry Ashok Leyland | 1 | Each Job | |
76 | 16.12 | Tata 207 | 3 | Each Job | |
77 | 16.13 | Eicher 10.75 | 1 | Each Job | |
78 | 16.14 | Tata Xenon | 1 | Each Job | |
79 | 16.15 | Eicher 10.75 | 4 | Each Job | |
80 | 16.16 | Gypsy | 1 | Each Job | |
81 | 16.17 | Omni | 1 | Each Job | |
82 | 17 | Material and labour for dismantling of front / rear wheels from the hub and cleaning, greasing the bearing, cleaning of break liners including supply and fixing of unserviceable break lines, springs & brake shoes, complete all as specified and directed by the Enginner-in-Charge for the following vehicls/plants:- | |||
83 | 17.01 | Wheel Loader | 1 | Each Job | |
84 | 17.02 | Vibro Max | 1 | Each Job | |
85 | 17.03 | Crane | 1 | Each Job | |
86 | 17.04 | JCB 3DX | 1 | Each Job | |
87 | 17.05 | JCB 4CX | 2 | Each Job | |
88 | 17.06 | Eicher TG 10.90 | 2 | Each Job | |
89 | 17.07 | Tipper TATA 8 Ton | 2 | Each Job | |
90 | 17.08 | Ashok Leyland flat Trailer | 3 | Each Job | |
91 | 17.09 | Ashok Leyland water lorry | 1 | Each Job | |
92 | 17.1 | Tata 207 | 3 | Each Job | |
93 | 17.11 | Eicher 10.75 | 4 | Each Job | |
94 | 17.12 | Tata Xenon | 1 | Each Job | |
95 | 17.13 | Swift Dzire | 1 | Each Job | |
96 | 17.14 | Gypsy | 1 | Each Job | |
97 | 17.15 | Motor Cycle Royal Enfield | 2 | Each Job | |
98 | 17.16 | Motor Cylcle Hero Honda | 1 | Each Job | |
99 | 17.17 | JCB Tractor | 1 | Each Job | |
100 | 17.18 | Omni | 1 | Each Job | |
101 | 18 | Overhauling of engine after dismantling of parts tuning cleaning of distributors, greasing/oiling assembling/testing all as per requirement of engine and replacement of following parts:-\n(i) replacement of timing seal\n(ii) replacement of oil seal\n(iii) replacement of head value seal (Set of 04)\n(iv) replacement of head gasket Part No ID200489\n(v) replacement of tippet cover gasket\n(vi) replacement of head valve (Set of 4)\n(vii) replacement of cylinder head valve (Set of 4)\n(viii) replacement of cylinder head (Set of 6)\n(ix) replacement of seat exhaust valve\n(x) replacement of guide exhaust valve (Set of 4)\n(xi) replacement of Cap sealing MS66137 (Set of 4)\n(xii) replacement of ring gear flying Part No ME 012509\n(xiii) replacement of bearing connecting rod (Set of 2)\n(xiv) replacement of ring set pisten (Each set)\n(xv) replacement of piston engine | |||
102 | 18.01 | Tractor HMT | 1 | Each Job | |
103 | 18.02 | Wheel Loader | 1 | Each Job | |
104 | 18.03 | Crane | 1 | Each Job | |
105 | 18.04 | Eicher TG 10.90 | 1 | Each Job | |
106 | 18.05 | Tipper TATA 8 Ton | 1 | Each Job | |
107 | 18.06 | Ashok Leyland Flat Trailer | 1 | Each Job | |
108 | 18.07 | Ashok Leyland water lorry | 1 | Each Job | |
109 | 18.08 | Tata 207 | 2 | Each Job | |
110 | 18.09 | Vibro Max | 1 | Each Job | |
111 | 18.1 | Eicher 10.75 | 2 | Each Job | |
112 | 19 | Taking down road spring both side tempering the same with height, bending process and refixing the same in existing position after repairing the following:-\n(i) replacement of main 2nd leaf both side rear road spring each side - 2 Nos\n(ii) replacement of centre bolt - 02 Nos\n(iii) replacement of road spring U bolt - 02 Nos\n(iv) replacement of distance piece | |||
113 | 19.01 | Eicher TG 10.90 | 2 | Each Job | |
114 | 19.02 | Tipper TATA 8 Ton | 2 | Each Job | |
115 | 19.03 | Ashok Leyland flat Trailer | 3 | Each Job | |
116 | 19.04 | Water Lorry Ashok Leyland | 1 | Each Job | |
117 | 19.05 | Tata 207 | 4 | Each Job | |
118 | 19.06 | Gypsy | 1 | Each Job | |
119 | 19.07 | Tata Xenon | 1 | Each Job | |
120 | 19.08 | Swift Dzire | 1 | Each Job | |
121 | 19.09 | Eicher 10.75 | 5 | Each Job | |
122 | 19.1 | Omni | 1 | Each Job | |
123 | 20 | Overhauling, repair and replacement of steering gear to axle, steering gear bolts and tie rod outer ball joint rubber lubricates steering rack and pinion with steering moving part, wheel alignment and steering connection and front hub bearing for the following vehicles/plants, complete all as specified and directed by the Engineer-in-Charge. | |||
124 | 20.01 | Tractor HMT | 3 | Each Job | |
125 | 20.02 | Wheel Loader | 1 | Each Job | |
126 | 20.03 | JCB 3DX | 1 | Each Job | |
127 | 20.04 | JCB 4CX | 2 | Each Job | |
128 | 20.05 | Eicher TG 10.90 | 1 | Each Job | |
129 | 20.06 | Tipper TATA 8 Ton | 1 | Each Job | |
130 | 20.07 | Ashok Leyland flat Trailer | 2 | Each Job | |
131 | 20.08 | Ashok Leyland water lorry | 1 | Each Job | |
132 | 20.09 | Tata 207 | 3 | Each Job | |
133 | 20.1 | Eicher 10.75 | 3 | Each Job | |
134 | 20.11 | Gypsy | 1 | Each Job | |
135 | 20.12 | Omni | 1 | Each Job | |
136 | 21 | Supply and fixing in replacement of head lamp, instrument lamp, sides and tail, lights for the following plants/vehicles, complete all as specified and directed by the Engineer-in-Charge. | |||
137 | 21.01 | Tractor HMT | 2 | Each Set | |
138 | 21.02 | Wheel Loader | 1 | Each Set | |
139 | 21.03 | Crane | 1 | Each Set | |
140 | 21.04 | Mixing Pump New | 1 | Each Set | |
141 | 21.05 | JCB 3DX | 1 | Each Set | |
142 | 21.06 | JCB 4CX | 1 | Each Set | |
143 | 21.07 | Eicher TG 10.90 | 1 | Each Set | |
144 | 21.08 | Tipper TATA 8 Ton | 1 | Each Set | |
145 | 21.09 | Ashok Leyland flat Trailer | 2 | Each Set | |
146 | 21.1 | Ashok Leyland water lorry | 1 | Each Set | |
147 | 21.11 | Motor Cycle Royal Enfield | 2 | Each Set | |
148 | 21.12 | Motor Cycle Hero Honda | 1 | Each Set | |
149 | 21.13 | Tata 207 | 4 | Each Set | |
150 | 21.14 | Gypsy | 1 | Each Set | |
151 | 21.15 | Eicher 10.75 | 4 | Each Set | |
152 | 21.16 | Tata Xenon | 1 | Each Set | |
153 | 21.17 | Swift Dzire | 1 | Each Set | |
154 | 21.18 | JCB Tractor | 1 | Each Set | |
155 | 21.19 | Omni | 1 | Each Set | |
156 | 22 | Dismantling of old parts for the following vehicle/plants and providing new parts are as under :-\n(i) replacement of door lock set (Set of 2)\n(ii) replacement of side mirror (Set of 2)\n(iii) replacement of rubber foot mat (Set of 2)\n(iv) replacement of door rubber gasket and beading of glass. | |||
157 | 22.01 | JCB 3DX | 1 | Each Job | |
158 | 22.02 | JCB 4CX | 2 | Each Set | |
159 | 22.03 | Eicher TG 10.90 | 1 | Each Set | |
160 | 22.04 | Tipper TATA 8 Ton | 1 | Each Set | |
161 | 22.05 | Ashok Leyland flat Trailer | 3 | Each Set | |
162 | 22.06 | Ashok Leyland water lorry | 1 | Each Set | |
163 | 22.07 | Tata 207 | 4 | Each Set | |
164 | 22.08 | Gypsy | 1 | Each Set | |
165 | 22.09 | Eicher 10.75 | 4 | Each Set | |
166 | 22.1 | Omni | 1 | Each Set | |
167 | 23 | Supply and fixig in replacement of clutch plate/pressure plate of the following vehicle/plants:- | |||
168 | 23.01 | Tractor HMT | 2 | Each Job | |
169 | 23.02 | JCB Tractor | 1 | Each Job | |
170 | 23.03 | Eicher TG 10.90 | 2 | Each Job | |
171 | 23.04 | Tipper TATA 8 Ton | 2 | Each Job | |
172 | 23.05 | Ashok Leyland flat Trailer | 3 | Each Job | |
173 | 23.06 | Water Lorry Ashok Leyland | 1 | Each Job | |
174 | 23.07 | Motor Cycle Royal Enfield | 2 | Each Job | |
175 | 23.08 | Motor Cycle Hero Honda | 1 | Each Job | |
176 | 23.09 | Tata 207 | 4 | Each Job | |
177 | 23.1 | Gypsy | 1 | Each Job | |
178 | 23.11 | Eicher 10.75 | 4 | Each Job | |
179 | 23.12 | Omni | 1 | Each Job | |
180 | 24 | Material and labour for making smooth surface by scratching the old paints and rubbing with emery paper, removing all dents and filling putty in dents where required, appling two coats of synthetic enamel over and including one coat of red oxide primer as per existing colour DUCO paint with spraying process including writing of BA No and making MES sign on following vehicles/plants , complete all as specified and directed by the Engineer-in-Charge. | |||
181 | 24.01 | Tractor HMT | 3 | Each Job | |
182 | 24.02 | Wheel Loader | 1 | Each Job | |
183 | 24.03 | Vibro Max | 1 | Each Job | |
184 | 24.04 | Crane | 1 | Each Job | |
185 | 24.05 | Mixing Pump Old | 1 | Each Job | |
186 | 24.06 | Mixing Pump New | 1 | Each Job | |
187 | 24.07 | JCB 3DX | 1 | Each Job | |
188 | 24.08 | JCB 4CX | 2 | Each Job | |
189 | 24.09 | JCB Tractor | 1 | Each Job | |
190 | 24.1 | Eicher TG 10.90 | 2 | Each Job | |
191 | 24.11 | Tipper TATA 8 Ton | 2 | Each Job | |
192 | 24.12 | Ashok Leyland flat Trailer | 3 | Each Job | |
193 | 24.13 | Gypsy | 1 | Each Job | |
194 | 24.14 | Ashoka Leyland water lorry (including painting of inner and outer side of tank) | 1 | Each Job | |
195 | 24.15 | Motor Cycle Royal Enfield | 2 | Each Job | |
196 | 24.16 | Motor Cycle Hero Honda | 1 | Each Job | |
197 | 24.17 | Tata 207 | 4 | Each Job | |
198 | 24.18 | Eicher 10.75 | 4 | Each Job | |
199 | 24.19 | Omni | 1 | Each Job | |
200 | 25 | Removing broken wind shield glass and supply and fixing wind shield glass with suitable size of rubber beeding of following vehicles complete all as specified and directed by the Engineer-in-Charge. \nMake : Saint gobain sekurit - or equivalent model approved by GE. | |||
201 | 25.01 | Tata 207 | 1 | Each Job | |
202 | 25.02 | JCB 3DX | 1 | Each Job | |
203 | 25.03 | Eicher 10.75 | 1 | Each Job | |
204 | 26 | Material and labour for replacement of seat cover for using existing quality of rexin, stitching for suitable size of existing seat of following Vehicles complete all as specified and directed by the Engineer-in-Charge. | |||
205 | 26.01 | Tata 207 (font seat and rear seat) | 3 | Each Job | |
206 | 26.02 | Eicher 10.75 | 4 | Each Job | |
207 | 26.03 | Gypsy | 1 | Each Job | |
208 | 26.04 | Tractor HMT | 2 | Each Job | |
209 | 26.05 | Wheel Loader | 1 | Each Job | |
210 | 26.06 | Vibro Max | 1 | Each Job | |
211 | 26.07 | Crane | 1 | Each Job | |
212 | 26.08 | JCB 3DX | 1 | Each Job | |
213 | 26.09 | JCB 4CX | 2 | Each Job | |
214 | 26.1 | JCB Tractor | 1 | Each Job | |
215 | 26.11 | Tipper TATA 8 Ton | 2 | Each Job | |
216 | 26.12 | Ashok Leyland flat Trailer | 3 | Each Job | |
217 | 26.13 | Ashoka Leyland water lorry | 1 | Each Job | |
218 | 26.14 | Eicher TG 10.90 | 2 | Each Job | |
219 | 27 | Dismantling the hydraulic system of the plants and supplying and fixing of new seals and pressure lines and sydraulic system fixing back to plant, complete testing of the following plants complete all as directed by Engineer-in-charge:- | |||
220 | 27.01 | Wheel Loader | 1 | Each Job | |
221 | 27.02 | Crane | 1 | Each Job | |
222 | 27.03 | JCB 3DX | 1 | Each Job | |
223 | 27.04 | JCB 4CX | 2 | Each Job | |
224 | 27.05 | JCB Tractor | 1 | Each Job | |
225 | 27.06 | Tipper TATA 8 Ton | 2 | Each Job | |
226 | 28 | Supply and fixing in replacement of Dry unserviceable cells of 12 V battery for vehicles, of the following capacity of battery complete all as directed by Engineer-in-charge:-\nMake : Exide / Amron / Amco | |||
227 | 28.01 | 130 AH | 10 | Each | |
228 | 28.02 | 90 AH | 15 | Each | |
229 | 28.03 | 70 AH | 8 | Each | |
230 | 29 | Taking down the old unserviceable control panel with switches / relay and re-fixing the same after repair / replacement of switches / relay of the following plants complete all as directed by Engineer-in-charge:- | |||
231 | 29.01 | Wheel Loader | 1 | Each Job | |
232 | 29.02 | Crane | 1 | Each Job | |
233 | 29.03 | JCB 3DX | 1 | Each Job | |
234 | 29.04 | JCB 4CX | 2 | Each Job | |
235 | 29.05 | Vibro Max | 1 | Each Job | |
236 | 29.06 | JCB Tractor | 1 | Each Job | |
237 | 30 | Overhauling, repair and replacement of oil for front and back Shock Absorbers of the following vehicles complete all as directed by Engineer-in-charge:- | |||
238 | 30.01 | Motor Cycle Royal Enfield | 2 | Each Job | |
239 | 30.02 | Motor Cycle Hero Honda | 1 | Each Job | |
240 | 31 | Taking down the old unserviceable Exhaust Muffler and supplying & fixing of Exhaust Muffler of following vehicles complete all as directed by Engineer-in-charge:- | |||
241 | 31.01 | Motor Cycle Royal Enfield | 1 | Each Job | |
242 | 31.02 | Motor Cycle Hero Honda | 1 | Each Job | |
243 | 31.03 | TATA 207 | 2 | Each Job | |
244 | 31.04 | Eicher 10.75 | 3 | Each Job | |
245 | 32 | Supplying and fixing in repalcement of complete lock system including handle lock and ignition lock of the following vehicles complete all as directed by Engineer-in-charge:- | |||
246 | 32.01 | Motor Cycle Royal Enfield | 2 | Each Job | |
247 | 32.02 | Motor Cycle Hero Honda | 1 | Each Job | |
248 | 33 | Taking down tyre with drum of following Vehicles / plants and re-fixing the tyre after making puncture of the inner tube complete all as directed by Engineer-in-charge:- | |||
249 | 33.01 | Tractor HMT | 12 | Each Job | |
250 | 33.02 | Wheel Loader | 4 | Each Job | |
251 | 33.03 | Vibro Max | 2 | Each Job | |
252 | 33.04 | Crane | 4 | Each Job | |
253 | 33.05 | Mixing Pump Old | 2 | Each Job | |
254 | 33.06 | Mixing Pump New | 2 | Each Job | |
255 | 33.07 | JCB 3DX | 8 | Each Job | |
256 | 33.08 | JCB 4CX | 4 | Each Job | |
257 | 33.09 | JCB Tractor | 10 | Each Job | |
258 | 33.1 | Eicher TG 10.90 | 10 | Each Job | |
259 | 33.11 | Tipper TATA 8 Ton | 16 | Each Job | |
260 | 33.12 | Ashok Leyland flat Trailer | 8 | Each Job | |
261 | 33.13 | Ashoka Leyland water lorry | 4 | Each Job | |
262 | 33.14 | Motor Cycle Royal Enfield | 2 | Each Job | |
263 | 33.15 | Motor Cycle Hero Honda | 12 | Each Job | |
264 | 33.16 | Tata 207 | 20 | Each Job | |
265 | 33.17 | Eicher 10.75 | 4 | Each Job | |
266 | 33.18 | Tata Xenon | 4 | Each Job | |
267 | 33.19 | Swift Dzire | 4 | Each Job | |
268 | 33.2 | Gypsy | 4 | Each Job | |
269 | 33.21 | Omni | 4 | Each Job | |
270 | 34 | Supply and fixing in replacement of wind shield wiper set with motor of the following vehicles complete all as directed by Engineer-in-charge:- | |||
271 | 34.01 | TATA 207 | 2 | Each Job | |
272 | 34.02 | Eicher 10.75 | 2 | Each Job | |
273 | 35 | Repair of alternator of following plants / vehicles including replacement of coils and ensuring proper charging of battery complete all as directed by Engineer-in-charge:- | |||
274 | 35.01 | TATA 207 | 2 | Each Job | |
275 | 35.02 | Eicher 10.75 | 2 | Each Job | |
276 | 35.03 | Tipper TATA 8 Ton | 1 | Each Job | |
277 | 35.04 | Ashok Leyland flat Trailer | 1 | Each Job | |
278 | 35.05 | Eicher TG 10.90 | 1 | Each Job | |
279 | 35.06 | Motor Cycle Royal Enfield | 1 | Each Job | |
280 | 36 | Repair ladder system of Eicher, overhauling the complete ladder system, changing the Rope/Srting with new one and replacement of worn out part such as fasteners etc as required and making it fully fuctional complete all as directed by Engineer-in-charge. | 1 | Each Job | |
281 | 37 | Supply and fixing in replacement of rear view mirror of the following vehicles complete all as directed by Engineer-in-charge:- | |||
282 | 37.01 | TATA 207 | 2 | Each Job | |
283 | 37.02 | Eicher 10.75 | 3 | Each Job | |
284 | 37.03 | Tata Xenon | 1 | Each Job | |
285 | 37.04 | Swift Dzire | 1 | Each Job | |
286 | 38 | Repair of all seats (except seat cover) of the following vehicles/plants including fixing properly using fasteners or welding as required and making good complete all as directed by Engineer-in-charge:- | |||
287 | 38.01 | TATA 207 | 2 | Each Job | |
288 | 38.02 | Eicher 10.75 | 3 | Each Job | |
289 | 38.03 | Ashok Leyland flat Trailer | 1 | Each Job | |
290 | 38.04 | Gypsy | 1 | Each Job | |
291 | 39 | Contract Amount shall be derived after affecting the amount of Schedule of Credit in General Summary on serial page No 15 of tender documents. |