E-Nit No-01/Trda/19-20-06 Construction Of Pcc Road , Ghat And Mukhagnitala At Laha , Mouza-Laha , Budhigram G . P , Under Trda During The 19-20
Tender Value
34.16 Lakhs
Estimated cost
Bid Submission
03 Mar 2020
0 days left
EMD
68331
Bank guarantee accepted
Document Fee
3000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
TARAPITH → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
E-Nit No-01/Trda/19-20-06 Construction Of Pcc Road , Ghat And Mukhagnitala At Laha , Mouza-Laha , Budhigram G . P , Under Trda During The 19-20
BOQ
| Name of Work:\"Construction of PCC road, Ghat and Mukhaganitala at Laha, Mouza-Laha, Budhigram G.P. under T.R.D.A During the year 2019-20A\". | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | ROAD:-\nDressing and chilchalling Road flanks including cutting and filling with earth up to 150 mm average thickness finished with outward cross-grade of 1 in 30. | 1536 | sqm | |
| 2 | 2 | Supplying, spreading and consolidating Stone Dustto a depth of 100 mm and above at desired density and C.B.R. as per Specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants complete as per specification. (The payment is to be made on the basis of the finished compacted volume of stone dust. | 230.4 | cum | |
| 3 | 3 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 1536 | sqm | |
| 4 | 4 | Providing and laying Design Mix concrete for plain / reinforced concrete workin any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. (a) M-20 Grade | 291.84 | cum | |
| 5 | 5 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.(b)Where staging is not required. | 182.4 | sqm | |
| 6 | 6 | Supplying and laying thermocol sheet. (20mm thick) for expension joint | 48.64 | sqm | |
| 7 | 7 | Mukhagani Shed:-\nEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge | 7.27 | cum | |
| 8 | 8 | Sand Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. | 8.49 | cum | |
| 9 | 9 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 20.51 | sqm | |
| 10 | 10 | Plain Cement Concrete (1:3:6) with graded stone chips (40mm down) excluding shuttering | 3.126 | cum | |
| 11 | 11 | Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including reparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control,sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works M-20 | 6.3 | cum | |
| 12 | 12 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL | 0.396 | MT | |
| 13 | 13 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof)\n(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. | 47.22 | sqm | |
| 14 | 14 | First class Brick work in cement mortar (1:6) including cost of scaffolding \n(a) In foundation and plinth | 2.438 | cum | |
| 15 | 15 | (b) In super structure | 0.94 | cum | |
| 16 | 16 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] \nb) 15 mm thick\n | 26.5 | sqm | |
| 17 | 17 | c) 10mm thick Plaser | 14.19 | sqm | |
| 18 | 18 | Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. | 12.6 | sqm | |
| 19 | 19 | Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor) | 13.9 | sqm | |
| 20 | 20 | Supplying, fitting and fixing Marble Slab/tile of 15 to 18 mm thickness in floor, lobby, stair, landing & treads etc. over 20 mm (av.) thck base of Cement mortar (1:2) laid with white cement slurry @ 4.4 kg/Sq.m before placing marble & jointed with white cement slurry @ 2.0 kg/Sq.m with necessary pigments including grinding and Granite polishing as per direction of Engineering -in -Charge in Ground Floor. {White cement and Pigment to be supplied by the Agency]\n(a) With Makrana plain pink / Adranga Pink / Garbh Gulabi / Udaypur pink / Udaypur Green / Black Bhaslana\n(i) Area of each Slab/tile upto 0.3 sq.m. | 22.4 | sqm | |
| 21 | 21 | Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick) | 13.9 | sqm | |
| 22 | 22 | Supplying, fitting and fixing Stainless Steel railing consist of 38mm dia and 900mm height vertical balustrade at every two alternative steps, 50mm dia top rail, 3 (three) nos 19mm dia horizontal Strainless steel pipe and base/cover plate with Strainless Steel GRADE 304 containing 7.5% nickle (Interior Grade) Brushed/Mat finish, complete as per direction of the Engineer-in-charge. Weight of Strainless Steel railing per metre 6.5 Kg (approx) | 14 | m | |
| 23 | 23 | GHAT:-\nEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge | 78.33 | cum | |
| 24 | 24 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)(B) Do - by fine sand | 22.32 | cum | |
| 25 | 25 | (I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety](a) 1:3:6 proportion | 5.832 | cum | |
| 26 | 26 | Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including reparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control,sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. M-20 | 64.887 | cum | |
| 27 | 27 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (i) Tor steel/Mild Steel | 4.005 | MT | |
| 28 | 28 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.\n | 113.73 | sqm | |
| 29 | 29 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 57.285 | sqm | |
| 30 | 30 | Supplying, fitting, fixing marble slab/tiles, 15 mm. to 18 mm. thick in dado / wall in 15 mm thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass / copper hooks applying white cement slurry @ 4.4 kg/ sq.m at the back side of marble & pointing in cement mortar (1:2) (1 cement, 2 marble dust) with admixture of pigment matching the stone shades including polishing all complete as per direction of the Engineer-in-charge including cost of materials, labours, scaffolding, staging, curing complete. [White cement, Pigment to be supplied by the Agency]\n (ii) Area of each slab/tile exceeding 0.3sq.m. but not exceeding 0.6 sq.m | 301.92 | sqm | |
| 31 | 31 | Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor) | 91.65 | sqm | |
| 32 | 32 | Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor) | 30.55 | sqm | |
| 33 | 33 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. | 91.65 | sqm | |
| 34 | 34 | CGST + SGST ( 12 % ) | 1 | Item | |
| 35 | 35 | Cess ( 1 % ) | 1 | Item |
AI Tender Summary
Tender Timeline
Feb 12, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedMar 03, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMar 06, 2020
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer