Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #23595825

E-Nit No-01/Trda/19-20-06 Construction Of Pcc Road , Ghat And Mukhagnitala At Laha , Mouza-Laha , Budhigram G . P , Under Trda During The 19-20

Issued by Local Bodies · TARAPITH, West Bengal
Tender Value
34.16 Lakhs
Estimated cost
Bid Submission
03 Mar 2020
0 days left
EMD
68331
Bank guarantee accepted
Document Fee
3000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
TARAPITH → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

E-Nit No-01/Trda/19-20-06 Construction Of Pcc Road , Ghat And Mukhagnitala At Laha , Mouza-Laha , Budhigram G . P , Under Trda During The 19-20

BOQ

Name of Work:\"Construction of PCC road, Ghat and Mukhaganitala at Laha, Mouza-Laha, Budhigram G.P. under T.R.D.A During the year 2019-20A\".
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11ROAD:-\nDressing and chilchalling Road flanks including cutting and filling with earth up to 150 mm average thickness finished with outward cross-grade of 1 in 30.1536sqm
22Supplying, spreading and consolidating Stone Dustto a depth of 100 mm and above at desired density and C.B.R. as per Specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants complete as per specification. (The payment is to be made on the basis of the finished compacted volume of stone dust.230.4cum
33Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.1536sqm
44Providing and laying Design Mix concrete for plain / reinforced concrete workin any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. (a) M-20 Grade291.84cum
55Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.(b)Where staging is not required.182.4sqm
66Supplying and laying thermocol sheet. (20mm thick) for expension joint48.64sqm
77Mukhagani Shed:-\nEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge7.27cum
88Sand Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand.8.49cum
99Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.20.51sqm
1010Plain Cement Concrete (1:3:6) with graded stone chips (40mm down) excluding shuttering3.126cum
1111Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including reparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control,sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works M-206.3cum
1212Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL0.396MT
1313Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof)\n(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.47.22sqm
1414First class Brick work in cement mortar (1:6) including cost of scaffolding \n(a) In foundation and plinth2.438cum
1515(b) In super structure0.94cum
1616Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] \nb) 15 mm thick\n26.5sqm
1717c) 10mm thick Plaser14.19sqm
1818Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.12.6sqm
1919Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor)13.9sqm
2020Supplying, fitting and fixing Marble Slab/tile of 15 to 18 mm thickness in floor, lobby, stair, landing & treads etc. over 20 mm (av.) thck base of Cement mortar (1:2) laid with white cement slurry @ 4.4 kg/Sq.m before placing marble & jointed with white cement slurry @ 2.0 kg/Sq.m with necessary pigments including grinding and Granite polishing as per direction of Engineering -in -Charge in Ground Floor. {White cement and Pigment to be supplied by the Agency]\n(a) With Makrana plain pink / Adranga Pink / Garbh Gulabi / Udaypur pink / Udaypur Green / Black Bhaslana\n(i) Area of each Slab/tile upto 0.3 sq.m.22.4sqm
2121Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick)13.9sqm
2222Supplying, fitting and fixing Stainless Steel railing consist of 38mm dia and 900mm height vertical balustrade at every two alternative steps, 50mm dia top rail, 3 (three) nos 19mm dia horizontal Strainless steel pipe and base/cover plate with Strainless Steel GRADE 304 containing 7.5% nickle (Interior Grade) Brushed/Mat finish, complete as per direction of the Engineer-in-charge. Weight of Strainless Steel railing per metre 6.5 Kg (approx)14m
2323GHAT:-\nEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge78.33cum
2424(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)(B) Do - by fine sand22.32cum
2525(I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety](a) 1:3:6 proportion5.832cum
2626Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including reparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control,sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. M-2064.887cum
2727Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (i) Tor steel/Mild Steel4.005MT
2828Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.\n113.73sqm
2929125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.57.285sqm
3030Supplying, fitting, fixing marble slab/tiles, 15 mm. to 18 mm. thick in dado / wall in 15 mm thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass / copper hooks applying white cement slurry @ 4.4 kg/ sq.m at the back side of marble & pointing in cement mortar (1:2) (1 cement, 2 marble dust) with admixture of pigment matching the stone shades including polishing all complete as per direction of the Engineer-in-charge including cost of materials, labours, scaffolding, staging, curing complete. [White cement, Pigment to be supplied by the Agency]\n (ii) Area of each slab/tile exceeding 0.3sq.m. but not exceeding 0.6 sq.m301.92sqm
3131Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor)91.65sqm
3232Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor)30.55sqm
3333Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.91.65sqm
3434CGST + SGST ( 12 % )1Item
3535Cess ( 1 % )1Item

AI Tender Summary

OUR REF NO 23595825
AUTHORITY Local Bodies
TENDER VALUE 34.16 Lakhs
LAST DATE 03-03-2020
Authority
Authority Name TARAPITH RAMPURHAT DEVELOPMENT AUTHORITY
Work Description E-Nit No-01/Trda/19-20-06 Construction Of Pcc Road , Ghat And Mukhagnitala At Laha , Mouza-Laha , Budhigram G . P , Under Trda During The 19-20
Basic Detail
Tender No e-NIT NO-01/TRDA/19-20-01
Bidding Type Tender
Location
City TARAPITH
State West Bengal
Key Dates
Publish Date 12 Feb 2020
Submission Date 03 Mar 2020
Open Date 06 Mar 2020
Finance
Tender Value 34.16 Lakhs
Tender Fee 3000
EMD 68331
Exemption Not Available
Document List
BIF.xls
SBD012020.pdf
1A95B8F4-5E42-4078-8442-22460FD6215B.html
Tender-document.pdf
BOQ_498716.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 12, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 03, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 06, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BIF.xls

pdf

SBD012020.pdf

html

1A95B8F4-5E42-4078-8442-22460FD6215B.html

pdf

Tender-document.pdf

xls

BOQ_498716.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders